GEOSS ADC Architecture Workshop Workflow Session Pier Giorgio Marchetti European Space Agency

Slides:



Advertisements
Similar presentations
GEOSS AIP2 Disaster Management Scenario Services and Components Stu Frye Didier Giacobbo Ron Lowther 25 September 2008.
Advertisements

GEOSS AIP2 Disaster Management Scenario Spot Image contribution Didier Giacobbo 25 September 2008.
GEOSS ADC Architecture Workshop Break-out summaries: Initial Operating Capability (IOC) Doug Nebert U.S. Geological Survey February 5,
GEO AIP-2 Interim Design Review Test Facility Working Group Mauro Semerano (ElsagDatamat spa) ESA December 2008.
GEOSS ADC Architecture Workshop Clearinghouse, Catalogues, Registries Doug Nebert U.S. Geological Survey February 5, 2008.
Agenda Session (75 minutes duration, Friday sessions are 90 minutes) Co-lead introduces the session (5 minutes) –repeat of one chart from opening plenary.
High level summary and recommendations from AIP-3 George Percivall Open Geospatial Consortium Task lead AR-09-01B ADC-16, May 2011.
GEO AIP-2 Kickoff Workflow. Service Orchestration - Sensor Access Services Example workflows: –Multi-mission programming –Fine dust forecast maps –Flood.
GEO AIP-2 Kickoff Catalogue. Service Orchestration - Catalogues Catalogue Clients –For "dataset collections", "datasets", "services". –Supporting various.
HMA CDR, 5-6 September 2006, Frascati Slide 1 HMA Catalogue Update Presented By Paul Kopp On behalf of Jolyon Martin, ESA Summarising many presentations.
CEOS WGISS & Subgroup Meeting Beijing, September, CEOS WGISS Technology & Services Subgroup Overview Wyn Cudlip British National Space Centre/QinetiQ.
1 GEOSS Architecture Implementation Pilot (AIP) Phase 2 Air Quality and Health Working Group Stefan Falke, Rudy Husar, Frank Lindsay, David McCabe, Erin.
EuroGEOSS Implementing the GEOSS Data Sharing Action Plan: Drought.
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
ESA UNCLASSIFIED – For Official Use Data Stewardship Interest Group Session LTDP Activities & DSIG Introduction WGISS-37 Meeting Cocoa Beach (Florida-US)
Initial Operating Capability Discussion chaired by Jay Pearlman, IEEE including contributions from D. Nebert ADC Co-Chair Meeting February 5, 2008.
EuroGEOSS Implementing the GEOSS Data Sharing Action Plan: Forestry.
OGC Liaison Report WGISS-20 Allan Doyle, EOGEO
A Global Agriculture Drought Monitoring and Forecasting System (GADMFS) Meixia Deng and Liping Di.
ADC Meeting ICEO Standards Working Group Steven F. Browdy, Co-Chair ADC Workshop Washington, D.C. September, 2007.
U.S. Department of the Interior U.S. Geological Survey Web Services Interest Group WGISS #28 September, 2009 Pretoria, South Africa Lyndon R. Oleson U.S.
WP 9 (former Task 1b of WP 1): Data infrastructure Robert Huber UNI-HB Esonet 2nd all regions workshop, Paris
Global Data Flows Study SDCG-8, Session 6 Frank Martin Seifert (ESA); Gene Fosnight (USGS) 24 Sep 2015, Bonn.
Jürgen Walther Office of the Interministerial Committee for Geo Information (IMAGI) Coordination Office GDI-DE Federal Agency for Cartography and Geodesy.
Achieving Interoperability using the ArcGIS Platform
Tools in Support of a National DMAC Derrick Snowden NERACOOS/ODP Annual Meeting 26 Sep 2012.
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 14 & 15 May 2007.
EUM/SIR/VWG/11/012 WP 2000: Climate SBA 9 October 2011 WP 2000: Climate Societal Benefit Area Robert Husband (EUMETSAT)
GEOSS Clearinghouse GEO Web Portal GEOSS Common Infrastructure Components & Services Standards and Interoperability Best Practices Wiki User Requirements.
Page 1 Pier Giorgio Marchetti Models for scientific exploitation of EO data: Innovation, harmonization, technology Introduction.
1 Using the GEOSS Common Infrastructure in the Air Quality & Health SBA: Wildfire & Smoke Assessment Prepared by the GEOSS AIP-2 Air Quality & Health Working.
Open Geospatial Consortium Overview and why we are adopting the standards.
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 28 February & 1 March 2007.
1 ISO WAF Community Catalog Product Access Servers Registry Clearinghouse(s) GEO Portals Community Portals Users Client Apps GetCapabilities ISO
ORNL DAAC SPATIAL DATA ACCESS TOOL Open Geospatial Consortium (OGC) Services Bruce E. Wilson Suresh K. Santhana Vannan Yaxing Wei Tammy W. Beaty National.
1 Using the GEOSS Common Infrastructure in the Air Quality & Health SBA: Wildfire & Smoke Assessment Prepared by the GEOSS AIP-2 Air Quality & Health Working.
CGI – GeoSciML Testbed 3 Status for BRGM Jean-Jacques Serrano.
CEOS OpenSearch Project Yoshiyuki Kudo (JAXA) WGISS-37.
® ® Data flow from space to earth: The role of OGC Web Service (OWS) standards in EO market growth Steven Ramage Open Geospatial Consortium (OGC) 22 nd.
HMA Sep 2009 – Slide 1 Daniele Marchionni Elsag Datamat HMA Follow On – Task 4 - Workplan.
Page 1Overview of the HMA Project, 8 March 2010 Overview of the HMA Project OGC TC Opening Plenary Pier Giorgio Marchetti European Space Agency.
Pier Giorgio Marchetti EOP-GSR ESA UNCLASSIFIED – For Official Use Workshop Linked Open Data & OpenSearch – motivation The HMA Architecture Working.
GEOSS Architecture Implementation Pilot AIP-3 Engineering Use Cases Nadine Alameh & Josh Lieberman AIP-3 kickoff Frascati, Italy March
Page /06/2014HMA-S Final Presentation - 11/06/2014 HMA for Science Executive Summary Y. Coene, Spacebel s.a. C. Gizzi, Airbus Defence and Space Final.
HMA-T Phase 2 KO, 2-3 July 2008 Slide 1 HMA-Testbed Phase 2 Negotiation and KO Meeting 2-3 July 2008, Frascati Yves Coene, SPACEBEL.
HMA AWG, 6 November 2013 Slide 1 HMA for Science - Status HMA AWG Meeting 6 November 2013, ESRIN Frascati Yves Coene, Spacebel s.a. Claudio Gizzi, Astrium.
HMA Slide 1 Heterogeneous Missions Accessibility Follow On Pier Giorgio Marchetti - European Space Agency
OGC’s role in GEO: Results from the Architectural Implementation Pilot (AIP) George Percivall Open Geospatial Consortium GEO Task IN-05 Coordinator
FedEO KO 5 June 2007 Slide 1 FedEO Catalogue Session. …
Global Earth Observation System of Systems (GEOSS) Architecture Implementation Pilot (AIP) Air Quality and Health Working Group Stefan Falke, Rudy Husar,
ESA-FAO GEOPortal STATUS & PLANS
HMA AWG Configuration Management Status 1 December 2008
Workplan for Updating the As-built Architecture of the 2007 GEOSS Architecture Implementation Pilot Session 7B, 6 June 2007 GEOSS Architecture Implementation.
WGISS Connected Data Assets
GEO-DARMA Ivan Petiteville, ESA GEO-DARMA Workshop Cancun, 25 May 2017
HMA Follow On Task 1 Standards evolutions
SMAAD Project Semantic Annotation and Mediation
Sensor Services & Processing Services
Overview of Progress HMA Standardisation Work
Eoin Howlett ASA, MARACOOS
Standardisation Status Update
Pier Giorgio Marchetti, Philippe Mougnaud European Space Agency
HMA Follow-on Kickoff Meeting
Pier Giorgio Marchetti - European Space Agency
HMA-Testbed Project Call
4/5 May 2009 The Palazzo dei Congressi di Stresa Stresa, Italy
HMA for Science Task 1 – Project Management
Pier Giorgio Marchetti - European Space Agency
Web Service Security support in the SSE Toolbox
OGC Happenings: OGC19-020: Testbed-15 Service Discovery
Presentation transcript:

