1 GEPCO 2 nd WORKSHOP ON POWER SECTOR REFORMS November 11 & 12, 2010.

Slides:



Advertisements
Similar presentations
Evaluating Front Office Operations
Advertisements

April 27, 2009, Atlas Copco Group Q1 Results April 27, 2009.
Atlas Copco Group Q4 Results February 2, Q4 - highlights  Order growth continued  Record operating profit –All business areas above 20% operating.
Slide 1 Leveraging GIS to improve efficiencies and reduce costs at North Delhi Power Ltd Arup Ghosh Chief Technical Officer North Delhi Power Ltd (Joint.
FUTURE NTDC PROJECTS UPTO
Presentation on ELECTRICITY DISTRIBUTION LOSSES & CONCEPT OF AGGREGATE TECHNICAL AND COMMERCIAL (AT&C) LOSS R.V. Shahi Former Power Secretary, Govt.
PAKISTAN POWER SECTOR BACK-GROUND, PRESENT SITUATION & FUTURE PLANS.
Overview of tariff revision process under Regulatory Commission Prayas - EGI Skill-share workshop for Tajikistan and Kyrgyzstan Delegates November 16-18,
Previous Efforts in the Electricity Sector to Improve Energy Efficiency On Supply Side  Maximum use of natural gas.  Increase of generation efficiency.
1 RESTRUCTURED APDRP-II IN XI PLAN Scope of Part - B :  Strengthening of Distribution System. Fund Allocation of Part - B:  Proposed fund allocation.
SR #. NAME OF NEW SUBSTATIONS T/F CAP. (MVA) ASSOCIATED TRANSMISSION LINES ESTIMATE D COST* (Rs.in Million) Eqt. US$ in Million REQUIRED YEAR OF COMMISSIO-
NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP
Income Statements. Income Statement One of four financial statements issued by a business Reports the amount a company has earned between 2 balance sheet.
FUTURE NTDC PROJECTS UPTO
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED QUARTERLY REPORT ON FUTURE NTDC PROJECTS UPTO For The Quarter Ending Dec.2012 PLANNING POWER.
Financial Accounting, Seventh Edition
Lahore Electric Supply Company Limited 2 nd Workshop on Power Sector Reforms 11 th & 12 th November | 2010 WAPDA House Auditorium Lahore.
1 PRESIDENTIAL ADDRESS by Shri B K Das Chairperson, OERC
Energy & Environment Initiatives. 2 Technology Finance Group Supports demonstration projects & activities creating awareness The demonstration projects.
NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012.
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
Cost of Service Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker.
Power Line Carrier Communication based Automated Meter Reading System
1 Resurrecting A Load Research Program Susan Romer NSTAR 2006 AEIC Load Research Conference September 2006.
Akshay Prakash Yojana A Voluntary DSM Initiative November 2005 
Presenter: Peter Busch
Technical Conference on Net Metering Load Research Study November 5, 2014.
Future Jordan Virtual Power Plant EEEMF Jordan 2015 Energy Economy & Energy Management Forum For Mena & Fourth Renewable Energy National Dialogue –Amman.
5 - 1 ©2002 Prentice Hall, Inc. Business Publishing Accounting, 5/E Horngren/Harrison/Bamber Merchandising Operations and the Accounting Cycle Chapter.
Case Study on Loss Manegement in Brazilian Utilities Marcos Aurélio Madureira da Silva Corporate Commercial Director Sistema Cataguazes-Leopoldina
Financial Management for Senior Public Sector Officials Group 4 Final Course Project Preparation on PESCO (Sub-Project) Energy Loss Reduction Presenters:
Lecture 14 Accounting Cycle solving problem Task Force Image Gallery clip art included in this electronic presentation is used with the permission of NVTech.
Page No. 1. Page No. 2 PRESENTATIONTO PAKISTAN IPO SUMMIT ON 31 ST JANUARY 2014 AT KARACHI PRESENTATIONTO PAKISTAN IPO SUMMIT ON 31 ST JANUARY 2014 AT.
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
