The National Science Foundation * Office of Polar Programs * United States Antarctic Program Division of Antarctic Infrastructure and Logistics Future.

Slides:



Advertisements
Similar presentations
Strategic Overview of policies to deliver the 80% emissions reduction target Cameron Maxwell Climate Change Division, the Scottish Government Sustainable.
Advertisements

Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
Polar Research Support Erick Chiang Head, Polar Research Support Section.
NIST MEP Green Suppliers Network E3: Columbus (E nergy, E conomy, E nvironment )
Protecting Public Safety, Public Health, Public Assets and a Special Quality of Life FY08 Town of Sudbury Budget – Article 3.
NOAA in the Antarctic James H. Butler, Director Global Monitoring Division Earth System Research Laboratory National Oceanic and Atmospheric Administration.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
HB1438 Update & Statewide Capital Planning Initiative Office of State Finance Department of Central Services November 8, 2011.
Key Factors in the Introduction of Hydrogen as the Sustainable Fuel of the Future John P Blakeley, Research Fellow Jonathan D Leaver, Chairman Centre for.
THE NORTH CAROLINA AGRICULTURAL WATER RESOURCES ASSISTANCE PROGRAM NC Water Resources Congress October 30, 2014.
1 ACT AND ADAPT: CLIMATE CHANGE IN SCOTLAND Climate Change Division.
Instructional Materials Process and Progress Update Chief Academic Officer Quarterly Meeting November 13, 2012.
US Antarctic Program Antarctic Science (Scott Borg) Antarctic Infrastructure & Logistics (Brian Stone) Polar Environment, Health and Safety (Polly Penhale)
Environmental Performance and Energy Efficiency of Supply Chains: Carbon Footprint Project Progress Update Angelina Ermakov, Transportation Working Group.
MODULE “STRATEGY DEVELOPMENT”
Implementing Sustainable Development Sustainable Procurement & Corporate Social Responsibility Achieving Level 3 of the Flexible Framework.
LOW CARBON TRANSIT OPERATIONS PROGRAM [SB 862 (2014)] DECEMBER 2014.
Hazardous Materials Emergency Preparedness Grant Oregon SERC/LEPC Conference 2015 Oregon Office of State Fire Marshal 1.
Siemens sans siemens sans bold siemens sans italic siemens sans italic bold siemens sans black siemens black italic Siemens Building Technologies.
Public Transit Department Bus and Fuel Procurement Strategy AzTA/ADOT Transit Conference April 2013.
 Materials – Highest & Best Use  Public Health  Safety  The Environment  Safety  Reliability  Performance  Flexibility  Productivity Improve Mobility.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
PRESENTATION OF FLEET AND FUEL CONSOLIDATION BUDGET AND FISCAL AFFAIRS COMMITTEE AUGUST 31, 2010.
Wisconsin Home Energy Assistance Program (WHEAP) - Kenna Arvold, Lead Administrative Review Monitor - Jeff Heino, Administrative Review Monitor.
UW Cooperative Extension Land Use Education Programs Comprehensive Planning Overview March 15th Osceola WI Polk County UWEX-Cooperative Extension.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
A Status Report on Wind Energy Opportunities in Canada Robert Hornung, CanWEA EWEA Conference March 2, Athens.
U.S. Antarctic Program Resupply Perspectives Brian Stone Antarctic Infrastructure & Logistics.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
