Created site awarenessRecover personal equipment Opportunity to take abandoned equipment.

Slides:



Advertisements
Similar presentations
Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
Advertisements

H2 Layout for EMU a brief report of a couple of visits by Darin A., Jay R., and FG.
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen.
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc., All Rights Reserved. Chapter 16 Other Supply Responsibilities.
Electrician’s Tools Of The Trade Copyright © Texas Education Agency, All rights reserved.
KICKOFF AS PRESENTED 6/17/11, SEE THIS WEEKS SCHEDULE FOP THE LATEST UPDATE Shutdown Shutdown ‘11.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
1 Safety Issues for Hg irradiation Experiment siting - Activation of air and components Activity of Hg – unsealed radioactive source Radioactive waste.
Page 1 PEP-II D&D Planning & Costing Exercises John Seeman Accelerator Systems Division SLAC National Accelerator Laboratory.
A. Bross MTA RF WS August 22, Welcome MTA RF Workshop.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Mercury Chamber Considerations V. Graves IDS-NF Target Studies July 2011.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
Vex 1.0 © 2005 Carnegie Mellon Robotics Academy Inc. Electromagnetic Solenoid This lesson will explain the purpose behind an Electromagnetic Solenoid and.
Bachelor of Technology Mechanical
Electrician’s Tools Of The Trade
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
IDS-NF Mercury System Overview Van Graves IDS-NF 5 th Plenary Meeting April 9, 2010.
PIP Update Linac Utilities for 2014 shutdown Matthew Gardner, 4/23/14.
Other Construction Projects
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Material Disposition Planning Olga Ligeti Radiation Protection Department MARCH 24, 2009.
FIGURE 8-1 Hazardous waste recovery, treatment, and disposal facilities.
WIRE SAW TO CUT PIPES. SPECIALIZED WIRE SAW TO CUT PIPES Technical details: electric or hydraulic driven easy to fix to the pipe under.
UVA Polarized Target In Hall A Pictures and Cost Paul Brindza Dec 17, 2009.
Get Connected Autodesk Revit MEP Connectors Demystified Shawn C. Zirbes Chief Technical Officer Image courtesy of Hobart, Yañez, Ramos, Maguey, and Martínez.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
Illegal Dumping Prevention MWMA - April Drivers Special handling requirements Landfill bans Cost Lack of convenient & affordable disposal options.
Why is it important? Your body’s cells depend on the blood vessels to bring nutrients & remove wastes.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Al Pendzick LEReC Civil Construction.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
PEP-II Disassembly Technical Systems PEP-II D&D Review 6-Aug-2007 S.DeBarger S.Ecklund, A.Hill, D.Kharakh, M.Zurawel.
LIU – TCDI. INTEGRATION STATUS 1 ST APRIL 2015 Frédéric Galleazzi EN/MEF/INT Antoine Kosmicki EN/MEF/INT EDMS :
ILC BDS Kickoff Meeting Magnet Power Supplies RDR Concepts and Completeness Paul Bellomo SLAC Power Conversion Department October, 2007.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Understanding Building Systems. Physical Layout Building Plans Architectural Plans Structural Plans Mechanical Plans Plumbing Plans Electrical Plans HVAC.
Environmentally Sustainability The environment is the place we live and work in and making sure that it is not damaged or unduly changed for the worse.
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
EAR2 Beam Line Report on the Status C. Weiss EAR2 Beam Line - Report on the Status1.
What’s NEWONE ? Areas of Business Product Lines Share the Vision.
09/07/07Shutdown’07 Week 5 F.G. Garcia1 MTA beam line installation Weekly Report September 07, 2007 Period covered: August 31 st to September 7 th (Week.
Students understand the relation of hydropower compared to wind power. How does energy develop through the flow of current (water) moving through a generator?
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
Fuses. What are they Fuses break the circuit if there's a fault Breaks if there is too much current Protection of the wire and the appliance When too.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
1 CNGS Electrical Services (PBS 5.5) S. AKHTAR - ST/EL.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
Magnetism By: Manisha Shrestha. What is a magnet? A magnet is an object that attracts certain materials, usually objects that are made of iron or steel.
1 st LTEX meeting Protecting the experimental caverns and personnel from a "sector 34 like" incident: work planned in the LHC tunnel Prepared by M GASTAL.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Layout and conventional facility N.Terunuma KEK. Conventional facility 1 Layout of beam line should be fixed until end of June We have to start.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
In elementary school, you may have heard the phrase “Reduce, reuse, recycle.” With current rates of sustainability, this phrase may become more relevant.
Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada Propriété.
Chapter 10 Raceway Systems. Chapter 10 Raceway Systems.
Power | Case Study The Client
Safety Topic Are YOU The Hazard? Quality Testing Services.
Teleconference ACS – FREIA 18th April 2017
Construction Tools, Electrical and Plumbing Suppliers
Presentation by Team 2.
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
J. Seeman Assistant Director for PPA/LCLS
SHMS Downstream Beamline
East Hall under construction
Presentation transcript:

Created site awarenessRecover personal equipment Opportunity to take abandoned equipment

Variable Speed Drives Bender magnet

Weighed the practicality and benefit versus cost of recovery Obsolete Equipment too specific to a certain experiment

Valves Electrical receptacles, conduit and connectors Costly to recover Services Cables and cable trays Impractical to keep Scattering chambers Beam dumps No foreseeable repurpose

Determined what could be reused or repurposed Standardized Highly specialized expensive equipment

Flow metersMagnetsPower Supplies

Surveys done of the area Determine activity of equipment Plan to minimize disposal

Beam pipes Concrete shielding blocks TISOL beam dump Targets Slightly active steel

Cutting live wires Cutting wrong cables Lead pigs left behind containing active foils Handling of active waste

Evolution of media Lack of controlled documentation Budget Creating a “team”

Alterations to roof beams Tunnel and hatches Ariel target area