Athens, GreeceApril 08-13, 2005 1 Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)

Slides:



Advertisements
Similar presentations
CEOS WGISS & Subgroup Meeting, Budapest, May CCSDS Liaison Consultative Committee on Space Data Systems Wyn Cudlip BNSC/QinetiQ
Advertisements

Wyn Cudlip BNSC/QinetiQ Presentation to WGISS24 DLR, October 2007 CCSDS Liaison Consultative Committee on Space Data Systems.
November SLS RFM and RNG REPORT 18 November 2004.
1 October 2009 Cross Support Transfer Services (CSTS) Future Services as of Spring 2014.
PS 1 16 June 2006 SEA CESG SUMMARY Rome, Italy, 16 June 2006.
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
1 11 April 2005 The CESG-CMC Work Planning Process Adrian J. Hooke Chairman, CCSDS Engineering Steering Group 09 April 2005 Joint Meeting of the CESG and.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Institutsbezeichnung: Quellenangabe 1 CCSDS MANAGEMENT COUNCIL Canadian Space Agency St-Hubert, Quebec, Canada May 2004 DLR Report Martin Pilgram,
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.
ESA Report to CMC ESA / ESTEC, 5th November 2009 Mario Merri (deputising JFK / NPESA CCSDS Delegate)
Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code.
Patent Policy Update CMC Mid-Term Telecon 6 April
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
ESA Report Jean-François Kaufeler 12 th April 2005 Athens.
Information Architecture WG: Report of the Winter 2007 Meeting January 20, 2007 Dan Crichton, Chair NASA/JPL.
Ajh January 2007 CCSDS “Books” Adrian J. Hooke CMC Meeting, Colorado Springs 26 January 2007.
Colorado SpringsJanuary 23~26, Winter-Spring 07 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
Cesg-1 CSS Area Report -- Super BOF Background From A. Hooke to CESG: (CSS AD emphasis ) Date: Fri 02 Oct 2009 To: CESG cc: CMC Subject: Proposed.
CCSDS Meeting CNES Report, 2/11/2004 CNES 1 CCSDS - MOIMS Area Data Archive ingestion WG Information Packaging and Registry WG CNES Report on activity.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
SLS-RFM WG deadlock over NASA’s position –Rec has a number of critical flaws including a logical dependence upon an SFCG recommendation.
10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.
May 2004 CCSDS Navigation WG Activity Report CCSDS Spring Series May 2004 CSA, Montreal, Canada Felipe Flores-Amaya CCSDS Navigation WG.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
1 19 September 2005 Space Link Services Area report to CMC Reston, Virginia, USA, 26 September 2005.
CSA St Hubert, Quebec24-25 May Spring 2004 CCSDS Management Council CNES report Geneviève Campan (CNES)
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
CCSDS Engineering Steering Group: Report to the CCSDS Management Council CMC Meeting May 2004 CSA, Montreal, Canada Adrian J. Hooke Chairman, CESG.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL.
SEA-1 20 Nov 2014 CCSDS System Engineering Area (SEA): System Architecture WG (SAWG) Restart Peter Shames, SEA AD 20 Nov 2014.
Dokumentname > Folie 1 > Vortrag > Autor DLR - CMC Report Martin Pilgram, DLR-GSOC, October 2005, Washington.
Navigation WG Report D. Berry NASA J. Fertig ESA.
May MOIMS PLENARY –Be careful when connecting your laptop in the meeting rooms Responsibility of WG Chair Cost to be covered by WG chair Cost not.
08 April 2005 Athens, Greece AD-NP - 1 MOIMS AREA: STATUS REPORT, Start of Spring 2005 Meeting N. Peccia ESA R. Thompson BNSC Area Directors Joint CESG/CMC.
CCSDS Reference Architecture Notes from SAWG discussion & from SEA Report to CESG/CMC 12 & 17 Nov 2014.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
Data Archive Ingest WG Report to MOIMS Plenary May 14, 2004.
MOIMS MO & Nav Functions, Services & Interfaces CCSDS Ref Arch Discussion 20 Oct 2015.
The Consultative Committee for Space Data Systems 1 JAXA CCSDS Status April 12 – 13, 2005 Kaneaki Narita Consolidated Space Tracking and Data Acquisition.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
Panel P1J: Navigation Data April 2002 CCSDS P1J Status Report Spring Meeting, ESA/ESOC, Darmstadt, Germany Dates: April 8 – 11, 2002 Felipe Flores-Amaya.
1 19 September 2005 Space Link Services Area report to CESG Atlanta, Georgia, USA, 19 September 2005.
1 Steve Hughes Daniel J. Crichton NASA/JPL January 16, 2007 CCSDS Information Architecture Working.
CEOS WGISS Meeting, Hanoi May CCSDS Liaison Consultative Committee on Space Data Systems Wyn Cudlip BNSC/QinetiQ Presentation.
The Consultative Committee for Space Data Systems JAXA CCSDS Status to CMC/8Dec04/K.Narita Page 1 JAXA Agency Report to CMC and ISO/SC13 Kaneaki Narita.
June MOIMS AREA PLENARY NAVIGATION WG REPORT June 2006 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
CMC meeting, 23 October, 2008 Page 1 JAXA CCSDS Status October, 2008 CMC Meeting DIN, Berlin, Germany Kaneaki Narita JAXA CCSDS Secretary Office.
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
CMC meeting, Nov., 2009 Page 1 JAXA CCSDS Status November, 2009 ESA/ESTEC Noordwijk, Netherlands Kaneaki Narita JAXA CCSDS Secretary Office.
Information Architecture WG: Report of the Fall 2004 Meeting November 16th, 2004 Dan Crichton, NASA/JPL.
ESA Status Report Jean-François Kaufeler Montreal, 24 May 2004.
ESA UNCLASSIFIED – For Official Use Cleveland, OH, USA 04-08Apr16 Mario Merri, ESA/ESOC Brigitte Behal, CNES MOIMS Opening Plenary.
19-May-2015-cesg-1 CESG Spring 2015: Project Schedule & Resources.
Colorado Springs, CO, USA, 24 April 2009 Deputy – David Giaretta
CCSDS Navigation Working Group
CCSDS System Engineering
JAXA CCSDS Secretary Office
CCSDS Liaison Consultative Committee on Space Data Systems
Presentation transcript:

