Chavdar Ivanov, ENTSO-E Secretariat | 11-14 October 2010 ENTSO-E Roadmap on CIM CIM User Group meeting, 11-14 October 2010, San Francisco, US.

Slides:



Advertisements
Similar presentations
SETSO Task Force Network Access and Congestion Management for the south-eastern European region SETSO Task Force Network Access and Congestion Management.
Advertisements

1 SETSO TF SETSO TF NACMPF SG Congestion Management and NTC.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
TC 57 CIM Release Plan and Technical Issue Submittal/Tracking Kendall Demaree CIM Model Manager June 11, 2008 CIM Users Group Vasteras Sweeden.
© 2011 Siemens Energy, Inc. All rights reserved. Answers for energy. PSS ® ODMS a proven solution for CIM-based network modeling Anna Geevarghese T&D Service.
The Capacity Allocation & Congestion Management Network Code An overview & status update Antonio Lopez-Nicolas Manager - Markets.
Role of CIM for Power System Model Exchange: Europe - ENTSO-E Experience with CIM CIM Users Group February 26, 2013 Melbourne, Australia Chavdar Ivanov,
Jose Braz, ERGEG Conference on Implementing the 3rd Package 11th December 2008 The Agency for the Cooperation of European Energy Regulators.
ENTSO-E and how we can use this new body in the future in terms of market, planning and operations 13 May 2009 CIM user group meeting, Genval, Belgium.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Click to edit title Click to edit sub-title The European Network of Transmission System Operators Stockholm 14th of September 2009 Teun van Biert - Convener.
P.Labra – EWEA March 2012 ENTSO-E’s & TYNDP’s vision on adapting European Transmission Grid to large amounts of wind power.
FOURTH MEETING OF THE OIC MEMBER STATES’ STOCK EXCHANGES FORUM Istanbul, October 2-3, 2010 Hüseyin Erkan Istanbul Stock Exchange Chairman & CEO 1.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
Chavdar Ivanov, ENTSO-E Secretariat | 18 June 2010 ENTSO-E Roadmap on CIM CIM User Group meeting, 18 June 2010, Milan, Italy.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Network (Common) Model Management System Presentation to ERCOT October 21, 2008 Thomas F Garrity Vice President Energy Management and Automation Siemens.
Working Group Summaries Genval, Belgium May 14, 2009.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Contractor on Website and Internet Communication Technologies Financing Energy Efficiency Investments for Climate Change Mitigation Website and Internet.
Generation & Trading CIST REGIONAL ENERGY MARKET IN SOUTH EAST EUROPE (REM) Athens – 27 th of October 2004.
Generation & Trading CIST REGIONAL ENERGY MARKET IN SOUTH EAST EUROPE (REM) 3rd South East Europe Energy Week – 1 to 4 th June 2004.
0 Vladas Paškevičius Power System Director Lietuvos energija AB Vilnius, 5 th of October 2007 International Seminar “Prospects for the co-operation between.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Creating a Single European Energy Market – the Regulatory Perspective London, 30. January 2007 ERGEG Electricity Regional Initiative Central-East Europe.
Market Design of SE Europe: Reflections from the 3rd Forum on the Way Forward 6 th Permanent High Level Group Meeting Athens, 07 December 2003.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
UCTE Viewpoint towards CIM – project report Chavdar Ivanov, Ph.D. UCTE Secretariat, Convenor of AhG UCTE format CIM User Group meeting, 12-15th May 2009,
Pilot project – Energy Trade Data Reporting Scheme 1 st Steering Committee Meeting Brussels, 5 October 2010.
© Siemens Energy, Inc Energy Automation CIM Model Management Kurt Hunter 2009 IEEE Power System Conference & Exposition March 18, 2009.
Energy Agency of the Republic of Serbia
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
EMS User’s Group Presented By Margaret Goodrich Project Consultants, LLC Presented to EMS User’s Group Austin, TX September.
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
XIV th Florence Forum 24/25 September 2007 Tahir Kapetanovic / Nicolas Bonnesoeur Chairmen of the CEER Electricity Security of Supply TF C07-SOS-03-03a.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
WG Summaries Austin, TX October 24, Process WG Co-chairs: Terry Saxton & Ed Dobrowolski Scope: Overall management of the CIMug Development and tuning.
Comments on Guidelines on Transmission Tariffs General ETSO welcomes the new draft as positive step –There are many important improvements to the previous.
TC 57 CIM user Group Meeting June 2010 Milano 1 Technical Committee 57 POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE.
Working Group Summaries Charlotte, NC November 12, 2009.
TC 57 CIM user Group Meeting October 2010 San Francisco 1 Technical Committee 57 POWER SYSTEMS MANAGEMENT AND ASSOCIATED INFORMATION EXCHANGE.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
© Siemens Energy, Inc Energy Automation CIM Model Manager Report Kurt Hunter CIM Users Group Meeting 13 Nov 2009.
CIM User Group Overview Terry Saxton Vendor Co-Chair Open Smart Grid AMI-Ent Task Force Meeting July 14, 2009.
1MIL client logo to be positioned at the mark minimum height maximum size navigator Text Lines MIL Agenda.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
ISO/TC 204 WG 3-Database Technologies
Support- IRDiRC Proposed Work Plan And Communication Strategy
The state of implementation of CIM in MAVIR
ENTSO-E IT project for Fundamental Electricity Data Transparency
EDF expectations regarding Interoperability tests
Amendment Invoice Task Force Progress Report
Temporary Capacity Restrictions: TCR WG & TCR tool
CIM Model Manager Report
Activities of the UNECE-UNODC Task Force on Victimization Surveys
IOP perspectives Some European point of view with the help of Alstom,Entsoe,EDF Andre Maizener 11/11/2009.
Amendment Invoice Task Force Progress Report
European Network of Transmission System Operators for Electricity
SOCIAL DIALOGUE WITHIN EUPAN
Background During last GRPE meeting, EU, Japan and Korea requested the creation of an RDE IWG The GRPE accepted the proposal during its June 2018 meeting.
Amendment Invoice Task Force Progress Report
Amendment Invoice Task Force Progress Report
Model Exchange TF Vasteras, June 12, 2008
Model Exchange TF Vasteras, June 12, 2008
Presentation transcript:

