WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,

Slides:



Advertisements
Similar presentations
EuroNu CERN February 5, 2008 Marco Zito Super-Beam work package Marco Zito Dapnia-Saclay On behalf of the SB w2 team EuroNu 5/2/2008 Thanks to M. Dracos.
Advertisements

HARP Anselmo Cervera Villanueva University of Geneva (Switzerland) K2K Neutrino CH Meeting Neuchâtel, June 21-22, 2004.
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
Near Detector Working Group for ISS Neutrino Factory Scoping Study Meeting 24 January 2006 Paul Soler University of Glasgow/RAL.
ISS phone meeting 8 dec Alain Blondel ISS detector study Convener Alain BlondelAlain.
ISS-4 22 August IRVINE Alain Blondel NEUtrino DETectors N-EU-DET 4-years working plan for Neutrino Detector R&D to take place in ~ objectives.
Alain Blondel CHIPP Neutrino meeting NEUCHATEL June 2004.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
K.T. McDonald March 18, 2010 LArTPC BNL 1 Magnetizing a Large Liquid Argon Detector Kirk T. McDonald Princeton University (March 18, 2010)
Neutrino physics: experiments and infrastructure Anselmo Cervera Villanueva Université de Genève Orsay, 31/01/06.
Segmented magnetised detectors Anselmo Cervera Villanueva Universidad de Valencia ISS meeting RAL (UK) 25/04/06 RAL (UK) 25/04/06.
Neutrino detectors for the future Neutrino Facility global numbers : next project ~ 600 M€ (NB NOvA, T2K = 200M$, OPERA=100MCHF, etc...) community between.
Neutrino Factory Detector R&D BENE Meeting 5 July 2006 Paul Soler University of Glasgow.
SG Det IA 2007 oct29 Alain Blondel ECFA study groups BENE (in CARE) Int'l Scoping Study (ISS) Steering group (EU): A.Blondel (Geneva) P.Soler (Glasgow)
Preliminary Ideas for a Near Detector at a Neutrino Factory Neutrino Factory Scoping Study Meeting 23 September 2005 Paul Soler University of Glasgow/RAL.
INDIA-BASED NEUTRINO OBSERVATORY (INO) STATUS REPORT Naba K Mondal Tata Institute of Fundamental Research Mumbai, India NUFACT Scoping Study Meeting at.
Main Questions for Neutrino Detector R&D EUDET Neutrino Group Meeting 4 December 2007 Paul Soler University of Glasgow.
Summary Near Detector at IDS Meeting in FNAL EuroNu Annual General Meeting, Strasbourg 3 June 2010 Paul Soler.
International Design Study for the Neutrino Factory The IDS-NF K. Long, 16 March, 2008.
Scoping study p-ECFA Alain Blondel ISS-detectors Introduction: working group plans, organization and aims of the meeting.
Paul Soler University of Glasgow MICE as a Step towards Cool Muon Beams for Particle Physics MICE Celebration Event RAL, 25 June 2015.
Summary Detector Working Group Neutrino Factory International Design Study Meeting 17 January 2008 Paul Soler.
European design study on Neutrinofacilities - Euronu within FP7.
Large Magnetic Calorimeters Anselmo Cervera Villanueva University of Geneva (Switzerland) in a Nufact Nufact04 (Osaka, 1/8/2004)
UK involvement in Neutrino Factory Detector R&D UK Neutrino Factory Meeting 3 May 2006 Paul Soler University of Glasgow.
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
Activities relevant to Neutrinos in the UK Alfons Weber Oxford/RAL Durham, 11-Mar-2011.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
Alain Blondel. AIDA-Neutrino meeting AIDA Neutrino detector studies 1. News from the neutrino scene 2. Beam requirements for AIDA 3. Discuss.
Neutrino Detector R&D UKNF Detector Meeting 25 April 2007 Paul Soler University of Glasgow.
Near Detector Report International Scoping Study Detector Meeting 4 July 2006 Paul Soler University of Glasgow.
