Primary Ion Beams in the North Area: Design of the Safety Interlock Information for SPS-OP 14/2/2014 D.Manglunki presenting the work of T. Hakulinen, F.

Slides:



Advertisements
Similar presentations
InnoSys Process Sequence. End Effector Components End Effector Prox Switch Load Cell Wire Conduit Crows Foot Nut Runner.
Advertisements

Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
PLC OPERATION & PROGRAMMING Dr. ONUR TOKER. What is a PLC ? PLC is a computer system controlling a process. inputs - the keyboard is analogous to a proximity.
Vegard Joa Moseng BI - BL Student meeting Reliability analysis summary for the BLEDP.
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
Tomasz Ladzinski GS/ASE. LASS Annual Maintenance & Tests General Principles Each winter shutdown preventive maintenance of EIS takes place. It is followed.
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
SISTEMA Example Two. Schneider Electric – Areva D Acquisition – June Example 2: Safe stopping of a PLC-driven drive with emergency stop – Category.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
 AUTOMATION  PLC  SCADA  INSTRUMENTATION  DRIVES & MOTORS.
Timing upgrades after LS1 Jean-Claude BAU BE-CO-HT1.
Feedback from MEF  Only possible, if COMMON COORDINATION MEETINGS  Main possible conflict: SAFETY –No “work permits” in the injectors. MEF working on.
RF voltage and frequency interlocks A. Butterworth MP review 17/6/2010.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
Beam Interlock System PR b-CTM, October 7th, 2010 Cesar Torcato de Matos.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
SPS RESTARTING AFTER LS1 05/03/2015 Stéphane Cettour Cavé.
Time Management.  Time management is concerned with OS facilities and services which measure real time, and is essential to the operation of timesharing.
LHC Collimation Project Integration into the control system Michel Jonker External Review of the LHC Collimation Project 1 July 2004.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
PLC ARCHITECTURE - CPU by Dr. Amin Danial Asham.
BI day /12/00 1 PIPOS Project (TT2 & TT10) (Beam performances) G. Vismara  Present situation  Proposals  Beam parameters  Technical solution.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
Signals between LHC Machine & ALICE: an Update David Evans ALICE TB 23 rd February 2006 (with input from Detlef Swoboda)
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
BCT’s for beam protection L. Søby On behalf of D. Belohrad, L. Jensen and P. Odier 6/12/15Internal workshop ON MPP readiness for MJ beams 1.
Time Management.  Time management is concerned with OS facilities and services which measure real time.  These services include:  Keeping track of.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Bunch Numbering P. Baudrenghien AB/RF for the LHC/RF team.
MPP 4 th March - 1v0 CERN MPP CERN MPP SMP Team 3.
AC-Dipole Upgrades LHC Optics Measurement and Corrections review June CERN N. Magnin – TE/ABT/EC Thanks to E.Carlier, R.A.Barlow, J.Uythoven.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
Interfacing the FMCM for additional protection in the LHC and the SPS- LHC/CNGS Transfer Lines to the CERN controls system Cristina Gabriel Casado, Interlock.
PC Current Interlocking for the SPS Fast Extractions. 1 J. Wenninger July 2009.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
New PSB beam control BIS Interlocks A. Blas PSB Beam Control 20/01/ BIS: Beam Interlock.
23/06/2011 Linac4 BCC meeting. 23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
Alternative technologies for interlocking: HIMA Planar4
Miguel Angel Quero Corrales
Data providers Volume & Type of Analysis Kickers
Environment Temperature Monitor
Beam Interlock System SPS CIBU Connection Review
Injectors BLM system: PS Ring installation at EYETS
LV Safe Powering from UPS to Clients
Programmable Logic Controllers (PLCs) An Overview.
Interlocking of CNGS (and other high intensity beams) at the SPS
Status of the BI Work Package in the LIU-PSB frame
SPS Injection BIS - Draft requirements
Presentation transcript:

Primary Ion Beams in the North Area: Design of the Safety Interlock Information for SPS-OP 14/2/2014 D.Manglunki presenting the work of T. Hakulinen, F. Havart, S.Hutchins, P. Ninin, P.Odier, S.Reignier, F. Valentini, D. Vaxelaire, & colleagues.