GEOSS ADC Architecture Workshop Workflow Session Pier Giorgio Marchetti European Space Agency

Workflow Session Draft Agenda –Scenario outline (with links to Disaster Management, Sensor Planning Services and Processing) - all –Overview of available tools and identified issues - Y. Coene Spacebel, R. Lucchi JRC –Discussion and Planning - all –AOB –Adjourn

Workflow Session Requirements over Scenarios: –End-to-end scenarios should include Data requirements: –archived data –to be acquired »systematic »tasked –From satellite (Optical, Radar, Meteorological,…) –In-situ –Geospatial and other (demographic, protected areas, etc…) User Requirements on –data access (which data sources, update frequency, quality,…) –results and information exploitation (output formats, presentation requirements,…) Interaction Diagrams indicating actors, endpoints, operations to be supported by the Workflow

Workflow Session Issues: –how to avoid data source duplication when global, regional or local authorities may be harvesting the same source. –Latency: how to ensure that end-to-end scenarios can cope with delays, … –Compensation for faults and unexpected events i.e. alternative flows –Persistence: i.e. storage of processed data and association of relevant metadata (e.g. by using WFS)

Workflow Session: Tools –Please list and detail proposed/available tools e.g.: From FEDEO in 2007 Persistent Testbed available at including –workflow engine –clients for: »ISO and EO Ebrim extension package catalogues, »CSW ISO Profile »Sensor Planning Service EO Profile »Sensor Observation Service »EO order profile »WMS and simple feature WCS, WFS Open Source Skeleton sw to simulate and build servers Dedicated forum to be set up for planned activities