MineralScan Fill Level Signal Examples & Explanations - RNMC Introduction The MineralScan MillSlicer system normally consists of two fixed vibration sensors.

Slides:



Advertisements
Similar presentations
HOW TO DESCRIBE A CHART,GRAPH OR TABLE
Advertisements

Chapter 16 Section 1.
All actions in PADDS begin with setting up the patient.
Why Systolic Architecture ?. Motivation & Introduction We need a high-performance, special-purpose computer system to meet specific application. I/O and.
MineralScan MillSlicer Polar Plot Analysis – Shell Based Vibration Sensor Case 1. Empty Mill w/Excessive RPMs Case 2. Empty Mill w/Good RPMs Case 3. Full.
Chapter 4: Basic Properties of Feedback
Getting Started Product Description Setting Parameters How does it work Wiring Diagram.
Process Control Charts An Overview. What is Statistical Process Control? Statistical Process Control (SPC) uses statistical tools to observe the performance.
Oxygen, Temperature, Salinity Craig Kasper FAS 1401L Spring 2012.
NW 40 th Terrace, Suite 1 Gainesville, Florida USA MillSlicer PMC Phalaborwa AG Mill Initial Installation Trends and.
World AC/DC Power Supply Line Neutral Earth Line Neutral Ground USB 4-20mA interface RF Sen Open + - Fill Level DisplaymA Out Display + - (A)Acquired Signal(S)
MineralScan Lite Installation Guidelines Digital Control Lab, LLC NW 6 th Street, Suite F Gainesville, FL Main Unit power 90 – 240 VAC 50/60.
Chapter 6 - Part 1 Introduction to SPC.
Weather and X/Q 1 Impact Of Weather Changes On TVA Nuclear Plant Chi/Q (  /Q) Kenneth G. Wastrack Doyle E. Pittman Jennifer M. Call Tennessee Valley Authority.
Voting, Spatial Monopoly, and Spatial Price Regulation Economic Inquiry, Jan, 1992, MH Ye and M. J. Yezer Presentation Date: 06/Jan/14.
Selection of measuring instruments
Microwindow Selection for the MIPAS Reduced Resolution Mode INTRODUCTION Microwindows are the small subsets of the complete MIPAS spectrum which are used.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
Welcome to Turnitin.com’s Peer Review! This tour will take you through the basics of Turnitin.com’s Peer Review. The goal of this tour is to give you.
RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
1 Validation and Verification of Simulation Models.
Chapter 21. Stabilization policy with rational expectations
The Centrifugal Pump.
X-bar and R Control Charts
3701 NW 40 th Terrace, #1, Gainesville, Florida USA MineralScan MillSlicer General Overview by Dr. Karl Gugel Director, Digital Control Lab & Lecturer/Researcher,
Kinetic Theory The kinetic theory is an explanation of how particles in matter behave.
Quantitative Trading Strategy based on Time Series Technical Analysis Group Member: Zhao Xia Jun Lorraine Wang Lu Xiao Zhang Le Yu.
AccuMax Multi-Point Injection Mechanics
Statistical Process Control
 Light- A wave motion and contains many different wavelengths which represent the different colours  Dispersion- The way light is split up into the.
Solids, Liquids, and Gases. Kinetic Theory The kinetic theory is an explanation of how particles in matter behave. The three assumptions of the kinetic.
Calibration & Curve Fitting
Chapter 27 Lecture 12: Circuits.
Static Pressure Control Loop The purpose of the static pressure control loop is to maintain an optimal static pressure in the ductwork. The control loop.
Chapter 7 continued Open Channel Flow
Evaluating Robustness of Signal Timings for Conditions of Varying Traffic Flows 2013 Mid-Continent Transportation Research Symposium – August 16, 2013.
Thermodynamics Chapter 15. Expectations After this chapter, students will:  Recognize and apply the four laws of thermodynamics  Understand what is.
The kinetic theory is an explanation of how _______ in matter behave. Kinetic Theory 16.1.
ENERGY CONVERSION ONE (Course 25741) CHAPTER SIX …. Synchronous Motor Starting.
5. MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES
Chapter 4 PF/CE/CNX/SOP.
1 So far… We’ve developed a general energy balance We’ve developed a general material balance We’ve only actually looked at systems that are under steady.
Tutorial for solution of Assignment week 39 “A. Time series without seasonal variation Use the data in the file 'dollar.txt'. “
The Functions of Operating Systems Interrupts. Learning Objectives Explain how interrupts are used to obtain processor time. Explain how processing of.
Absolute Dating Notes and Practice. Directions: Use the following presentation to complete the notes sheet.
CHAPTER 5: Mass and Energy Analysis of Control Volumes
Turbocharger matching While the operating engineer will not normally be involved in turbo-charger matching, a familiarity with the procedure will lead.
© 2014 Carl Lund, all rights reserved A First Course on Kinetics and Reaction Engineering Class 12.
© 2014 Carl Lund, all rights reserved A First Course on Kinetics and Reaction Engineering Class 12.
Money and Banking Lecture 45. Review of the Previous Lecture Long-run Aggregate Supply Curve Equilibrium and Determination of Output and Inflation Impact.
REECH ME: Regional Energy Efficient Cluster Heads based on Maximum Energy Routing Protocol Prepared by: Arslan Haider. 1.
MillSlicer Polar Plot Examples & Explanations NW 6 th Street, Suite F Gainesville, Florida USA Introduction The shell.
Statistical Process Control04/03/961 What is Variation? Less Variation = Higher Quality.
Using the “Clicker” If you have a clicker now, and did not do this last time, please enter your ID in your clicker. First, turn on your clicker by sliding.
© 2014 Carl Lund, all rights reserved A First Course on Kinetics and Reaction Engineering Class 25.
UNIT 5.  The related activities of sorting, searching and merging are central to many computer applications.  Sorting and merging provide us with a.
13.58 parts per billion is the average for Nitrogen Dioxide (NO2) in Sheffield air (all readings, all times of day/night , When monitor is working)
AGROTOP Poultry Construction
The kinetic theory is an explanation of how particles in matter behave. Kinetic Theory 16.1.
, Dan Peterson Apparent inconsistencies and other issues in the xBSM measurements of IBS Scans We have studied the pinhole and CodedAperture.
LOAD FORECASTING. - ELECTRICAL LOAD FORECASTING IS THE ESTIMATION FOR FUTURE LOAD BY AN INDUSTRY OR UTILITY COMPANY - IT HAS MANY APPLICATIONS INCLUDING.
ANNEXE OFFICE CONVERSION. Heating Operation Two gas fired boilers provide hot water to two separate circuits, a constant temperature circuit and a variable.
A presentation for Bloomberg by Richard Morrish A-Venture Capital A presentation for Bloomberg by Richard Morrish A-Venture Capital © A-Venture Capital.
Establishing baselines Detecting a Trend What to do following a Trend How to re-baseline Life Cycle of a Trend.
CfE Higher Physics Particles and Waves
microeconomics spring 2016 the analytics of
Office of Education Improvement and Innovation
Geoffrey Cheung IME Winter 2010
Ladder Diagram Design: Huffman Method
16. Mean Square Estimation
Presentation transcript:

MineralScan Fill Level Signal Examples & Explanations - RNMC Introduction The MineralScan MillSlicer system normally consists of two fixed vibration sensors and one shell based sensor. The fixed sensors consist of a one placed on the inlet bearing housing and another sensor placed on the outlet bearing housing. From these three sensors, fill level signals are generated for each position. The inlet sensor fill level signal corresponds to the fill level in the first meter of the mill inlet. The outlet sensor fill level signal then corresponds to a fill level measurement taken at the one meter exit end of the mill. The shell fill level signal is taken from the center of the mill and therefore an average of the overall fill level in the entire mill. What is the general procedure to optimize mill operation? Slide 1 of 5 Time 0% 100% A B C D E F G Green – Shell Fill Level Red – Inlet Fill Level Blue – Outlet Fill Level Time Zero – Set the feed rate to achieve the required downstream output. A.Run the mill at a typically higher mill speed for an extended period of time to ensure all fill level signals are flat/stable and track one another. ~30 – 40 minutes. B.Decrease mill speed to increase the fill level in the mill. i.e. Mill slows down and retains more material. C.Allow the process to stabilize before making another change. Check bearing pressure and other key process variables. D.Again, incrementally decrease the mill speed and allow the fill levels to stabilize. E.Further decrease in mill speed to fill the mill. Here it results in a non-stable, always increasing fill level signal. F.Increase mill speed to bring the fill level back down to a stable comfortable level. G.Mill operation is stable. Check bearing pressure and other key process variables.

