MICE CMPB Alain Blondel 13 November 2006 1 MICE status & news 1. Collaboration life Common fund Highlights of CM16 2. funding requests: status 3. outstanding.

Slides:



Advertisements
Similar presentations
MICE CMPB Alain Blondel 12 January MICE status & news 1. Collaboration life Common fund Highlights since CM16: target test, ICST visit 2. funding.
Advertisements

Request & in-kind supportEarmarkedFurther requests UK 13 M Protons, Hall, Tracker 10 M£ Yes 3M£ US 23 M$ RF Amplifiers ($500k) + R&D 0.3+(1.2 negot.)M$
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
MUTAC Fermilab Alain Blondel 16 March Status of MICE MUTAC March 2006 at FERMILAB.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
K. Long, 26 June, 2015 Phase II: introduction to discussion Background (reminder) Responses Assumptions Presently planned bids Input to summary table Summary.
MICE CM15 Alain Blondel 8 June MICE CM 15 Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. today: -- reviews and.
MICE CMPB 3-Feb-2006 Alain Blondel 1 Status of MICE.
UK Funding PPRP Meeting on Monday 30 th June Accepted need for urgent work this year –no discussion on this –but also no indication of the level of funds.
MICE CMPB Alain Blondel 2 March spokesperson remarks CMPB 1. funding issues 2.planning the near future what slips and what does not risk areas 3.
DPNC Sept 2007Jean-Sébastien Graulich MICE The international Muon Ionization Cooling Experiment o o Introduction o o Beam Line o o Cooling Channel o o.
MANX meeting 15 July 2008 Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment MICE in 2011.
CMPB Alain Blondel 14 April STATUS OF MICE.
Alain Blondel MICE Funding Agency Committee MICE status report Most of the technical progress has been covered in the open session except the.
MICE CM39 Alain Blondel CB report 1 Report from the MICE collaboration board.
MICE Wrap-up Michael S. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting—RAL October 11, 2006.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
MICE CMPB Alain Blondel 19 April spokesperson remarks CMPB MICE NEWS.
MICE CM15 wrap-up Alain Blondel 11 June MICE News Collaboration meeting 8-11 June 2006 at Fermilab complete review of the project. for those who.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
MICE collaboration meeting Alain Blondel 27 – Welcome to the 10th MICE collaboration meeting. 1.Global neutrino factory situation 2.Possible.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Alain Blondel – introduction MICE CM Collaboration meeting June 2007 at RAL Complete review of the project Organization of efforts towards.
Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE/UKNF Oversight Committee.
MICE collaboration meeting Alain Blondel october MICE collaboration meeting 13 at RAL News The international context Goals of the meeting.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
Takashi Matsushita Imperial College T. Matsushita 1 MICE Status Excerpt from talks at MuTAC review:
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
Alain Blondel MICE collaboration meeting CM25 RAL November   MICE The International Muon Ionization Cooling Experiment.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
MICE CM16 Goals Alain Blondel 8 October MICE CM 16 Collaboration meeting 8-11 October 2006 at RAL Goals of the meeting thanks to John Cobb & Marco.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
Report from MICE project teams Feedback from PPRP MICE funding: various scenarios Issues  Financial year 2003/04  iMICE common fund.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
MICE VC116 Alain Blondel 18 December MICE NEWS See more details in Macolm’s MICE news!
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
29 September 2006M.Sakuda NuFact06 Asian Regional Outlook (Japan) -by Y.Kuno (Osaka) (1) SuperBeam (T2K) (2) J-PARC current upgrade plan (3) T2HK or T2KK.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
MICE Funding Update (U.S.) Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory CMPB Meeting August 1, 2007.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
PId (ToF, CKoVI, EMCAL) V. Palladino et al MICEVC Frascati & Fermilab test beams in July Analysis in progress: MICE PID PhConf 4, 31 Aug aiming.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Collaboration Board Summary MICE CM 25 November 7, 2009.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
MICE CM23 Introduction and Meeting Goals Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
CHIPP Oct 2007Jean-Sébastien Graulich Status of MICE Jean-Sebastien Graulich, Univ. Genève o o Introduction o o Beam Line o o Technical Design o o PID.
CARE08 Dec 2008Jean-Sebastien GraulichSlide 1 MICE, a facility for precision beams and muon cooling o MICE in EuCARD o MICE Facility: Beam, Infrastructure.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
1 How the Muon Ionization Cooling Experiment Found a Home MICE hall at RAL in Spring
Alain Blondel 4 April  Aspirational MICE Schedule as of April 2008 Febuary-July 2008 STEP I September 2008 November 2008 to summer 2009 STEP II.
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
Collaboration Board RAL, 30 October 2015 Paul Soler, Stefania Ricciardi MICE Common Fund Status.
DOE Mini-Review Summary and Management Updates Mark Palmer Fermilab March 15, 2013.
Comments on the February DOE Review
Report on EUCARD WP6: MICE Transnational Access (TA)
Presentation transcript:

MICE CMPB Alain Blondel 13 November MICE status & news 1. Collaboration life Common fund Highlights of CM16 2. funding requests: status 3. outstanding problem: TOF

MICE CMPB Alain Blondel 13 November Collaboration life -- MICE CM 16 at RAL had record attendance (66 registered) -- Changeovers.. VC conference planner (K. Long --> JS Graulich).. Analysis forum convener (Y. Torun --> J. Cobb) -- Plans for upcoming MICE meetings — February 22-25, 2007 at CERN (IDS and FAC meetings just prior) — June ~ at RAL — October at RAL — generally plan two meetings per year at RAL, one elsewhere -- Got favorable comments from Marx HEPAP subpanel “We support the MICE project as a critical feasibility demonstration for muon storage rings and colliders.” “...we are concerned that the support for muon cooling is below what is needed to sustain momentum in this program.”

MICE CMPB Alain Blondel 13 November Mice common fund proposal was approved at the collaboration board.. £3000 per Ph. D holder considered a maximum.. first installement due October 1, MICE CB chair/secretary will establish the number of contributors per institute before end 2006 this is likely to represent a contribution of order k£ per year.. MICE PM to set up account and to establish invoices to institute leaders The ISIS beam delivery is acknowledged to be a welcome contribution of the host laboratory The muon beam line electricity is a major source of the expenses and MICE would like to request that this be covered by the host lab Collaboration life

MICE CMPB Alain Blondel 13 November Collaboration life Progress on many fronts is encouraging —spectrometer solenoid fabrication started o vendor design approved; first magnet end of August 2007 o will be delivered to FNAL (mag measurements) o RAL november 2007 —201-MHz cavity testing with field to begin (next week) field limited to FC stray field (see lated for CC) —RF power source refurbishment moving forward at Daresbury o 300 kW amplifier tested to 160 kW o fabrication of full station getting under way o CERN RF —R&D hydride bed delivered —Phase II MICE proposal submitted o defense underway —detailed review schedule has been developed o being ~followed! o reviews of tracker, beam line, PID …

MICE CMPB Alain Blondel 13 November UK: 9.7M£ (OST+ rolling grants + CCLRC contribution) Phase II bid under review -- USA: funding from the NFMCC (DOE baseline scenario 4.125M$) +RF source + NSF grant (IIT) 300k$ + MRI grant (tracker + tracker solenoid) 750k$ (NB tracker part was reduced substantially by D0 electronics deal) + DOE suppl. for MUCOOL coupling coil 300k$ further requests submitted: + NSF MRI for MUCOOL CC (refused in resubmitted) + NSF cooling funding proposal by Pr G. Hanson and coll. pending + NSF tracker proposal by Pr G. Hanson et coll pending (1postdoc + 2 PhD students) + *NEW* PIRE proposal by Cremaldi et al Partnerships for International Research and Education support for postdocs and students in international collaboration Summary of funding situation (I)

