11 Why BPA Transmission Customers Aggregate Reservations Feb. 20, 2013.

Slides:



Advertisements
Similar presentations
11 OASIS Subcommittee - Notification Task Force UPDATE May
Advertisements

Lottery Method in BPA’s Simultaneous Submission Windows and Potential Application to the Simultaneous Defender Matching Process NAESB Meeting 05/01/13.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
NAESB Coordinate Interchange
NAESB OASIS 1A Subcommittee Wendy Weathers, Chair ESS Meeting May 2005 Resale Recommendation.
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
NAESB Coordinate Interchange Standard, Version 1 / 0
Load Responsibility in the NWPP Footprint
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Presented to the WECC MIC June 15, 2007
FERC Order minute Scheduling.
Resales and the Northwest Market A High Level Preview presented by Pacific Northwest Customers*
Oasis Overview. 2 OASIS Overview What is OASIS? S –Open Access Same Time Information System –Electronic site for transmitting utility information to customers.
WELCOME Western Area Power Administration1. Where did the journey begin? Western Area Power Administration2.
OASIS Subcommittee Status EC Meeting 2/18/14. Preemption and Competition Annual Plan Items Affected 2013 AP Item 2(a) Develop version 2 business practice.
EC Meeting 2/24/ AP Item 7(b) Modify NAESB standards WEQ , WEQ , and related standards to be consistent with the Commission’s policy.
Treatment of Firm Redirects Recent FERC Order. Entergy Order Docket Nos. ER OA ER Issued May 16, 2013
Pseudo-Tie Reservations
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Pre-Decisional. For Discussion Purposes Only.September 10, 2014 Southern Intertie Discussion.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
BCTC Customer Consultation on Loss Compensation Service January 15, 2007.
Network Economy System Overview and Demonstration May 3, 2007 Raj Hundal.
BPA FY 2003 Financial Condition Update: Liquidity Tools to Bridge the Gap Confidential – Sensitive Information BPA has a number of liquidity tools to bridge.
Introduction to Bonneville Power Administration
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N WIAB WECC Interchange Authority Backup BY LOU MIRANDA BONNEVILLE POWER ADMINISTRATION TRANSMISSION.
Reserves Issue For years there has been disagreement over reserves issues and what constitutes firm power. We’ve been able to function as a market, despite.
DRAFT Request for Initiation of a NAESB Standard NAESB OS Oct 23-24, 2013 Richmond, VA.
MOD Customer Information Session September 10, 2010.
Short-Term Competitions and Preemption.  Overview  Standards being covered are:  Motion 2 - Fixed Capacity Over Term of Request. ▪ Tier 1 Service –
Resale Business Practice Standards 3 Options remain.
Short-term Competition and Preemption (STCP) May 2015 Presenter: Marie Pompel Bonneville Power Administration.
OASIS Insights & Observations Transmission Customer Forum September 21-22, 2006 Jim Viikinsalo September 21-22, 2006 Jim Viikinsalo.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BP-14 Transmission Pre-Rate Case August 8, 2012.
Generation Inputs Workshop July 24, BPA Balancing Authority Reliability Tool.
Large Generator Interconnection Procedures Reform Stakeholder Meeting February 19, 2009.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Motions – Amend Due Dates for the NAESB OS 2013 Annual Plan (AP) November 21, 2012.
Flowgate Allocation Option Parallel Flow Visualization Business Practices Subcommittee Meeting June , 2010.
Improving Access to the Federal Columbia River Transmission System: The IPP Perspective NIPPC September 8, 2005 Stephen Hall Partner Stoel Rives, LLP.
Illustrative FCRPS Examples Comparing Capacity Adequacy Calculations for Federal Hydro- Dominated System Mary Johannis PNW Resource Adequacy Technical.
E-Tag Notification Assignment NAESB OS Sep 17-19, 2013 Seattle, WA Assignee – Robin Cross Seattle City Light Interested Resources: Marie Pompel - BPA Power.
Market Operations and Development (MOD) System Upgrade Project Customer Information Session #2 April 9, 2010.
Resale Business Practice Standards 3 Options remain.
NITS Concepts  Contract Data Model: NITS Agreement represented as a Contract Contract has one or more Facilities Facility may be one or more Resources.
OASIS SUBCOMMITTEE STATUS EC Meeting 4/29/14. Preemption and Competition Annual Plan Items Affected  2013 AP Item 2(a) Develop version 2 business practice.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Resales, Aggregations & Redirects of Resales NAESB OS Presentation August 20, 2014 BPA Presenting.
PJM© Demand Response in PJM 2009 NASUCA Mid-Year Meeting June 30, 2009 Boston, MA Panel: Price Responsive Demand – A Long-Term Bargain.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Wednesday, January 28, :00 to 3:00 p.m. ET.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Capacity Reassignments, Aggregation & Redirects of Reassignments NAESB OS – May 13th, 2014 BPA.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
2013 Wind Conference. Transmission Service Study Process Steve Purdy.
NAESB WEQ EC Meeting 10/20/2015.   Workload  Long-Term Competition for Rollover Rights OASIS Subcommittee.
NAESB BPS Yasser Bahbaz– IDCWG Chair January 5 th, 2016.
NITS on webSmart OASIS. NITS on webSmart OASIS Agenda  Company and User Permissions  Electronic Industry Registry requirement  WebSmart OASIS NITS.
Overview of the Contract Carriage Gas Markets in Eastern Australia James Mellsop Director 4 December 2012 Presentation to PEA.
NAESB NITS, and Long-term Competition
OASIS II Stage 1 Requirements Joint OASISII Implementation Task Force Paul R. Sorenson November 17, 2004.
WEQ OASIS Subcommittee
Transmission Outage Coordination
ColumbiaGrid Summary of: COI Utilization Report dated May 4, 2011
OASIS II Stage 1 Requirements Joint OASISII Implementation Task Force Paul R. Sorenson November 17, 2004.
Pseudo-tie business procedure
Add/Terminate NITS DNR
Duke Energy Carolinas Quarterly Stakeholder Meeting
Two-Tier Firm Curtailment Overview
NITS on webSmart OASIS.
WIAB WECC Interchange Authority Backup
Assigned to the WEQ OASIS and BPS Subcommittees
Pseudo-tie business procedure
Presentation transcript:

11 Why BPA Transmission Customers Aggregate Reservations Feb. 20, 2013

22 Overview The purpose of this presentation is to share the need for the aggregation feature within OASIS (currently “resale to self”). BPAT requires e-tags for PTP deliveries which identify generation source to load sink, and the type of transmission. To facilitate e-tag simplicity, BPAP and other BPAT customers “aggregate” multiple long-term reservations with like scheduling POR/POD (enables LT PTP transmission from a “system sale”). Short-term reservations can also be aggregated, but do not have the multiple reservation issue to the extent of long-term reservations from a system sale perspective. BPAP and other customers use the “resale to self” functionality in OASIS to aggregate these types of reservations. There is no resale involved. BPAT customers aggregate reservations in order to make scheduling less onerous, potentially avoiding unnecessary delays to submission of schedules. Specifically, to manage scheduling and reservations (redirects).

33 Federal Power is a System Sale Federal Columbia River Power System (FCRPS) is made up of over 30 hydro projects and CGS. BPAP sells federal power as a system sale. FCRPS is operated in a coordinated manner to enable power sales. In other words, generation is not scheduled individually. “BPAPower” is the POR that represents the FCRPS.

4 Power Sale BPAT requires the Contractual POR (Source field of TSR) and POD (Sink field of TSR) information for granularity when requesting long-term PTP transmission service. Information on the Contractual POR for the long- term PTP transmission request is provided by BPAP, and is to support the customer’s power purchase from BPAP. Every long-term BPAP system sale has its own reservation and may then be aggregated into short- term reservations with like POR/POD and duration.

5 Aggregation Through Resale NAESB S&CPs (v. 2.1) The NAESB standard allows for aggregation: With the exception of reservations subject to a Conditional Curtailment Option*, the Reseller shall have the right to aggregate multiple reservations into a single Resale provided that each reservation being aggregated is of exactly the same service attribute, priority, product and point of receipt/point of delivery. Long-term Firm Point-to-Point reservations or any other reservations subject to the terms of a Conditional Curtailment Option may not be aggregated to support a Resale. *Conditional Curtailment Option is a type of long-term firm PTP, and not related to STCP.

66 Multiple Reservations associated with a long-term PTP request BPAP has several groups of reservations with like POR/POD and Start/Stop. These groups of reservations were in response to a single request (have identical Start/Stop, and Queue times).

7 Multiple Reservations associated with a long-term PTP request The 14 different Source items roll up to the “BPAPower” POR. The 3 different Sink items roll up to the “BC.US.Border” POD. The total contracted capacity is 643 MW, even though the sum of each of these reservation far exceeds that amount.

8 Single aggregated short-term reservation In order to simplify reservation management and scheduling, each of these long-term reservations with like POR/POD are aggregated to a single, short-term firm reservation of like duration. For scheduling and reservation purposes, the POR and POD of the reservation is used. Resale to self, or Aggregate

9 Volume of BPAP transmission reservations BPAP currently has over 60 reservations for just four POR/POD paths. More than half of those reservations are of MW capacity of 10 MW of less. BPAP balances those reservations among those four paths, so may need to redirect.

10 Why are there so many reservations to manage? Active Market Hubs: The Pacific Northwest has several active power trading hubs. Other areas (such as the Eastern Interconnection) do not appear to have active market hubs, and rely on bilateral transactions between BAA’s to support unanticipated shortfalls (occurs in very moderate amounts). BPA and WECC have many more transactions between multiple entities every day. E-tags for deliveries must reflect the appropriate POR/POD combination.

11 Why are there so many reservations to manage? BPAT transmission business model: BPA preference customers that are in the BPA BAA (or use a portion of it) hold their own BPAT transmission contract (PTP or NT). PTP customers that deliver power over BPA system must schedule it (even if the generation and load is within the BA). There is also an active secondary transmission market, which requires OASIS modifications to enable the transactions.