Chavdar Ivanov, ENTSO-E Secretariat | October 2010 ENTSO-E Roadmap on CIM CIM User Group meeting, October 2010, San Francisco, US

ENTSO-E fully operational since 1 July 2009 Represents 42 TSOs from 34 countries 525 million citizens served 828 GW generation 305,000 km of transmission lines managed by the TSOs 3,400 TWh/year demand: 400 TWh/year exchanges: Replaces former TSO organisations: ATSOI, BALTSO, ETSO, NORDEL, UCTE, UKTSOA Web site: ENTSO-E Roadmap on CIM | Chavdar Ivanov | October 2010 | Page 2 of 16

Development and Implementation of CIM in ENTSO-E  November 2007: UCTE agreed to launch an initiative for development of new UCTE XML based data exchange format that will considered as a standard for exchange of load flow and dynamic data and allows performing of all kind of analyses as follows: steady state, unbalanced short circuit and dynamic analyses.  AhG UCTE format was established.  May 2008: UCTE Steering Committee approved Cooperation of AhG “UCTE format” with international organizations aiming at inclusion of UCTE needs into international standard UCTE participation in EPRI project (CIM for Dynamics)  Summer 2008: UCTE joins the EPRI Project and creates a liaison with IEC TC57. UCTE CIM TF is established during CIM user Group meeting in Vasteras (June 2008) ENTSO-E Roadmap on CIM | Chavdar Ivanov | October 2010 | Page 3 of 16

Development and Implementation of CIM in ENTSO-E  January 2009: UCTE Steering Committee approved Migration Policy. Priority of migration of “planning” models is given.  March 2009: UCTE IOP. Successful interoperability among IOP participants  May 2009: UCTE Profile finalized and submitted to IEC  July 2009: ENTSO-E is fully operational: new work organization related to CIM is implemented All contracts and agreements have been transferred from UCTE to ENTSO-E. ENTSO-E has liaisons with IEC TC57 (WG13 and WG16) and it is a member of EPRI project “CIM for Dynamics”, etc.  July 2009: CIMdesk and Migration Converter provided to ENTSO-E members  Nov 2009: First IOP CIM for Dynamics. The concept is proved ENTSO-E Roadmap on CIM | Chavdar Ivanov | October 2010 | Page 4 of 16