Theft in Domestic and Commercial sectors 1Non-metering for want of meters, resulting in arbitrarily assessed consumption 2Tampering of meters 3Wrong recording.
Analysis of ARR & Tariff Proposal of SOUTHCO for FY February 10, 2011 By World Institute of Sustainable Energy (Consumer Counsel)
1 PRESENTATION ON Financial Issues & Business Plan FY 2011 PAKISTAN POWER SECTOR.
1 11 th -12 th November, nd WORKSHOP ON “POWER SECTOR REFORMS”
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED QUARTERLY REPORT ON FUTURE NTDC PROJECTS UPTO For The Quarter Ending March, 2013 PLANNING POWER.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA 11 th Aug 2014 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
1 Conference Call 1Q12.  Reduction of 1.8% in consumption compared to 1Q11, mainly influenced by the residential class, due to lower temperature in the.
Quarterly Performance Report For the period October – December 2014.
Analysis of ARR & Tariff Proposal of NESCO for FY February 09, 2011 By World Institute of Sustainable Energy (Consumer Counsel)
Mary Ann Woodson National Credit Union Administration Office of the Chief Financial Officer NCUSIF Quarterly Statistics March 31, 2008.
Lecture 15 Accounting Cycle Practice questions
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Benchmarking Objectives & Practices as Applied by NRECA International Daniel Waddle NRECA International March 8, 2006 World Bank Energy Forum.
1 POWER FOR ALL. 2 POWER TO ALL WBSEDCL - Overview Consumers151 Lakhs Peak Demand 5, 586 MW Energy Handled 38, 110 MU Total Revenue Rs.19,583Cr Number.
1 REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA April-2014 RESTRUCTURED ACCELERATED POWER DEVELOPMENT AND REFORMS PROGRAMME (R-APDRP)
Electricity Sector April Electricity sector in perspective Electrification of households is one of Government’s priority programmes The country.
OFD Fire-Based OFD Fire-Based EMS Transport. OFD Transport Timeline OFD TRANSITION TO FULL ALS & AUTO ACCIDENTS 90 DAY BILLING COLLECTION LAG TIME BEGIN.
Smart Grids and Meters Workshop November 2015 بسم الله الرحمن الرحيم Electricity Loss Sudan - Khartoum The Arab Union of Electricity (AUE) The Sudanese.
NATIONAL TRANSMISSION AND DESPATCH COMPANY LIMITED PLANNING POWER DEPARTMENT MONTHLY REPORT ON NTDC DEVELOPMENT PROJECTS PLANNING POWER May, 2012.
NTDC ONGOING DEVELOPMENT PROJECT SR. NO. NAME OF SUBSTATIONS TRANSFORMER CAPACITY (MVA) ASSOCIATED TRANSMISSION LINES EXPECTED COMMISSIONING 1 Ext. at.
Cedar Sinai Park FY 2015 Financial Report and FY2016 Budget Report Sandra C. Simon, Chief Operating Officer Bobbie J. Jenkins, Chief Financial Officer.
1 EASTERN MUNICIPAL WATER DISTRICT Fiscal Year 2015 / 16 First Quarter Enterprise Performance Measures Update John Ward Director of Engineering.
1 Proposed Performance Tracker for PSC Working Group 1 of 3 CategoryMetricResults Project Costs Cost to Deploy: Capital vs total Capital deployment cost.
Advanced Financial Accounting
Portugal Cove - St. Philip’s
Narragansett Electric Rate Classes
Transmission and Distribution Loss Study
Types of Receivables Amounts due from individuals and other companies that are expected to be collected in cash. Amounts due from customers resulting from.
Apua workshop-ABIDJAN, 9 TO 10TH November, 2017
City of Lebanon, Missouri Electric Department
Yangon Region Rural electrification plan
ENCLAVE POWER COMPANY LIMITED
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Island Energy Advisory Committee Board
REVIEW OF RAPDRP PART A PROGRESS IN KARNATAKA 28-July-2014
RAPDRP PART A IN KARNATAKA 25th Aug 2014
Presentation transcript:

1 GEPCO 2 nd WORKSHOP ON POWER SECTOR REFORMS November 11 & 12, 2010

22 Dist.Sargodha

3 MULTAN M/GARH ROUSCH P/H 500KV G/S GATTI 500KV G/S LAHORE (SHEIKHUPRA) 500KV G/S NEW GHAKHAR (NOKHAR) 500KV G/S RAWAT GHAZI BROTHA P/HOUSE TARBELA P/HOUSE 500KV G/S SH: MOHAMMADI PESHAWAR 500KV GRIDS & TRANSMISSION LINES

4 REWAT-1 GEPCO NTDC SOURCES 500KV GSS GHAKHAR(NOKHAR) 03 No. 600MVA, 500/220KV POWER T/Fs 03 No. 160MVA (EACH) 220/132KV POWER T/Fs LAHORE (Shp) 500KV CIRCUITS HAFIZABAD 220KV GSS GHAKHAR 04 No. 160MVA, 220/132KV POWER T/Fs 132KV GSS FATEHPUR MANGLAGHAKHAR 220KV CIRCUITS 132KV CIRCUITS FUTURE SHAHEENABAD-1 SHAHEENABAD-2 HAFIZABAD AROOP-1 AROOP-2 GRW CANTT AWAN CHOWK GRW Q.D. SINGH MANGLA 220KV CIRCUITS 220KV GSS SAHUWALA(SIALKOT) 03 No. 160MVA, 220/132KV POWER T/Fs 220KV CIRCUITS NEW SIALKOT 132KV GSS DASKA IND. GUJRAT-1 132KV GSS WAZIRABAD 132KV GSS SAMBRIAL 220KV GSS K.S KAKU 03 No. 160MVA, 220/132KV POWER T/Fs GHUINKI KOLI LOHARAN P/ROAD SIALKOT THERI SANSI KAMOKI BADHOMALHI VIA NARANG MANGLA RAVI GATT-1 BAND ROAD REWAT-2 MANGLA 132KV CIRCUITS RAWAT MANGLA Note:- 225 MW HUBCO (Narowal) Power House is expected in circuit during Nov-2010 to Mar It will give relief to 220KV Sahuwala & 220KV Kala Shah Kaku G/Stations. 425 MW Nandipur Power House is expected circuit during Dec-2010 to Mar It will give relief to 220KV Ghakhar G/Station Hence there will be no constraint on 220/132 KV system in GEPCO.

5 As on  Grid Stations 500/220/132/11KV Grid01 No 220/132/11KV Grids02 Nos 132/11 KV Grids41 Nos 66/11 KV Grids08 Nos Total 52 Nos  Power Transformers *124 (2870 MVA) * 4 No P.T/Fs 132/66 KV not included  Secondary Transmission Lines 132 KV Lines (Circuit Wise) 1669 KM 66 KV Lines (Circuit Wise) 335 KM Total2004 KM  Distribution Lines 11 KV or HT Feeders625 Nos Length of HT Lines19870 KM Length of LT Lines16801 KM  Distribution Transformers48799 Nos (3027 MVA) GEPCO SECONDARY TRANSMISSION AND DISTRIBUTION SYSTEM

GEPCO FIELD FORMATIONS Sr. No. FormationCircleDivision Sub- Division Total 1G.S.C1247 2G.S.O Project Construction Operation Computer Center3--3 6Technical Services (M&T)14-5 7Civil Works-145 8R.Os-23- 9Regional/ Field Store 1 No. Regional Store 08 Nos. Field Stores 9 Total OfficersSanctioned-399/Actual OfficialsSanctioned-15,921/Actual-13,400 6

7 GEPCO CUSTOMER PROFILE ENDING 09/2010. Category Number of Customers % Customers % Consumption % Revenue Domestic2,116, Commercial272, Industrial50, Bulk T/Wells34, Others Total2,474,878100

8 COMPANY STATISTICS & PROJECTIONS FY 08*FY 09*FY 10*FY 11FY 12FY 13 Consumers, No.2,282,0842,356,3052,454,254 2,556,351 2,662,6952,773,463 Computed Peak Load, MW 1,5901,7491,813 1,885 1,9602,040 U. Purchased, (GWh)6,8396,6956,9877,5658,3259,160 U. Sold (Gwh)6,0775,9576,2206,7347,4078,148 Losses, % Collection Ratio 1, % AT&C Efficiency SAIFI – 11 KV - 400/230V SAIDI – 11 KV - 400/230V