Motivation Until recently, primary ion beams could be sent towards the North Area only during periods where no protons could be present in the SPS (ex: Pb ions at 13 & 80 GeV/u in December 2010, during PS proton injection septum fault). For the forthcoming Ar, Xe, and Pb runs, it is foreseen to intermix both proton and ion cycles in the same super-cycle. Although highly unprobable, it it not impossible in these conditions to extract a high intensity primary proton beam to the North Area, exposing personnel to a radiation hazard: – Wrongly programmed injection of protons on an ion cycle – Accidental firing of the extraction elements during a high intensity proton cycle – Installation of a slow extraction proton cycle (SFTPRO) during primary ion operations The principle of an interlock based on BCTs, preventing the extraction of a beam more intense than 2x10 11 charges, has been proposed by the SPS OP team leader, and approved by the Beams Department Safety Officer in March 2009.

Technical Solution Two BCTs installed in BA5, measure the beam intensity and give veto signal if I>2x10 11 charges. The interlock acts on the power supplies of extraction magnets MST and MSE in BA2, forcing them to quasi- zero current if the interlock gives a veto signal. The interlock function is activated by an “Ion-mode” key in the CCC Diversely redundant design at the level of measurement, control, transmission & action

Implementation Respect norms IEC (process industry) and IEC (nuclear installations). Two interlock chains: PLC and wired interlock (response time < 200 ms). – PLC chain based on SIEMENS S7 300 CPU and remote I/O with fiber optic cabling. – Wired chain based on HIMA Planar 4 modular wired logic. See technical spec EDMS

BCTs Pure hardware solution for maximum reliability and availability 2 new DCCTs, designed and made at CERN, installed in June 2012 in SPS point 5 Identical and independent systems Permanent monitoring of the circulating beam intensity (I B ) Comparator on the analogue signal – 2x10 11 charges Self-check system to assess the DCCTs performance 2 status sent to the interlock system indicating – whether I B is > or < 2x10 11 charges – whether the DCCTs are available or under test Real-time software for remote monitoring

Self-check principle Continuous check: Performed in the DIAGNOSTIC UNIT Assessment of important DCCT parameters: Current consumption Demodulation signal amplitude etc. Quick Check: Performed automatically once per cycle before injection in the CHECK & COMPARATOR UNIT Verification of the DCCT and comparator responses to a sequence of 6 calibrated current pulses injected into the monitor Results stored until the next Quick Check Validity period fixed to 60s One should tune the right balance between check severity and system availability

Each DCCT delivers 2 status and their complements to the 2 different inputs of the Interlock System (PLC and wired) Galvanic insulation by opto-couplers Status delivered to the Interlock System LOW_IB_STATUS TRUE IF Ib < 2x10 11 charges AND Self-Check result is OK AND NOT_IN_CHECK_STATUS is TRUE NOT_IN_CHECK_STATUS TRUE when the DCCT and the comparator are available, i.e not in quick check process

MSE-MST power supplies Acting on the REF-in of the converter to prevent extraction, forcing it to Imin Feedback to check I=Imin Check if system actually prevented an accident, in which case DSO action is required Actuator card between the Mugef and the Converter control crate -> direct control on the current reference

The reference simply passes through the card (REF-OUT=REF-IN) as the NO_EXTRACT_VETO signal from the Interlock is high, allowing extraction. REF-IN (Mugef) NO_EXTRACT_VETO (PLC) REF-OUT (Control crate) I0I0 REF – IN < I 0 Carte Ions/Protons Interlocks INTL-FAULT NO_EXTRACT_VETO (Wired) AND REF I min Idcct I> NO_REF_FAULT Reset with Key - + I erreur Status DCCT2 Normal behaviour: extraction of low intensity beam

REF-OUT (Control crate) I0I0 REF – IN < I 0 Carte Ions/Protons Interlocks INTL-FAULT AND/OR REF I min NO_REF_FAULT Reset with Key NO_EXTRACT_VETO (PLC) NO_EXTRACT_VETO (Wired) REF-IN (Mugef) Idcct I> - + I erreur Status DCCT2 - + The BCTs detect an intensity I>2x10 11 charges: One of the NO_EXTRACT_VETO signal from the interlocks (PLC and Wired) is low The reference is forced to I min =(720A for MSE ; I min =225A for MST), minimum current reference given by the CCC, inhibiting the pulse converter. Normal behaviour: high intensity beam, no extraction

