ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.

Similar presentations


Presentation on theme: "ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary."— Presentation transcript:

1 ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary

2 SM&C WG Plenary | 23-27Mar15| ESA | Slide 2 ESA UNCLASSIFIED – For Official Use Progress to Date: Charter Goal 1 “to pave the way for the technical work that will be performed in the context of spacecraft monitoring and control. This will be done by defining the technology- independent framework to be used in future work. It is noted that this activity involves also the space segment and therefore requires close coordination with the SOIS. This will be done by initially producing a white book and to bring it to Green status” MO Message Service Concept (GB, ESA) Issue 1 (May05), 2 (Aug06) and 3 (Dec10) published. DONE However, the book is not yet a good introduction to new comers  Work on-going with Michele

3 SM&C WG Plenary | 23-27Mar15| ESA | Slide 3 ESA UNCLASSIFIED – For Official Use Progress to Date: Charter Goal 1 (1) “to specify and produce the corresponding Blue/Magenta Books for the following initial set of services” MO SERVICES FRAMEWORK MO Reference Model (MB, ESA) Issue 1 (Jul10) published. DONE MO Message Abstraction Layer (MAL) (BB, ESA) BB Issue 1 (Oct10) and 2 (Mar13) published. DONE YB (ESA/CNES) Issue 1 (Oct10) and 2 (Mar13) published. DONE Common Object Model (COM) (BB, ESA) Issue 1 (Mar14) published. DONE YB (ESA/CNES) Issue 1 (Mar14) published. DONE The MO Services Framework is complete!

4 SM&C WG Plenary | 23-27Mar15| ESA | Slide 4 ESA UNCLASSIFIED – For Official Use Progress to Date: Charter Goal 1 (2) INITIAL SET OF MO SERVICES MO M&C Service (BB, ESA) 3 rd Agency Review on-going. Latest draft distributed on 16Mar15. 20 RIDs still outstanding. To be finalised during the workshop YB (ESA/DLR): ESA is ready to start with prototype. DLR is tendering the prototype production with a foreseen start beginning/mid of April MO Common Services (BB, ESA) Draft distributed on 31Oct14, but priority given to M&C Services. Configuration service more complex than anticipated. To be discussed during the workshop YB (ESA/CNES): To be started as soon as book is stable Mission Planning Services (BB, ESA/UKSA) BOF created (will meet for the second time) Request to form WG has been submitted

5 SM&C WG Plenary | 23-27Mar15| ESA | Slide 5 ESA UNCLASSIFIED – For Official Use Progress to Date: Charter Goal 1 (3) LANGUAGE BINDINGS MO Java Language API (MB, CNES) Issue 1 (Apr13) published. DONE MO C++ Language API (MB, NASA) Awaiting for schedule from NASA Synergies expected with CNES who are using C++ for ISIS Prototype not needed

6 SM&C WG Plenary | 23-27Mar15| ESA | Slide 6 ESA UNCLASSIFIED – For Official Use Progress to Date: Charter Goal 1 (4) TECHNOLOGY (TRANSPORT/ENCODING) BINDINGS MO Space Packet Protocol Binding (BB, CNES) Submitted for publication on 27Jan15 Currently, solving CESG comments: no showstopper identified YB (CNES/DLR) submitted and prototype testing completed ZeroMQ Binding (BB, CNES) Ground-Ground binding to be started second half 2015 YB (CNES/?) A partner for the prototype is sought TCP-IP Binding (BB, ESA) HTTP Binding (BB, ESA) XML Encoding (BB, ESA) Ground-Ground bindings/encoding started on ESA’s initiative YB (ESA/?) Partners for the prototypes are sought

