2014 Distributed Generation Contracts Program – Recommended Megawatt Allocation Plan November 27, 2013.

Slides:



Advertisements
Similar presentations
2014 DISTRIBUTED GENERATION CONTRACTS PROGRAM – SUMMARY AND RECOMMENDATIONS Office of Energy Resources Monday, December 2, 2013.
Advertisements

October 16, 2013 Feed In Tariff (FIT) and Renewables Procurement in Ontario Dirk van de Waal – Business Analyst, Renewables Procurement.
APPLICATION OF THE ERES SUPPORT MECHANISM IN ROMANIA Primary and Secondary Legislation 1.
MINI HYDRO POWER DEVLOPMENT IN SRI LANKA - INITIATIVES
Distributed Generation Contracts Program - Updates Office of Energy Resources Tuesday, October 8, 2013.
Cost of Services Pricing Enables a Net Zero Energy World © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. 1.
SolarCurrents - Customer-Owned Expansion Phase 2 Program Overview MREP Solar Committee Meeting December 12, 2012 Julie Londo, Program Manager.
SolarCurrents TM Rebuild Ypsilanti Julie Londo August 26, 2010.
1 Regulatory Developments and Impacts Involving Electricity Storage in Texas Elizabeth Drews 31 st USAEE/IAEE North American Conference Austin TX, November.
Mexico’s initiatives with respect to Renewable Energies World Bank February 2012 Washington D.C. Alejandro Peraza-García Director General of Electricity.
Unlocking value from existing utility assets NARUC Meeting – February 2012
1 EERMC Public Meeting on Combined Heat and Power September 17, 2013.
Net Metering and Interconnection A Policy Perspective Brad Klein Staff Attorney Envt’l Law & Policy Center March 28, 2007.
Prospero LLC December 2, 2004 Connecticut’s Energy Future Financing Sustainable Energy.
NERC LTRA Update / CDR Capacity Counting Issues
Federal Energy Regulatory Commission Proposed Rule on Small Generator Interconnection RM July 23, 2003.
PRACTICAL ASPECTS OF CUSTOMER OWNED GENERATION A DISCUSSION OF INTERCONNECTION POLICIES, METERING STRATEGIES AND BILLING CONSIDERATIONS IMUA ANNUAL CONFERENCE.
The Community Renewable Energy Amendment Act of 2013.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
ORECA Director Education Conference June 2, 2015 Jeff Beaman, Member Services Director Central Electric Cooperative The Road to Community Solar.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Slayton Solar Project RDF Grant Award EP3-10 Presentation of the Project Results to the RDF Advisory Board January 8, Project funding provided by.
Renewable Energy Regulation May 16, 2013 Paul J. Roberti, Commissioner Rhode Island Public Utilities Commission.
O VERVIEW OF THE MAIN OCEAN WAVE ENERGY PROJECTS WORLDWIDE Sadayoshi Ito.
CLEAN ENERGY TO PROMOTE CLEAN AIR & IMPROVE ELECTRICITY PRICE STABILITY Alden Hathaway, ERT Debra Jacobson, GWU Law School April 6, 2006.
Economy Specific Research and Introduction of Successful Results of New / Renewable Energy Technology Development and Demonstration Toru Usami International.
ERS Procurement Methodology 09/04/2013 ERS Workshop Presented By: ERCOT Staff.
Colorado Renewable Requirements, Policies, and Projects James Tarpey, Esq. Commissioner Colorado Public Utilities Commission 1560 Broadway, Suite 250 Denver,
Net Metering Fall 2009 Customer Meetings. What is Net Metering?  Net metering allows the meter to “run backwards” and record generation in excess of.
Political Factors Affecting the Renewables and Energy Efficiency Remarks of Ron Binz, Chairman Colorado Public Utilities Commission October 15, 2010 IPPAI.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
Overview Interconnection Federal Regulations –1978 PURPA Legislation –1992, 2005 & 2007 PURPA Legislation Changes –RUS Rules DG Policy State Regulations.
Feed In Tariffs A Policy for Rapidly Expanding Renewable Energy Deployment.
1 Kansas City Power & Light Home Performance with ENERGY STAR® Program Updates January 14, 2014.
CAPTIVE POWER POLICY. Section 44 of the Electricity(Supply) Act, 1948 gave birth to Captive Generation.  Any other person to establish or to acquire.
DG Toronto Hydro’s Perspective Task Force on Distributed Generation Richard Lü VP, Environment, Health & Safety March 5, 2003.
New Jersey’s Clean Energy Program: 2011 Renewable Energy Plan Overview of Final Compliance Filing REC Meeting 12/7/10 Charlie Garrison.
CALIFORNIA ENERGY COMMISSION d n ACRE Second Annual Conference California: Successes, Issues, and Opportunities Washington, D. C. July 8, 2003 Terry Surles.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Demand Response as Capacity in New York National Association of Regulatory Utility Commissioners Winter Committee Meetings Washington, DC February 17,
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
CRR Issues Transparency provided by CRR Reports CRR EDS handbook Business process NPRR TPTF November 27, 2007.
1 Demand Response A 28 Year History of Demand Response Programs for the Electric Cooperatives of Arkansas by Forest Kessinger Manager, Rates and Forecasting.
2014 Distributed Generation Contracts Program - Megawatt Allocation Plan Tentative Scenarios Thursday, November 7, 2013.
1 Distributed Renewable Generation Legislation as of 5/02/07  SB 483 by Fraser- Relating to the regulation of electric generation capacity ownership in.
YVEA Solar Facts & Distributed Generation Requirements YVSC Talking Green November 17, 2015 Megan Moore-Kemp Key Accounts Rep.
Philippine Feed-In Tariff System Implementation 1.
Renewable Energy Act of 2008
2004/06/0 2 Market Operations Standing Committee of the IMO1 Small Facilities - Technical Requirements Rhonda Wright.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
RFPEG2013 PRE-BID MEETING RFPEG2013 – Pre-Bid meeting January 9, 2014 Presentation by Derek Davis – Public Utilities Commission.
Program Overview Solar resource will be built by j uwi, (pronounced “you-vee”), a developer based out of Boulder, Colorado. Solar farm will be located.
March 24, 2016 Kentucky Municipal Energy Agency Consideration of Renewables.
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
UTC STUDY OF DISTRIBUTED GENERATION AND RECOMMENDATIONS Presentation for the Washington Future Energy Conference October 19, 2011.
ROK-PH Partneship: Exploring Cooperation in Renewable Energy Mr. Ariel D. Fronda Division Chief, Geothermal Energy Management Division Renewable Energy.
and the Advantages of Going Solar in 2017
Renewable energy support schemes in the Republic of Moldova
Republic of the Union of Myanmar Electricity Sector Financial and Regulatory Issues 18 May 2016 by Myanmar Energy Team The World Bank.
“Other” Cost Estimates
Self-Generation Incentive Program (SGIP)
Operationalizing One Nation One Grid
Generation Adequacy Task Force Update to WMS
Restructuring Roundtable March 24, 2017 Boston, MA
The LREC/ZREC PROGRAM and RFP Results
Dominion Investments in Virginia
Case No UT PNM Workshop Comments
Arslan Ahmad Bashir Student No
Making Green Tariffs Work for Your Customers
Presentation transcript:

2014 Distributed Generation Contracts Program – Recommended Megawatt Allocation Plan November 27, 2013

2014 Program - Megawatts Available Scenario MW available for the 2014 DG Program. The capacity number will be subject to a final adjustment by the docket filing to the Public Utility Commission on December 16 th. There could be additional MW made available in This will be dependent on the projects awarded contracts 2012 and 2013.

2014 Allocation Plan - Recommendations The OER will be recommending to the DG Board the following: 1.Establish an annual target, instead of a per enrollment target. 2.An annual target provides flexibility to the program, and was utilized with the 2011 and 2012 programs. 3.Maintain the rollover rule of kW for technologies from the 2013 DG program rules for the first 2 enrollments in If there are no applications received in the final enrollment for a given technology/class, then those kW shall be committed to projects where there is the greatest demand.

2014 Annual Goal TechnologyEligible System Sizes 2014 Allocation Potential Number of Projects Contracts History Small Solar kW400 kW2-85 Medium Solar kW4,100 kW Large Solar501-1,000 kW3,000 kW3-66 Wind50-1,500 kW3,000 kW1-22 Small Scale Hydropower kW1,000 kW2 0* Anaerobic Digestion kW1,000 kW20 Total12,500 kW 2014 is the first year that small hydropower is eligible to participate.

First Enrollment TechnologyAllocation Small Solar ( kW DC) 200 kW* Medium Solar ( kW DC)1,400 kW Large Solar (501-1,000 kW DC)1,000 kW Wind (50-1,500 kW)1,500 kW* Small Hydropower ( kW)500 kW* Anaerobic Digestion ( kW)500 kW* Total5,100 kW *These technologies allocations will be allowed to rollover until the 3 rd enrollment. If no applications are received in the last enrollment for a particular class, those kW will be awarded to projects where there is the greatest demand.

Additional Capacity in 2014 Program National Grid shall notify the OER and DG Board of any additional capacity that becomes available for the 2014 program. The DG Board in consultation with the OER will determine where that additional capacity is allocated to for the different technologies. Project demand and ceiling price results through the first two enrollments will determined where that additional capacity is allocated. National Grid and the OER shall notify the Public Utility Commission of any additional capacity added to the program prior to the last 2014 enrollment.