O R&D programme to test detector concepts being developed for neutrino factory: wrong sign muon “Golden” signature R&D Programme MIND & TASD 15 m 100 m.
Near Detector Flux and R&D Near Detector Flux and R&D International Scoping Study Meeting 27 April 2005 Paul Soler University of Glasgow.
The ISS Peter Dornan Imperial College London. 16 March 2006P Dornan - MUTAC `atmospheric’`solar’ `cross/reactor’ Oscillation defined by 3 mixing.
How to extract Neutrino Factory flux from IMD and neutrino elastic scattering? Near Detector Workshop, CERN, 30 July 2011 Paul Soler.
International Design Study for the Neutrino Factory The IDS-NF K. Long, 8 th April 2008.
Physics and Performance Evaluation Group NuFact 07 Okayama University, Japan August 6, 2007 Walter Winter Universität Würzburg for the executive committee:
Neutrino Detector R&D International Scoping Study UC Irvine 21 August 2006 Paul Soler University of Glasgow.
27 Apr 2006P J Dornan - ISS3 - RAL Next Meeting 4 th ISS Plenary –Irvine Aug21, 22 (NUFACT06 Aug 24 – 30) Workshops –Physics Group, June, Valencia –Machine.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
EUROnu WP5 Detector Costing EuroNu Annual General Meeting, Strasbourg 3 June 2010 Paul Soler.
Neutrino detector IA request Lines of thought first meeting on 24 August 2007 on- the fly notes by AB present: Alain Blondel, André Rubbia, Anselmo Cervera,
Detector possibilities: scintillator based detectors EUCARD 1 st Annual Meeting, RAL, 13 April 2010 Paul Soler.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
1 Neutrino detector test beam requirements 0. Disclaimer 1. News from the neutrino scene 2. Beam requirements for AIDA and others.
1 Performance of a Magnetised Scintillating Detector for a Neutrino Factory Scoping Study Meeting U.C. Irvine Monday 21 st August 2006 M. Ellis & A. Bross.
BENE MECC detector Pasquale Migliozzi INFN – Napoli.
Neutrino detector IA request Lines of thought first meeting on 24 August 2007 on- the fly notes by AB present: Alain Blondel, André Rubbia, Anselmo Cervera,
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe History Aims Structure Some admin Rest of the meeting.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
MIND Systematic Errors EuroNu Meeting, RAL 18 January 2010 Paul Soler.
Detector: Status and Plans 6 th IDS-NF Meeting, RAL, 22 September 2010 Paul Soler.
A. Blondel WP 4.7 LAGUNA_LBNO LARG+ND meeting Near detector for CN2PY -- discussion What is needed? What does it take? Ideas…
Near Detector Tasks EuroNu Meeting, CERN 26 March 2009 Paul Soler.
LBNO Near detector task force LAGUNA-LBNO FP7 WP 4.7 Plenary meeting Hamburg
EUROnu Review: 14 th April 2011 EUROnu Introduction and Objectives Neutrino oscillations: much interest since 1 st paper in extension required to.
Detector R&D for Future Neutrino Oscillation Facilities (Solid Detectors) NUFACT08 Valencia, Spain 30 June 2008 Paul Soler.
Final Results from IDS-NF Study NUFACT14 Workshop, Glasgow on behalf of the IDS-NF Collaboration Paul Soler, 26 August 2014.
SPSC recommendations [Installation at PS-T9] Baby MIND weekly meeting 28 th October 2015.
Neutrino factory near detector simulation
EURONu Collaboration Board,
Detector Working Group: review of progress, issues to be addressed
Alain Blondel. LAGUNA meeting CERN 3-5 March 2011
Detector Baseline EuroNu Meeting, RAL 20 January 2010 Paul Soler.
Alain Blondel 11 October 2010 GDR NEU2012 summary
European Detector R&D: AIDA
Neutrino Oscillation Physics with a Neutrino Factory
A High Intensity Neutrino Oscillation Facility in Europe
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva, IFIC Valencia