Important ENTSO-E decisions  1 Oct 2009: System Development Committee (SDC) agreed that CIM/XML will be used in ENTSO-E data exchanges related to SDC activities (system studies, planning data exchanges)  2 Sep 2009: System Operations Committee (SOC) recommends:  Regional Group Continental Europe: The change from the UCTE format to CIM was decided by the UCTE Steering Committee. The goal is to switch to the new format before the end of 2010 at the latest (DACF exchanges)  Other Regional Groups to consider implementation of the standard with an aim of the pan-European harmonization  2 Dec 2009: SDC and SOC: Approved the roadmap for future development and implementation of updates of the CIM/XML format  11 Dec 2009: SDC, SOC and Market Committee: Approved ENTSO-E CIM Interoperability tests ENTSO-E Roadmap on CIM | Chavdar Ivanov | October 2010 | Page 5 of 16

ENTSO-E Secretariat serves as a central function of coordination, maintenance and support of Common Information Model (CIM) related issues and therefore, it is the interface to international organizations 6 - Maintenance ENTSO-E CIM tools; - contacts with providers Requests that concern CIM must be submitted to Secretariat ENTSO-E Data Expert Group System Development Committee Operations Committee Market Committee WGs defining needs International organizations: IEC, EPRI, CIMug, … - Liaisons, - Submitting ENTSO-E needs, - - Participation in the discussion, - etc - Discussion on Committees/WGs requests; - Information on IEC opinion; - Possible solutions - etc. CIM tools Secretariat WGs defining needs WG NM&D WG EDI SG NMFT in RG CE CIMdesk; Migration Converter ENTSO-E Roadmap on CIM | Chavdar Ivanov | October 2010 | Page 6 of 16

Current ENTSO-E CIM/XML Profile  Current ENTSO-E Profile is the “UCTE CIM Profile” tested in UCTE IOP in March 2009 in Paris. THIS IS THE PROFILE THAT IS BEING IMPLEMENTED BY ENTSO-E MEMBERS.  Updates of this profile should follow the approved Roadmap  Proposals for changes are welcome and will be discussed within ENTSO-E, IEC and will be tested in the ENTSO-E IOP once agreed among IOP participants.  Current ENTSO-E CIM/XML profile is published on ENTSO-E web site (CIM part:  A draft version of the second edition of the ENTSO-E CIM/XML profile was developed for the ENTSO-E interoperability test in July It is also available on the ENTSO-E web site ( NTSO-E_CIM_Model_Exchange_Profile_v2_draft_7_IOPversion_12July2010.zip ) NTSO-E_CIM_Model_Exchange_Profile_v2_draft_7_IOPversion_12July2010.zip ENTSO-E Roadmap on CIM | Chavdar Ivanov | October 2010 | Page 7 of 16

Roadmap for future implementation of CIM  The aim: to structure the implementation effort. No yearly implementation. An exception could be only if a change is introduced which is critical for ENTSO-E processes  The implementation process is foreseen to last one year.  On regular basis the implementation effort is foreseen every three years, if necessary.  Next versions of the ENTSO-E Profile have to be approved by System Development Committee (SDC). In case of changes that affect operational data, System Operations Committee (SOC) decision is also required.  SDC or SDC&SOC decision ensures one year implementation period. Coming into force date is fixed and mandatory for TSOs ENTSO-E Roadmap on CIM | Chavdar Ivanov | October 2010 | Page 8 of 16

ENTSO-E CIM Interoperability Tests  1 st ENTSO-E Test “CIM for System Development and Operations” was announced on 29 Jan  The test was held in Brussels in the week of 12 July  ENTSO-E IOP plans for 2011 will be synchronized with WG13 and WG16 plans in order to improve IOP efficiency. Announcements will follow. Test name / Schedule on 1. ENTSO-E IOP “CIM for System Development and Operations” May-JuneMarch-April 2. ENTSO-E IOP “CIM for Energy Market” October- November May-June Postponed for 2011 Week of 12 July 2010 ENTSO-E Roadmap on CIM | Chavdar Ivanov | October 2010 | Page 9 of 16