MICE CMPB Alain Blondel 13 November Japan: US-Japan ~$100k/yr, UK-Japan (travel funds) + 1M$ requested --> 2005 bid was rejected! --> this led to interruption of US-Japan fund resubmitted in Nov (Kajita as PI) (includes also HK R&D) -- Switzerland: PSI solenoid Uni-Geneva-SNF (DAQ, trigger ~150k€) + 2PhD+1RA (will apply to complemetary funding sources to advance remaining 50k€) Bulgaria collaboration -- CERN: 1 RF station providing 4MW (agreed on 3 Nov 2006: Maurizio Vretenar was charged of execution) -- Netherlands: Mag probes (in production) -- Italy (TOF, Calorimeter) subject to success of test and new application here situation is quite worrysome -- China (MICE coupling coils) under study 1st presentation at CM16, bid submitted Summary of funding situation (II)

MICE CMPB Alain Blondel 13 November Japanese Funding Status for MICE Japanese FY2006 Bid for Grant-in-Aid of Ministry of Education 15M Euro/5 years project, lead by Prof. Kenzo Nakamura (KEK) MICE is one of several sub-programs (1M Euro). Others are HK ground investigation, Double beta decays, Nufact accelerator R&D, etc. Unfortunately informed that it was not accepted in May, Funds of about 15k Euro for trackers (station 5) is available. JSPS UK-Japan travel funds (20k Euro/year) are available ( ). Seek for modest supports on LH2 absorbers from KEK (not known yet) Japanese FY2007 Bid for Grant-in-Aid of Ministry of Education Applied again, November, 2006 Bid for the US-Japan funds. Will apply as Muon-collider R&D (commonality) together with US colleagues (January 2007 ?)

MICE CMPB Alain Blondel 13 November INFN contribution to MICE TOF 0, TOF I, EMCal on the beam Sep TOF II on the beam as early as possible Performances preliminarily confirmed in Frascati test beam σ TOF < 60 ps σ EMCal < 7%/√E (GeV) Residuo 2006 K € Richiesta 2007 K € TOF 0 & I CONSUMO INVENTARIO APPARATI MILANO 0 94 PAVIA EMCal CONSUMO INVENTARIO APPARATI ROMA3 <1 77 TRIESTE pending approval by INFN management of availablerequested NB construction funds only + travel, transports etc

MICE CMPB Alain Blondel 13 November PID detectors: There was a successful review of PID detectors Technologically all is ready. TOF0+TOFI are necessary for stage I and II of mice (october 2007) Urgency of Emcal is somewhat relieved by the fact that the first spectrometer solenoid is expected in november 2007 Complete TOF is absolutely needed already at stage III (March 2008) Problem: The available money will not allow completion of TOF0 + TOFI even if part (but not all) of the EMCAL money can be reassigned to TOF electronics. What is needed to complete TOF is ~150 k€. Chances of obtaining this now from INFN are small.

MICE CMPB Alain Blondel 13 November Manpower It has been emphasized that ‘mousepower’ is missing in several areas: -- software -- analysis -- testing and designing PID electronics -- DAQ and controls -- project management and infrastructure there are some good points: -- RAL contribution to DAQ/Controls being envisaged -- Sofia’s contributions to PID have made a difference but on the whole there are ‘opportunities for young physicists’ in MICE! ==>Funding and fellowships for students would be most welcome. some mentioned earlier -- e.g. US PIRE international collaboration grants We should also look for other solutions EU bids for Netwoerk of excellence? JRA within FP7 advanced accceleration techniques application --> Paul Kyberd

MICE CMPB Alain Blondel 13 November CONCLUSIONS Scientifically and technically MICE is making good progress: The collaboration is focused on getting ready to take data in Phase II R&D is advancing well The last 12 months have shown significant developments in MICE funding 1. Clear view of MICE Phase I ++ resolution of CKOV2 issue ++ savings to bring forward steps II and III ++ good progress on infrastructure and construction -- INFN support in a delicate situation -- physics exploitation proposals (manpower e.g. NSF’s Hanson or PIRE) -- Japan funding situation altered -- Resubmitted. 2. Phase II funding is the object of intense activity. ++ critical R&D (200 MHz RF) progressing well but absolutely need MUCOOL coupling coil ++ Harbin ICST proposal for MICE coupling coils (perhaps even MUCOOL’s!) ++ Phase II UK proposal under review