Athens, GreeceApril 08-13, Spring 2005 CCSDS Management Council CNES report Jean-Marc SOULA (CNES)

Athens, GreeceApril 08-13, No change in CNES organization. Resource allocation between CCSDS and ECSS : CNES contributed to the discussions initiated between agencies and ECSS. Proposal formulated and to be presented to ECSS Executive and CMC… Some internal actions conducted to clarify applicability of Norms (CCSDS, ECSS, ISO) to CNES projects. France position on a Space TC in ISO (under BNAE responsibility) was made and is: –No for a Space TC separated from TC-20 –Yes for an optimization of SC13-SC14 organization within TC CNES general information

Athens, GreeceApril 08-13, Potential involved –CNES manpower involved in the last 6 months was around 3.5 EFT men effort –Present participation covers all areas except Spacecraft On Board Interfaces Services (SOIS) –This should be maintained for the next coming months Likely with same distribution (question on SEA IA and SIS) depending on operating plan presented by CESG and AD’s 2. CNES Resources on CCSDS

Athens, GreeceApril 08-13, Spacecraft –All CNES satellites under development are CCSDS compliant (at least partially) –Just launched : Parasol and Essaim (Myriades, Dec 05) –Summary of future satellites Proteus family : Calipso (2005), Corot, Smos, Jason-2 Myriades family : Microscope, Picard Dual satellites : Pleïades –New project : ArgoµSat (Myriades phase A) 3. Implementations (1/2)

Athens, GreeceApril 08-13, Operations Remote Management System (qualification tests in progress) Ground Stations Project on a global harmonization of CNES ground segments, from multi- mission thru product lines for a progressive implementation in the longer term (2007–2010). Implementation of RF&M, OPM, Packet TM/TC, etc… in progress SLE gateway on Provider side for SLE transfer services with CNES multi-mission facilities (end 2004). SLE transfer services on the User side for Pleiades project (development initiated : end 2005). SLE transfer services at ground stations level under study for a later phase (2006). SLE Service Mngt anticipated as an external interface. 3. Implementations (2/2)

Athens, GreeceApril 08-13, What is the status of Procedures Manual and Operating Plan ? Which approved versions apply ? Up-to-date versions are required before any change in organization or working method. Agency reviews –Some agency reviews in Q relate to F03 & S04 meetings; Reasons for such delays must be clarified –Poll Alerts messages should refer to CMC resolution number. –Could CESG verify beforehand if documents are ready for Agency Review ? –Could we have a resolution that some Reviews are by-passed when only minor changes are involved (editorial)? 4. Identified issues (1/5)

Athens, GreeceApril 08-13, What is the rule for new / revised charters ? Changes in the Operating Plan only or other methods ? SANA BOF in Operating plan CSS Generic Services via poll NAV via poll (not announced in Toulouse F04 meeting) Which processes for resource allocation in each case ? How comments received during reviews are to be passed to CESG and WG’s should be addressed in the procedures. Shall we change the order of the meetings from WG->CESG->CMC to CESG->CMC->WG? How long will polls take if CESG resolutions and actions are submitted when CMC meeting is over ? How to improve the CMC efficiency in between the meetings? 4. Identified issues (2/5)

Athens, GreeceApril 08-13, SEA/IA position CNES supports the IOAG idea that priority should be given to Service Architecture CNES considers that the Work Packages of the Information Architecture WG could be distributed: –WP1 (language/model from Information point of view): to SEA/SA –WP2 (generic management and access to information): to MOIMS in order to avoid discrepancies with OAIS –WP3 (best current practice): very low priority MOIMS/NAV A 2-year extension of the NAV WG appears in the New Charter This is related to a request from ISO/SC-14 to analyze the exchanges of vectors and errors for collision avoidance Shouldn’t this be discussed first at CESG and CMC levels ? 4. Identified issues (3/5)

Athens, GreeceApril 08-13, SLS/RFM CNES asks that agencies determine if they agree to support the SFCG Draft recommendation 14-3R6 If all agencies say « Yes », then the extension of the WG has a meaning and CNES will change his vote. SLS / RFM and Coding Those WG should have joint meetings and discussions The bandwidth / power / enveloppe efficiency cannot be treated independently. 4. Identified issues (4/5)

Athens, GreeceApril 08-13, CSS/Generic Services The WG takes into account Unframed TLM but not the CMD counterpart. The WG considers exchanges of TRK data while IOAG has indicated a low priority requirement on this activity. The CMC should discuss those aspects of the WG Charter. XML CNES identifies a need for an harmonized approach across the WG ’ s (MOIMS-NAV, CSS-SM, etc … ) SIS Only very long term objectives in the Strategic Plan and no short term action in the Operating plan. 4. Identified issues (5/5)