1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.

Slides:



Advertisements
Similar presentations
The Detector Control System – FERO related issues
Advertisements

Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
1 Responsibilities & Cost ALICE DCS Review 14 Nov 05 For the DCS Team L.Jirden.
Test Systems Software / FEE Controls Peter Chochula.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
MDT PS DCS for ATLAS Eleni Mountricha
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
TPC DCS update. CR3 UX-A/C CR4-Z08 UX-A/C CR3 CR4-Z08 UX-A/C CR4-Y08 Chambers ISEG Chambers Wiener Ethernet RCU Chambers, detector ELMB
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
DCS Plans and Pending Activities for 2013/14 Shutdown Muons in general Replacement/upgrade of DCS computers OS migration to Win-7, Win-2008 or SL6 PVSS.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
1 Cost of controls TB L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
P. Chochula ALICE Week Colmar, June 21, 2004 Status of FED developments.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
JCOP Review, March 2003 D.R.Myers, IT-CO1 JCOP Review 2003 Architecture.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
Peter Chochula ALICE Offline Week, October 04,2005 External access to the ALICE DCS archives.
PHOS APD Bias Control Goal: To develop software for the PHOS APD bias control that uses the agreed ALICE standards for detctor control and coniguration.
Controls EN-ICE FSM for dummies (…w/ all my respects) 15 th Jan 09.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
André Augustinus 21 June 2004 DCS Workshop Follow-up from last workshop.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
DETECTOR CONTROL SYSTEM FOR THE ALICE EXPERIMENT AT CERN -LHC Anik Gupta ICTDHEP JAMMU 11 th September 2013 Special Thanks to the ALICE CONTROLS COORDINATION.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
Clara Gaspar, March 2003 Hierarchical Control Demo: Partitioning, Automation and Error Recovery in the (Detector) Control System of LHC Experiments.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
CONFIGURATION OF FERO IN ALICE Peter Chochula 7 th DCS Workshop, June 16, 2003.
The ALICE Silicon Pixel Detector Control system and Online Calibration tools Ivan Amos Calì (a,b) On behalf of the SPD Project in.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
ALICE. 2 Experiment Size: 16 x 26 meters (some detectors >100m away from IP) Weight: 10,000 tons Detectors: 18 Magnets: 2 Dedicated to study of ultra.
SPD DCS Overview & FED Server
The LHCb Run Control System
TPC Detector Control System
Experiment Control System
R.TIEULENT - ALICE Offline Week
Presentation transcript:

1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén

2 TDR contents u Introduction & context u Requirements & design strategy u System architecture u System implementation u Control system components u Detector applications u Services applications u Operation u Scale u Organization u Organization, responsibilities, schedule, cost estimate

3 Software architecture sub-sys 1 device a Control Units Device Units To physical devices sub-det B detector sub-det A sub-sys 2 device b … … gas DCS ECS power sub-det Esub-det D … … … racks sub-sys 1sub-sys 2 device e …

4 Control and device units PVSS CU Behaviour (FSM) configuration archiving Partitioning Alarm handling access, ownership dB operator parent child commands states PVSS FSM interface configuration archiving Alarms device driver access, ownership dB operator parent settings readings device Partitioning OFF ERROR ON STAND BY GO_STANDBY GO_READY GO_STANDBY RESET Alarm GO_OFF CONFIG RAMP_UP RAMP_DW

5Partitioning sub-sys 1 device a Control Units Device Units To physical devices sub-det B detector sub-det A sub-sys 2 device b … … gas DCS ECS power sub-det Esub-det D … … … racks sub-sys 1sub-sys 2 device e … operator A operator B operator D operator C

6 TDR contents u Introduction & context u Requirements & design strategy u System architecture u System implementation u Control system components u Detector applications u Services applications u Operation u Scale u Organization u Organization, responsibilities, schedule, cost estimate

7 Back-end and front-end components Field-bus Front-end application DEVICE DRIVERS DEV 1DEV 2 COMMUNIC DCS Front-end DB access ALARM PVSS CONFIG ARCHIV WEB ARCHIV COMMUNIC FSM DCS Back-end DCS network CONDIT PVSS CONFIG FEE CONFIG User application Process layer Field layer Supervisory layer

8 PVSS architecture User Interface Processing Communication and Memory Layer Driver UIM CtrlAPI EVM DBM D D D DB UIM

9 Distributed PVSS system UIM CtrlAPI EVM DBM DB UIM DCS Dist … … UIM CtrlAPI EVM DBM D D D DB UIM … SSD UIM CtrlAPI EVM DBM D D D DB UIM TPC UIM CtrlAPI EVM DBM D D D DB UIM … TRD operator DEVICE

10 TDR contents u Introduction & context u Requirements & design strategy u System architecture u System implementation u Control system components u Detector applications u Services applications u Operation u Scale u Organization u Organization, responsibilities, schedule, cost estimate

11 DCS Sub-detectors FC TOF SPDSDDSSD TPCTRDZDCPMDHMP RO ITSPHO CPVCAL FMDV0T0 TRATRI MUCOSEMC Common solutions ~10 Common ~10 Specific

12 PVSS CU Behaviour (FSM) configuration archiving Partitioning Alarm handling access, ownership dB operator PVSS FSM interface configuration archiving Alarms device driver access, ownership dB operator device Partitioning Agreed set of standard devices Standard interfaces – OPC, DIM Common tools OFF ERROR ON STAND BY GO_STANDBY GO_READY GO_STANDBY RESET Alarm GO_OFF CONFIG RAMP_UP RAMP_DW Standard FSM’s What is a common solution?

13 Common solution for FEE ALICE CONTROL ROOM PVSS console Common interface? 18 different FEE architectures ON DETECTOR VME SPD FEE JTAG HMPID FEE DDL TPC FEE ETHERNET TRD FEE EASYNET … MXI … Front End Device (FED) DIM server interfaces FEE H/W MXI DDL EASYNET ETHERNET Etc. FEE specific FEE common DIM client

14 Architecture of SPD FEE Control (PVSS) DIM Client CA1 CA2MA1MA2 Pixel Multi Chip Module Router VISA PCI-MXI-VME Database DIM server Data, flags Multithread applications Control Agent reacts to commands received by server Monitoring Agent publishes data as DIM services Control and Monitoring Server Client Software JTAG Commands

15 TDR contents u Introduction & context u Requirements & design strategy u System architecture u System implementation u Control system components u Detector applications u Services applications u Operation u Scale u Organization u Organization, responsibilities, schedule, cost estimate

16 Pre-installation on surface Final installation in UX Commissioning phase Schedule HW infrastructure Back-end + services Detector sub-systems Integration with DAQ/TRG HW infrastructure Back-end + services Detector sub-systems Integration with DAQ/TRG/HLT Individual detectors Groups of detectors Whole experiment

17 The ACC team wishes you a … …Merry Christmas !! Prettige Kerstdagen! Vrolijk Kerstfeest! Craciun Fericit! God Jul! Veselé Vianoce! Buon Natale!