ENTSO-E CIM Interoperability Tests Registered vendors  BCP Busarello + Cott + Partner AG (NEPLAN)  Siemens Power Technologies International (PSS/ODMS; PSS/E)  CESI (SPIRA; CRESO; SICRE)  Tractebel and RTE (EUROSTAG)  ABB Power Technologies (ABB Network Manager)  Open Grid Systems (Cimphony)  FGH (INTEGRAL7)  SISCO (UIB Adapter for PI-AF)  ABB (BMS CIM Explorer)  Intercompro AG (ISPEN)  EMS (Power System Analyzer, PSA) – not present in the test  AREVA T&D (e-terrasource; e-terraplatform)  EDF R&D (GEDEON Database; CIMclipse; CIM-ENTSO-E Converters)  DIgSILENT GmbH (PowerFactory 14.1)  TIBCO (TIBCO ActiveMatrix platform)  GE Energy (Enterprise Gateway) In addition to these vendors, GE Energy (PSLF) is interested to participate in the preparation leading up to the Interoperability test, but will not participate in the actual test. ENTSO-E Roadmap on CIM | Chavdar Ivanov | October 2010 | Page 10 of 16

ENTSO-E IOP Report  Finalized and published in mid August  Available on the ENTSO-E web site:  Identified CIM issues were listed in the final report and submitted to IEC WG13 for further discussion. The expectation is that CIM15 will resolve most of the issues ENTSO-E Roadmap on CIM | Chavdar Ivanov | October 2010 | Page 11 of 16

ENTSO-E and CIM Tools  CIMdesk  Visualization and editing tool developed by PowerInfo LLC, US  Provides users with possibilities for direct editing of CIM data exchange format and graphical visualization  It is not related to the migration. It will be used and maintained as long as CIM /XML format is used  Maintenance contact ends in July A new maintenance contract which includes re-licensing conditions is now negotiated  Migration converter  Developed by EDF R&D, FR  Converts from UCTE CIM to UCTE DEF (current version: version 02) and vice versa  To be used during the migration stage; useful for RG Continental Europe  Maintenance contract ends in the end of 2010 ENTSO-E Roadmap on CIM | Chavdar Ivanov | October 2010 | Page 12 of 16

ENTSO-E exchanges in CIM  System development – planning exchanges Still in migration period. Implementation efforts are necessary from both sides users and vendors. Some TSOs already provide models in CIM exported from their systems Lessons learned: Testing with real data is necessary. IOP test cases cannot fully represent all modelling approaches More complex test models are needed. The role of CIMug and IEC in test models preparation is to be discussed Some vendors introduced post IOP changes which made real interoperability not possible. Off-line IOPs may need to be performed. More strict rules on interoperability are needed to ensure that commercial products are really fully compliant with the Profile  DACF process (Day-Ahead Congestion Forecast) The goal is to complete migration stage by the end of 2010 Test exchanges started on 8 June 2010 and finished in the end of August 2010 Now the second stage of tests for DACF is running. TSOs are exchanging 6 files per day in CIM (one day in a week). The goal is to verify the procedures and test Communication channels. ENTSO-E Roadmap on CIM | Chavdar Ivanov | October 2010 | Page 13 of 16

CIM and ENTSO-E web site ( ENTSO-E Roadmap on CIM | Chavdar Ivanov | October 2010 | Page 14 of 16

ENTSO-E CIM in the CIMug web site ENTSO-E Roadmap on CIM | Chavdar Ivanov | October 2010 | Page 15 of 16

Summary  ENTSO-E TSOs are implementing CIM in order to  improve and harmonize data exchange processes  improve the quality of network analyses Therefore, to ensure fulfillment of ENTSO-E tasks defined by the 3 rd Energy Package the EU  ENTSO-E set up an internal process in order to deals with CIM issues  ENTSO-E would like to base its profiles on the IEC CIM Standards. This will be possible only if CIM is developed following clear roadmap that avoids major changes of already implemented classes.  ENTSO-E will not be able to follow yearly updates on regular basis. Therefore changes in ENTSO-E Profile and IEC Standards will be carefully analyzed and applied in accordance with ENTSO-E needs.  ENTSO-E will actively participate in the CIM development process by providing technical expertise and a platform to demonstrate interoperability (IOPs covering WG13 and WG16 topics) ENTSO-E Roadmap on CIM | Chavdar Ivanov | October 2010 | Page 16 of 16