2 EuroNu Launch Meeting CERN 5 February 2008 Aims of WP5 o Define the baseline detector options needed to deliver the physics for each of the neutrino facilities. o Priorities include baseline detector options from ISS –Magnetised Iron Neutrino Detector (MIND) for the golden channel at a Neutrino Factory, –Water Cherenkov detector for the Super-Beam and Beta Beam facilities –Performance of a near detector at each of the facilities for absolute flux normalisation, measurement of differential cross sections and detector backgrounds. o Desirable studies: extensions to the baseline options –Totally Active Scintillator Detector (TASD) and Emulsion Detectors for the platinum and silver channels –Define beam instrumentation and shielding requirements for the near detector.

3 EuroNu Launch Meeting CERN 5 February 2008 Tasks of WP5 1.Coordination task: Leading the task, with responsibility for the coordination work 2.MIND task: Simulation of the magnetic iron neutrino detector (MIND), Neutrino Factory baseline from ISS, including implementation of a toroidal field, optimisation of the geometry, event selection, efficiency as a function of threshold, background evaluation and cost estimate iron (4 cm) scintillators/RPCs (1cm) beam 100 m 14 m B=1 T 1cm transverse resolution M~100 KTon

4 EuroNu Launch Meeting CERN 5 February 2008 Tasks of WP5 3.Water Cherenkov task: Define performance of water Cherenkov detectors for Super-Beam and Beta Beams, including efficiency as a function of threshold and background, and cost estimate 65m Water Cerenkov modules at Fréjus Memphys ~440 kton Fréjus CERN 130km

5 EuroNu Launch Meeting CERN 5 February 2008 Tasks of WP5 Muon chambers EM calorimeter Hadronic Calorimeter 4.Near detector task: Design for the near detector in order to measure the absolute flux normalisation, differential neutrino cross sections, backgrounds to the far detector, and cost estimate

6 EuroNu Launch Meeting CERN 5 February 2008 Institutions o Univ. of Glasgow: 36 person-months –Coordination WP5 –MIND task –Near detector task o IFIC (CSIC & Univ. Valencia): 47 person-months –MIND task o CNRS (Paris APC): 44 person-months –Water Cherenkov task o Univ of Sofia: 55 person-months –Near detector task o Additional partners: access to travel money –Univ. Geneva: beam diagnostics Neutrino Factory –Fermilab: TASD

7 EuroNu Launch Meeting CERN 5 February 2008 Deliverables WP5 o Deliverables and milestones (brief description and month of delivery) –D3: Report on the detector performance of baseline scenarios, 12 months –D9: Contribution to the Interim report (all WP). It will summarize the detector potential of the revised baseline scenarios, including systematic errors (near and far detectors), 24 months –D13: Project review documentation (all WP), 36 months –D16: Report on the detector optimization of the near and far detectors, choice of baseline detectors and first estimate of cost, 36 months –Comparison detector performance for all facilities, 40 months –D21: Contribution to the final report, 46 months.

8 EuroNu Launch Meeting CERN 5 February 2008 Synergy with IDS Neutrino Factory o IDS Neutrino Factory meeting at RAL on 16 January: –Defined MIND + TASD tasks: Need full simulation/reconstruction with proper Event Simulator, event transport (GEANT4), digitisation, pattern recognition and recosntruction. Questions: backgrounds, efficiency, parameters to be optimised? Prototyping programme (DEVDET?) in parallel to validate simulations –Near Detector Tasks: Simulation of near detector and optimisation of layout (vertex detector, tracker, magnet, other sub-detectors) Flux determination with inverse muon decays, etc. Analysis of charm using near detector Determination of systematic error from near/far extrapolation Expectation of cross-section measurements Test beam and prototypes to validate technology (eg. vertex detectors) Other physics studies: PDFs, etc. (engage with theory community for interesting measurements

9 EuroNu Launch Meeting CERN 5 February 2008 Meetings o Aim to organise joint meetings as much as possible o Make Neutrino Factory IDS meetings coincide with EuroNu meetings and workshops o Need to organise at least one workshop to kick-start Work Package 5 before NUFACT08: coordination with IDS-NF o Search for further synergies for water Cherenkov task: –Synergy with Laguna –Synergy with active water Cherenkov detectors (ie. SuperKamiokande, T2K …) –Synergy with other MegaTonne water Cherenkov groups around the world (UNO, HyperKamiokande) –Share expertise and share simulations??