7 SM&C WG Plenary | 23-27Mar15| ESA | Slide 7 ESA UNCLASSIFIED – For Official Use Progress to Date: Charter Goal 3 (1) “to update the XTCE standard with the result of the public review together with the OMG” XTCE (BB, NASA) XTCE 1.1 published in Nov07. DONE XTCE 1.2: Waiting for approval by the OMG Architecture Board hopefully in Mar15. After that it will be submitted for Yes/No review with CCSDS. The CCSDS review can raise comments that will be collected for the next revision Prototype not needed “To update the XTCE Green Book from presentation format to actual book” XTCE (GB, ESA) Issue 1 published in Jul06. DONE XTCE Element Description (GB, NASA) Issue 1 published in May13. DONE

8 SM&C WG Plenary | 23-27Mar15| ESA | Slide 8 ESA UNCLASSIFIED – For Official Use Progress to Date: Charter Goal 3 (2) “To produce the XTCE Magenta Book as recommended practice on how to tailor XTCE for a CCSDS-enabled mission” NASA Tailoring Guide (GovSat): submitted to OMG. Once approved, shall be available from OMG website and from CCSDS/SANA ESA Tailoring Guide: it is being worked as part of the EGS-CC project. It might be made available from CCSDS/SANA once available

9 SM&C WG Plenary | 23-27Mar15| ESA | Slide 9 ESA UNCLASSIFIED – For Official Use Progress to Date: Charter Goal 4 “To specify the other high level services identified in the Green Book” ON-HOLD, … but  IOAG/MOSSG priorities provided + discussion during the workshop  Several relevant activities on-going. Some from ESA side:  OPS-SAT S/G based on MO Services: Phase B2/C/D/E1 ITT on-going  MO Services over SOIS (TRP study): completed  MO Services over SAVOIR (TRP study): on-going  MO Services XML Editors (Czech Incentive Schema study): completed  Mission Planning Services (Estonia Incentive Schema study): on-going  Navigation Services (Ph.D.): on-going with U. of Würzburg  Data Distribution Services (Polish Incentive Schema study): on-going  An On-board Software Development Framework for NanoSats based on CCSDS Mission Operations Services with Reference Implementation on ESA OPS-SAT Mission (Ph.D): on-going

10 SM&C WG Plenary | 23-27Mar15| ESA | Slide 10 ESA UNCLASSIFIED – For Official Use Status of Schedule Agreed in London OK (still) LateOK (still) OK (still) OK (still) Late

11 SM&C WG Plenary | 23-27Mar15| ESA | Slide 11 ESA UNCLASSIFIED – For Official Use SM&C WG Resource Summary

12 SM&C WG Plenary | 23-27Mar15| ESA | Slide 12 ESA UNCLASSIFIED – For Official Use Other Relevant Events  New, unsolicited Binding/Encoding from ESA  Supported MOSSG  Open Source Software  ESA has made the MO Services Graphical Editor available as OSS on GitHub (www.github.com/esa)www.github.com/esa  Contributions from other Agencies highly appreciated

13 SM&C WG Plenary | 23-27Mar15| ESA | Slide 13 ESA UNCLASSIFIED – For Official Use Workshop Agenda

14 SM&C WG Plenary | 23-27Mar15| ESA | Slide 14 ESA UNCLASSIFIED – For Official Use Proposed (chairman) Goals for this Workshop  Smooth handover of WG chairmanship to Dan and Mehran with Solid discussion with MOSSG with identification of service priorities  Finalisation of M&C Service BB  Finalisation of SPP Technology Binding BB  Conclusive technical discussion on Common Services BB  New name for Common Services BB?  Often confusion between COM and Common  Proposal: Infrastructure, Support or Utility Services

15 SM&C WG Plenary | 23-27Mar15| ESA | Slide 15 ESA UNCLASSIFIED – For Official Use Open Actions (1)

16 SM&C WG Plenary | 23-27Mar15| ESA | Slide 16 ESA UNCLASSIFIED – For Official Use Open Actions (2)

17 SM&C WG Plenary | 23-27Mar15| ESA | Slide 17 ESA UNCLASSIFIED – For Official Use Have a successful workshop!


Download ppt "ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary."

Similar presentations


Ads by Google