Slowly Filling the Mill (Real Trends) In the beginning of the trend all three signals are flat and parallel with one another. This indicates that material is passing over each sensor in a uniform and regular flow rate. The Mill is therefore operating in a predictable manner. At ~ 3:10 pm the set point for the bearing pressure was increased in the expert system further fill the mill. The mill therefore was slowed down by a fraction of an RPM and the change is observed in the fill level trends. One hour later, all signals are still flat so the mill is still in control. The bearing pressure readings were well within normal levels and so the mill was further slowed down at 4:20 pm. Notice that the toe energy levels in the polar plot are also decreasing when compared to the previous snapshot. At the end of the trend, the fill level signals are deemed too high and therefore re- calibrated to lower levels. Inlet Sensor – Red, Outlet Sensor – Dark Blue, Shell Sensors – Light Blue & Pink Slide 2 of 5

Re-Calibration & Stable Operation At ~ 6 pm, all three sensors we calibrated down from 95 – 100% to 80-85%. This was needed because: This mill had a complete liner change earlier in the week. The bearing pressure and mill power readings indicated that the mill could be filled to a significantly higher level. Near the end of this trend we observe a major dip in the outlet sensor fill level which indicate that the mill is purging material at the discharge end of the mill. After 30 minutes of stable flat/operation (past the ending of the above trend), the mill was further slowed down and stable operation was achieved at a much higher production level than that typically set in the expert system. The polar plots show minimal liner strikes and all fill level signals are flat and stable. Friday 5:50 – 6:50 pm (above) Friday 7:20 – 8:20 pm (below) Slide 3 of 5

Unstable Mill Operation (Clay) After an evening and night of relatively stable operation, the following morning, the operator determined that the fresh feed entering the mill contained a large amount of clay. This was determined through density and other process variables. The decision then was to drastically speed up the mill and reduce the fill level. While the signals do appear to correlate with one another, there now are wide gaps between the values of each signal near the end of the trend. One hour after the end of the above trend, we still have very unstable operation in the mill. It isn’t until another hour later later that the operator decides to significantly increase the water and flush the mill. This results in the signals beginning to track one another in a more uniform/close manner. Very Important: Notice that for the several hours of un-stable operation, the outlet sensor (dark blue) shows a much lower fill level than the inlet sensor (red). The shell sensors appear to be an average of the two. Saturday 8:40 – 9:40 am (above) Saturday 10:40 – 11:40 am (below) Slide 4 of 5

Saturday 12:30 – 1:30 am (left) Back to Stable Mill Operation Once the mill was flushed, stable operation ensued and the mill was placed back in expert system control. Procedure Summary Conclusions 1. Set the desired fresh feed TPH to a value that satisfies the downstream production requirement. 2. Slowly begin to decrease the mill speed in small incremental steps over time. Also increase feed as needed to meet the required output targets. 3. Upon decreasing the mill speed, observe the fill level trends to ensure that they remain parallel to one another and flat over time. 4. Use the other process variables (bearing pressure, mill power, recirculating load) to determine what optimal fill level should be finally held over an extended period of time. 1.Changing the mill speed by definition will increase (mill is sped up) or decrease (mill is slowed down) the vibration signal observed for the mill. Therefore speed changes should be done in small steps over 30+ minute intervals to allow the fill level signals to stabilize. 2.There is no ideal absolute fill level set point that should be used again and again on a daily basis. Instead the fill level signals should be used for real-time control while the “ideal” fill level set point should be determined by analyzing the other slower process variables. 3.If the fill level signals are consistently too low or high for a particular set of process conditions, they may require re- calibration. Contact DCL directly to learn how this is performed. We have a short video online that can guide you through this process and can also instruct you on how to calibrate a signal over the phone. This is a quick/easy process! Slide 5 of 5