9 GEPCO PROGRESSIVE DISTRIBUTION LINE LOSSES JUL 2010-SEP 2010 VS JUL 2009-SEP 2009 (11 KV & below system) Period Units (Millions) % Loss % Inc/ Dec ReceivedBilledLost Jul-10 to Sep Jul-09 to Sep OVERALL COMPANY LOSSES (132 KV & below system) Period Units (Millions) % Loss % Inc/ Dec ReceivedBilledLost Jul-10 to Sep Jul-09 to Sep

10 GEPCO ANALYSIS OF PROGRESSIVE BILLING AND COLLECTION JUL 2010-SEP 2010 VS JUL 2009-SEP 2009 (Rs.in Million) Period BillingCollection %Collection of Billing Govt.Pvt.TotalGovt.Pvt.TotalGovt.Pvt.Total Jul-10 to Sep ,61618, ,82817, Jul-09 to Sep ,44813, ,18511, Inc. with Prev. Year Rs.M2275,1685,395395,6435,682 %

KPI Performance Description Target Jul-Sep 2010 Actual Jul-Sep 2010 Weighted score Operational & commercial (40%) Line losses% Collection ratio% Transformer failure ratio% Line failure rate – below 20 min% Line failure rate – above 20 min% Defective meters as % of total% Financial (20%) Cash in transit (monthly avg.) Mn Rs O&M expenses Rs./Kwh Rs

KPI Performance Description Target Jul-Sep 2010 Actual Jul-Sep 2010 Weighted score Capital expenditure (15%) Capitalization – A-90 form Mn Rs Secondary transmission grids Mn Rs Distribution of power Mn Rs Energy loss reduction Mn Rs Rural electrification Mn Rs Customer relation management (5)% New connections No 21,23320, Customer faciliation % Supply complaint resolution % Billing complaint resolution %

KPI Performance Description Target Jul-Sep 2010 Actual Jul-Sep 2010 Weighted score Human resource management (10%) Officers strength – Occupancy % Staff strength – Occupancy % Resolution of disciplinary cases % Settlement of audit paras % Officers training % Staff training Employees safety (10%) No of accidents – fatal No No of accidents – non fatal No TOTAL57.75

14 FUTURE WORK PLAN Sr. No.Name Of Grid Type Proposed Capacity (MVA) Completion Schedule NEW GRID STATIONS 1 Sheranwala Bagh (Gujranwala) GIS New Daska AIS Gohad Pur (Sialkot) Khiali Bye-Pass (Gujranwala) CONVERSION 5 Fateh Pur AIS 52 Completed in Kolo Tarar Jalal Pur Nau A. UNDER ADB LOAN NEW GRID STATIONS 1Old Power House SialkotGIS Chianwali AIS G.T. Road Gujrat Hafizabad Pindi Bhattian Phalia Awan Sharif B. UNDER KOREAN LOAN (EXIM BANK)

15 Achievements & Corporate Goals ActivityPast AchievementsFuture Goals/Objectives Customer service centers Complaint resolution87%90% Defective meter as % of total 0.29%0.20% Theft detection Mwh / Rs. 135 Mn20 Mwh / Rs. 140 Mn Recovery98.61%99.00% Employee safety fatal/non fatal 6/150/0 Training officers/staff10% / 14%25% / 25% Improvement in cash cycle – Cash in transit monthly average Rs MnRs Mn Implementation of ERP including customer care and billing solutions

Financial Summary FY 08*FY 09*FY 10*FY 11FY 12FY13 Unit Summary, Rs/kWh PPP – Unadjusted PPP – Adjusted Distribution Margin Prior Period Adj Total Actual Revenue Variance, Rs/kWh0.11(0.61)(0.30)--- Income Statement Summary, Rs Million Sales Revenue25,98630,32640,07547,60062,96069,258 + GOP Subsidy3,20413,97617,43212, PPP(32,247)(40,264)(50,152)(51,100)(56,195)(61,830) - Operating Expenses(3,521)(4,236)(4,873)(5,526)(6,080)(6,688) + Non-operating Inc.1,2721,4741,4761,4451,5901,750 - Fin. & other Exp.(1,076)(300)(335)(80)(150)(405) = EBT(6,382)9753,6234,8742,1252,085 -Taxes42(541) = Net Income(6,340)4344,1464,8742,1252,085 * Actuals

17