Assigned to the WEQ OASIS and BPS Subcommittees

Similar presentations


Presentation on theme: "Assigned to the WEQ OASIS and BPS Subcommittees"— Presentation transcript:

1 Assigned to the WEQ OASIS and BPS Subcommittees
2018 Annual Plan Items Assigned to the WEQ OASIS and BPS Subcommittees

2 History of Major Work Efforts
BPS Parallel Flow Visualization ATC calculations OASIS NITS on OASIS Service Across Multiple Transmission Systems Preemption and Competition Long-Term Competition PTP Rollover Rights 8/21/2018

3 2018 API Summary 2018 API # Assigned Description Target (April WEQ EC) Projected or Actual 2ai1 OS/BPS Paragraph 1627 of Order 890 – Posting of additional information on OASIS regarding firm transmission curtailments 4Q 2018 1st Qtr. 2019 3a OS Requirements for OASIS to use data in the Electric Industry Registry TBD 3b Evaluate the ability to define specific lists to be submitted for the Query/Response in the OASIS Template format and develop new standards/modifications as needed 4th Qtr 2018 2nd Qtr. 2018 3c Evaluate adding dynamic notification (PTP only) for the rollover rights renewal deadline and develop new standards/modifications as needed 3rd Qtr 2018 4th Qtrs. 2018 3d Review the NAESB Network Integration Transmission Service (NITS) Business and Technical Standards for needed modifications based on implementation and operational experiences since their adoption. Areas of investigation should include, but are not limited to... 2019 3e Develop new OASIS Business Practice Standards to ensure that reservation capacity that is assigned to untagged Pseudo-Ties is preserved for that purpose.  3f Evaluate the need for new OASIS Business Practice Standards and/or mechanisms to allow documentation for coordination of partial path reservations to demonstrate the complete path associated with long-term firm interchange. This information, when populated, would provide a tool to improve coordination of interchange by transmission planners when developing planning models. This will provide greater certainty that partial path reservations are properly accounted for in transmission planning models and that reliable service is provided. 8/21/2018

4 Posting of additional curtailment information on OASIS
2018 Annual Plan Item 2ai1 Posting of additional curtailment information on OASIS

5 API 2ai1 FERC initiated in Order 890 Assigned jointly to OASIS and BPS
BPS worked initially to identify scope and data availability BPS and OASIS have refined the scope in light of OASIS templates that exist and have begun work to identify additional template structures and Business Practice Standards OASIS subcommittee work was delayed while working through other critical Business Practice Standards development. 8/21/2018

6 API 2ai1 FERC Initiated in Order 890 P. 1627
We agree with suggestions for the posting of additional curtailment information on OASIS and, therefore, require transmission providers, working through NAESB, to develop a detailed template for the posting of additional information on OASIS regarding firm transmission curtailments. Transmission providers need not implement this new OASIS functionality and any related business practices until NAESB develops appropriate standards. These postings must include all circumstances and events contributing to the need for a firm service curtailment, specific services and customers curtailed (including the transmission provider’s own retail loads), and the duration of the curtailment. 8/21/2018

7 API 2ai1 P …our requirement that OASIS templates for curtailment information be developed that will report occurrences of all levels of TLRs. This will enable the Commission and customers to monitor TLR patterns and frequency... 8/21/2018

8 API 2ai1 P 1629 …Transmission providers should continue to use the OASIS Schedule Details template to post information on the scheduled uses of the transmission system and any curtailments and interruption thereof… 8/21/2018

9 API 2ai1 Current Work Effort
Focus on interconnection-wide curtailments List of data available through TLR information in Eastern Interconnection List of data available through ECC information in the Western Interconnection Progress underway in developing NAESB Business Practice Standards 8/21/2018

10 API 2ai1 Current Work Effort (continued)
Data must be provided by outside agencies (EIDSN & ECC) Questions about whether data will be provided by agencies for public dissemination Data elements identified for Eastern Interconnection Expect that similar information is available for Western Interconnection 8/21/2018

11 API 2ai1 Current Work Effort (continued)
Informal discussions by OASIS members with IDC Working Group and ECC to identify options Verify that data exists. (Are we asking for something that can’t be provided?) Can desired data be delivered? If so, how can it be delivered? Will organizations provide the data? (confidentiality question) How soon could the other organizations provide the information after FERC orders it? Outside organizations provide info in an appropriate structure? 8/21/2018

12 API 2ai1 Next Steps Finalize list of information to be posted
There may be differences between Eastern and Western Interconnections Determine mechanism for making data available for posting Identify reasonable time to implement Finalize OASIS Business Practice Standards (WEQ- 000, 001, 002, 003 and 013) Prepare recommendation 8/21/2018