FHWA Update Butch Wlaschin, P.E. Director, Office of Asset Management AASHTO Highway Subcommittee on Construction 2010 Annual Meeting Burlington, Vermont.
ESRC WIND POWER SEMINAR, BELFAST ROSEMARY THOMAS HEAD OF PLANNING DIVISION WELSH ASSEMBLY GOVERNMENT 4th November 2008.
Efficiency through technology and collaboration SHRP2 and Every Day Counts Products September 9, 2015 David Otte - KYTC Jason J. Siwula, PE – KYTC.
State Board of Education Meeting Race to the Top Update August 1, RTTT3 Overview Allocation of Funds (State and District) State-Level Activities.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Presentation to the Information Services Board March 6, 2008 Bill Kehoe, Chief Information Officer Bill Kehoe, Chief Information Officer.
Office Advisory Committee Update May 2012 Antarctic Infrastructure & Logistics Brian W. Stone Division Director.
Joint Canada-Mexico-USA (North American*) Carbon Program Planning Meeting January 25–26, 2007 *By North America we mean the North American land, adjacent.
Weathering the Change Action Plan 2 ACT Climate Change Council 8 November 2011.
Working Smart for the Customer’s Benefit Pam Hutton AASHTO SHRP2 Implementation Manager June 11, 2013.
Conservation and Climate Action Plan. Outline History and background The Conservation & Climate Action Plan Plan to succeed Steps to adoption.
Antarctic Infrastructure and Logistics Update Erick Chiang Section Head Polar Research Support Section Office of Polar Programs.
Geospatial LoB: Lifecycle WG Update November 3, 2009.
1 ARENA Workshop Renewables for Industrial Processes.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
1 Strategic Plan Review. 2 Process Planning and Evaluation Committee will be discussing 2 directions per meeting. October meeting- Finance and Governance.
Regulatory Streamlining Task Force Update Discussion Item December 6, 2011 Board of County Commissioners.
1 UNEP Global Mercury Partnership April UN General Assembly Resolution 60/215 defines partnerships as… “voluntary and collaborative relationships.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
AB 32 Update December 6, Outline Cap and Trade Program 2013 Update to Scoping Plan Looking ahead to
University of Wyoming Financial Reporting Initiative Update April 2016.
TIER IT Inventory CITI Meeting November 6,
Multi-Use Application Use Case #3: Optimized Pricing and Resource Allocation (OPRA) Project. May 3, 2016.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Transportation Round Table Loudoun County: Preparing for Silver Line Metrorail Phase 2 Dulles Area Transportation Association June 15, 2016.
APTA Sustainability Workshop 2016
Fort Stanwix National Monument Energy Audit Contract
Affordable Energy Production from Renewable Fuel
MULTI-PURPOSE DOCK GARY PAXTON INDUSTRIAL PARK | SITKA, ALASKA
FY 2017 Recommended Capital Plan
Implementing the Transportation/Land Use Connection Program
City-wide LED Street Light Conversion Program
Landscape management and Operations accreditation Program
APTA Sustainability Workshop 2016
GENERAL SERVICES DEPARTMENT Facilities Management Division PROOF –NM (Process Reengineering & Optimization of O&M Functions for New Mexico) Phase II.
Department of Licensing HP 3000 Replatforming Project Closeout Report
SWAC – Agenda 10/23/18 Chapter 6 – Alternative Technology – Draft Findings 2. Chapter 7 – Draft Landfill Disposal Existing Disposal System Disposal Options.
Presentation transcript:

The National Science Foundation * Office of Polar Programs * United States Antarctic Program Division of Antarctic Infrastructure and Logistics Future Directions and Challenges OPP Office Advisory Committee November 8-9, 2007

Insuring McMurdo Fuel Supply Phased construction of 4 additional 2 M gal fuel storage tanks – construction beginning in FY 08, completion in FY 11 Phased delivery of additional fuel – Fill the tanks with remaining capacity on the tanker. –Begin filling in FY 09, complete depending on available budget

Wind Energy on Ross Island Purpose: –Decrease Fossil Fuel Req’t for Ross Island via Renewable Wind energy Intent –AntNZ to capitalize Wind Energy production and provide electrical power to USAP-McMurdo Station as part of logistics resource sharing Scope: Stage 1 –Establish a Proof-of-concept three turbine wind farm (1 MW) on Crater Hill, Ross Island Benefits –10% Estimated reduction in fuel for power generation (122,300 gallons/yr) –NZ contribution to joint resource pool –Demonstrates Environmental commitment and stewardship

Workshop: April 2007 –Key Recommendations 1.Science : project out year req’ts; ID resources available; plan within constraints 2.IT & Comms: Increase services remotely; optimize services; re-evaluate system architecture and assess redundancy in systems 3.Operations: Extend summer operations; transfer equipment maintenance to McM, where possible; move job-specific training to McM or CHC 4.Logistics: Update on-site inventory needs; utilize JIT re-supply; insure that what goes to Pole must go; utilize traverse to accelerate retrograde 5.Environment, Safety, Health: reduce solid and haz waste before sending material to Pole; adopt consistent safety policies; enhance emergency response Follow On Strategy Establish a Strategic Management Plan for: –Pro-active vs reactive management of station processes –Controlling outcomes through risk management and contingency planning –Detailed planning and utilization of constrained resources South Pole: Optimization of Operations

South Pole: Mitigating Constraints for Science and Operations Power – Fixed generating capacity Reduce demand - duty cycle equipment, improve energy efficiency factor, conservation, implement renewable energy strategies. Apply energy codes & standards to facilities, vehicles, science equipment and instrumentation. Establish energy budgets. Bandwidth – Cost and infrastructure limitations Refresh earth station (SPTR2) Examine new satellite applications Population – Fixed life support systems (water, fuel, facilities) Implement stand-alone concepts for surge capability Control and cycle projects to reduce concurrent demand levels Increase functions performed off station

Restore Deep Field LC-130 Operations Motivation for convening the Workshop Completion of the new South Pole Station, and use of the South Pole Surface Traverse to assist in the re-supply, will provide the opportunity to re-allocate LC-130 capability to deep field science support Recognition of need to restore the expertise to operate LC-130’s safely and effectively in support of remote field sites Results: –Committee of Antarctic glaciologists with expertise in remote sensing of snow to advise 109 th AW –Timeline established to align grant awards with logistics planning –More efficient allocation of resources –Not every site is the same; combined science advice,remote sensing imagery, site history, and pilot expertise will provide information needed to better assess risk. –Improved capabilities will increase access to Antarctica by LC-130s –Ability to task LC-130s without long lead time. Possibly for immediate use in benign areas –Joint funding with Antarctic Sciences to create a GIS database for Antarctic Field, landing, and science field reports –Process began for season and is already starting for season

Heavy Traverse Activities  October (early) – Deliver and assemble production traverse fleet  November (early) – Depart McMurdo performing trail maintenance along established route to South Pole  November (late) – Cache 12k lb and 2k gal of fuel at 84.3° South, and prepare Twin Otter landing site for POLENET project  December (late) – Complete trail maintenance, arrive at South Pole and deliver modest load of fuel and/or cargo  January (mid) – Pick-up and remove of POLENET cache remains

Antarctic Research and Supply Vessel (ARSV) ARSV Science Advisory Committee: conducted a detailed review/revision of Technical Performance Specifications (Fall 2006) End of Current Contract: January 16th, 2008 Contract Extended: 16 July, 2010 Bidders Conference: 6 Potential Bidders, many questions, revised timeline according to concerns of bidders if a new build was to be seriously considered (October 18, 2007). Current Timeline: Draft RFP to NSF for review Release RFP to bidders Bidder's conference 2-12 to Final bids due RPSC recommendation to NSF Negotiate & award contract

Palmer Station-Replace Existing Pier Why? 1960’s era - past its design life, and damaged from tidal forces, ice scouring, and erosion in the marine environment Design new pier ~150’ long to accommodate larger ships that now service Palmer Course of Action Have developed a design concept Currently verifying requirements Environmental Documentation Planned Completion Ship Ex. Pier Concept Pier Palmer Station

Antarctic Support Contract Current Contract with Raytheon Polar Services expires on March 31, 2010 Have identified task requirements Expected value - $1.3 – $1.5B Issues: –Contract type: fixed price; cost plus; some combination –Number of contracts: Omnibus contract; multiple contracts; Management contract Contract Award –1 Oct 2009