GAS TURBINE OPERATION AND MAINTENANCE

Slides:



Advertisements
Similar presentations
Mr.B.L.Prabhu, Safety Officer Boiler Safety Measures.
Advertisements

Combustion Design Considerations
Auxiliary Power Plant Fundamentals
Turbojets.
MATERIALS TESTING.
Steam Generation – Operational Flexibility and Lifetime Extension Considerations Kevin Murray Senior Integrity Engineer Marsh Power Forum – Istanbul, October.
Jet Engine Design Idealized air-standard Brayton cycle
Turbocharger Two stroke crosshead engines must be supplied with air above atmospheric pressure for it to work. Although turbochargers were developed in.
GAS TURBINE PRINCIPLE :-- Fluid is drawn into the compressor and after compression passes to a combustion chamber. Energy is supplied in the combustion.
Department of Mechanical Engineering ME 322 – Mechanical Engineering Thermodynamics Lect 27b Jet Aircraft Propulsion.
Jet Engine Design diffuser compressor combustion chamber turbine nozzle P=constant q out q in T s 1-2 Isentropic compression in.
1 Environment Engineering I Dr. Amal Hudhud Dr. Abdel Fattah Hasan An-Najah National University Civil Engineering Department Air Pollution Chapter Eleven-
Overview: Hazardous Waste Combustion. What is Hazardous Waste? Definition of Hazardous Waste –Hazardous wastes are distinguished from other wastes by:
Steam Generation Efficiency
3-Multi - Can Annular Combustor 3-Multi - Can-Annular Combustor The third design and the one preferred by most manufacturers, is the can-annular combustor,
Chalmers University of Technology Lecture 3 Some more thermodynamics : Brief discussion of cycle efficiencies - continued Ideal cycles II –Heat exchanger.
Gas Transmission Pipelines
One-Dimensional Conduction Analysis of Thermal Barrier Coated Turbine Vanes Walter VanCleave.
ES 202 Fluid and Thermal Systems Applications of Thermodynamics and Fluid Mechanics.
PACCON 2013 PREDICTION OF NITROGEN OXIDE GENERATED FROM GAS TURBINE ENGINE Global Chemical Sciences for Green Community NATCHANON CHAIPRASERT / AMORNCHAI.
Shaft Power Cycles Ideal cycles Assumptions:
MAE431-Energy System Presentation
Thermal energy Ch. 6 mostly. Transferring thermal NRG There are three mechanisms by which thermal energy is transported. 1. Convection 2. Conduction 3.
TURBOCHARGERS & SUPERCHARGERS
Practical Energy Conservation Tips for Gas Turbine Propulsion Ships.
POWER PLANT TECHNOLOGY INTRODUCTION AND OVERVIEW Prof. Anand Bhatt.
Introduction of jet engine
Gas Turbine Power Plant
Gas Power Cycle - Jet Propulsion Technology, A Case Study
Operation and Maintenance
Gas Power Cycles.
PRESENTED BY ILAMVAZHUTHI.C 1 Under the guidance of Mr.S.CHOKALINGAM M.E (Assistant professor) DEPARTMENT OF MECHANICAL ENGINEERING E.G.S.PILLAY ENGINEERING.
Pipelines DYSTIFF s.r.o., Olomouc. Revamping of the Vacuum Distillation Unit Piping stress and strength calculation of 30 pipelines according to B31.3.
FUNDAMENTALS OF GAS TURBINE CONTROL
Energy And Environmental Technology
Gas Turbine Theory and Construction. Introduction Comprehend the thermodynamic processes occurring in a gas turbine Comprehend the basic components of.
Turbomachinery Design Considerations
CYLINDER LINERS LESSON FOUR. 1.LINER DEFINITION A removable component, cylindrical in shape, inserted into the engine block. It can be replaced when worn.
Turbochargers CHAPTER: Turbochargers
Independent Study Atmospheric Effects on Aircraft Gas Turbine Life Part II: Impacts on Mechanical Systems July 6, 2011 Kevin Roberg.
1 SHELL FLEET TECHNOLOGY TOUR August 29, VALUE DELIVERY THROUGH SERVICES OIL CONDITIONING MONITORING PROGRAM.
Unit 2 -Gas And Diesel Power Plants
MECHANICAL ENGINEERING,
Gas dynamics of Real Combustion in Turbo Combustor P M V Subbarao Professor Mechanical Engineering Department Make Sure that design is Acceptable to Gas.
Lecture Objectives: Finish with absorption cooling Power generation Rankine cycles Connect power generation with heating and cooling –CHP –CCHP.
Turbojet engine (Rocket)‏
Gas Turbine Power Plant
PARISUTHAM INSTITUTE OF TECHNOLOGY AND SCIENCE DEPARTMENT OF AERONAUTICAL WELCOME STUDENTS BY ANBARASAN.T DEPT. OF AERONAUTICAL.
CYLINDER LINERS.
Performance Analysis of Multi Stage Axial Flow Compressors
 FAN  COMPRESSOR  COMBUSTOR  TURBINE  MIXER  NOZZLE.
TURBINE ENGINE REMOVAL AND OVERHAUL. TURBINE ENGINE REMOVAL REASONS FOR: Engine Life Span (TBO) Usually specified components Not necessarily engine assembly.
Prepared by : Nishant .A. Raval
T700 System Overview UH-60 IPC CW4 Jim Hill.
Advantages of Rotating Machines Less balancing problems Low lubricating oil consumption Higher reliability.
POWERPLANT INTRO TO TURBINES Spokane Community Community College College.
Des. Ton Nguyen. MAIN PARTS  Fan  Compressor  Combustor  Turbine  Nozzle.
Thermal power plant , panipat
Content: Introduction A Simple Gas Turbine Plant & It’s Working Plant Layout Types according to Cycle 1. Open Cycle Gas Turbine Plants 2. Close Cycle.
Gas Turbine Power Plant
Prepared by: Kamil Bin Sahidin
Gas Turbine Theory and Construction
Turbo Power Life Prediction- Overview
Overhaul of Combustion Turbines Under NSR Regulations
CACTUS MOON EDUCATION, LLC
An Overview of Carpenter‘s High-Temperature Alloys
FLUID MECHANICS: DERIVATION OF THRUST EQUATION
MATERIALS TESTING. Why are metals tested ? Ensure quality Test properties Prevent failure in use Make informed choices in using materials Factor of Safety.
Selecting materials based on their properties
Jet Aircraft Propulsion
Presentation transcript:

GAS TURBINE OPERATION AND MAINTENANCE P2M FTUI September 2008

Operating Factors Affecting Maintenance Type and quality of fuel Condensate, contaminants, etc Starting Frequency Thermal cycles Load cycles Environment Abrasive and corrosive condition

Recommended Inspection Interval Following table shows the operating hours at which inspection should be performed for operation on gas fuel and continuous duty Recommended Inspection Interval Note: (1) Hours mean Ëquivalent Operating Hours”reflecting the operation conditions of Gas Turbines

“Roll-in and Roll-out” Procedure One (1) complete set of hot parts shall be ready for Rolling-in. The parts taken out (Roll-out) shall be reused/repaired/rejuvenated prior to the next inspection

Summary of GT Inspection Procedure Inspection Items Combustor Inspection Dismantling combustor basket Visual inspection & NDT (1) of fuel nozzles, combustor baskets and transition pieces Visual inspection of turbine blade row 4 and vane row 1 and 4 Visual inspection of compressor IGV, blade row 1 and vane row 1 Turbine Inspection Lifting the upper housing of the turbine Visual inspection and NDT (1) of turbine blades, vanes and seals Combustor inspection is carried out at the same time Major Overhaul Inspection Lifting the upper housing of the turbine and compressor Lifting the rotor Visual inspection & NDT (2) of all components from expansion joint of the inlet air to the first expansion joint of the exhaust gas Inspection of auxiliaries, control systems and instruments NDT (1) : Non Destructive Test (Penetrant Test) NDT (2) : Non Destructive Test (Penetrant Test, Magnetic Particle test and Ultrasonic test

Combustor Inspection No 1. Compressor inlet (1) No 2. Turbine blade row 4 (1) No 3. Flame detector and igniter (2) No 4. Fuel nozzle (2) No 5. Combustor basket (2) No 6. Transition piece (2) (1): Visual Inspection (2): Roll-in & Roll-out Parts

Combustion Inspection Schedule (for one (1) Gas Turbine)

Turbine Inspection No 6. Turbine blade (2) No 1. Compressor inlet (1) No 7. Turbine vane (2) No 8. Compressor last row and OGV’s blade and diaphragm (1) No 1. Compressor inlet (1) No 2. Flame detector and igniter (2) No 3. Fuel nozzle (2) No 4. Combustor basket (2) No 5. Transition piece (2) (1): Visual Inspection (2): Roll-in & Roll-out Parts

Turbine Inspection Schedule (for one (1) Gas Turbine)

Major Overhaul Inspection No 1. Flame detector and igniter (1) No 2. Fuel nozzle (1) No 3. Combustor basket (1) No 4. Transition piece (1) No 5. Turbine blade (1) No 6. Turbine vane (1) No 7. Compressor blade and diaphragm No 8. Exhaust turbine and compressor casing No 9. Compressor blade ring No 10. Turbine blade ring #1, #2, #3 and #4 Turbine journal brg and thrust brg Rotor (2) (1): Visual Inspection (2): Roll-in & Roll-out Parts

Major Overhaul Inspection Schedule (for one (1) Gas Turbine)

Routine Maintenance

Hot Parts Expected Life Time The expected life of hot parts has been established based on design strength and the result of past operating experiences. The expected hot parts life hours with qualified repairs are as follows:

Definition of “EOH” Equivalent Operating Hours To calculate hours of operation equivalent to base load continuous duty operation, when operation has been with liquid fuel and/or cyclic duty, it is necessary to segregate the actual hours of operation by duty (fired hours per start) and fuel (gas or oil). These segregated values are then used in the following equation to calculate the hours equivalent to operation at base load with gas fuel. where, H = equivalent continuous duty gas fired hours BHG = base load operating hours with gas fuel BHO = base load operating hours with distillate oil fuel PHG = peak load operating hours with gas fuel PHO = peak load operating hours with distillate oil fuel CDF = cyclic duty factor, determined from the following table

Cyclic Duty Factor Table

Hot Parts Life Evaluation Deterioration Creep under High Temperature Low Cycle Fatigue Metal Loss by Surface Oxidation & Corrosion Life diagnosis Load Cycles Start / Stop Frequency Fuel Quality Environment Maintenance Practice Life diagnosis procedure is decided based on each customer’s operational conditions

Life Evaluation Method Evaluation for Maximum Use-up Turbine Blade Metallurgical Analysis γ’ phase Creep Rupture Property Turbine Vane Precipitated Carbide Tensile Property

Life Evaluation Process for Turbine Blade

Life Evaluation Process for Turbine Vane

Life Extension Technology Reheat Technology High temp. heating of deteriorated super alloy Decomposition & re-solution of hypertrophied γ’ phase and intergranular carbide Standard heat treatment the material Recovery of mechanical properties

Terima Kasih