Abnormal behaviour First Case: The signals NO_EXTRACT_VETO are low. The current reference REF-OUT is forced to I min. – In the second step, a reference REF-IN (above I 0 ) is still received. – This abnormal case should be analysed: A signal INTL-FAULT is generated and the converter is stopped. Second Case: The converter of a pulse cycle is allowed, the REF-IN is greater than I 0. – In the second step, the signals NO_EXTRACT_VETO become low: This abnormal case should be analysed. The associated actions are: – The reference REF-OUT is forced to I min. – A signal INTL-FAULT is generated and the converter is stopped. If either of these cases occurs, a fault in the converter will be activated, which can only be reset with a key. This key will be available to authorized persons competent to reset this fault (DSO), after an analysis of the fault event.

REF-OUT (Control crate) I0I0 REF – IN > I 0 Carte Ions/Protons Interlocks INTL-FAULT AND/OR REF I min NO_REF_FAULT Reset with Key NO_EXTRACT_VETO (PLC) NO_EXTRACT_VETO (Wired) REF-IN (Mugef) Idcct I> - + I erreur Status DCCT2 - + FAULT Abnormal behaviour First Case: The signals NO_EXTRACT_VETO are low. The current reference REF-OUT is forced to I min. In the second step, a reference REF-IN (above I 0 ) is still received. This abnormal case should be analysed: A signal INTL-FAULT is generated and the converter is stopped. Second Case: The converter of a pulse cycle is allowed, the REF-IN is greater than I 0. In the second step, the signals NO_EXTRACT_VETO become low: This abnormal case should be analysed. The associated actions are: The reference REF-OUT is forced to I min. A signal INTL-FAULT is generated and the converter is stopped. If either of these cases occurs, a fault in the converter will be activated, which can only be reset with a key. This key will be available to authorized persons competent to reset this fault (DSO), after an analysis of the fault event.

Status as of today (February 2014) 2 BCTs installed in BA5 and tested with beam Design of power supply safety system done; implementation being done TE/EPC Interlock design done and internally tested. Interface to BCTs tested. NOW: approbation of the Technical Spec. Final version of the BCT/Comparator electronics MST/MSE power supply interlocking electronics Installation of one Fast BCT (additional beam monitoring) Global BCT/Comparator system commissioning without beam Interface to MSE/MST final testing. Inter-site cabling: – BA5, CCC, CCR done. BA2 planned for March. – All Fiber-optics cabling finished Integration tests with all components will be connected early – Finalization of installation and test documentation. DSO-tests to be scheduled before SPS start-up.

Thanks for your attention!

Typical SPS Super-cycle North Area Ion cycle with slow extraction HiRadMat proton cycle LHC proton cycle

Geographical Layout

Interlock Schematic System monitoring interface using TIM

Development Model

SIF 1: Avoid high intensity proton beam extraction to north area in ION mode (ION_PROTON_MODE = 0 Λ LOW_IB_STATUS_A = 1 Λ LOW_IB_STATUS_B = 1 Λ IN_CHECK_STATUS_A = 0 Λ In_CHECK_STATUS_B = 0 Λ Watch_Check_A = 1 Λ Watch_Check_B = 1 Λ NO_REF_FAULT = 1) ∨ ION_PROTON_MODE = 1 PLC OUTPUT  NO_EXTRACT_VETO_A = 1 PLC OUTPUT  NO_EXTRACT_VETO_B = 1 TRIGGERING EVENT- SAFETY VETO REMOVAL FROM MST/MSE Timeout_Check_A = 1 Λ Watch_Check_A = 1 OUTPUT  Watch_Check_A = 0 TRIGGERING EVENT- DCCT 1 CHECK WATCHDOG INVALIDATION: Timeout_Check_A = 1 Λ Watch_Check_A = 1 OUTPUT  Watch_Check_B= 0 TRIGGERING EVENT- DCCT 2 CHECK WATCHDOG INVALIDATION:

SIF 2: Send and maintain veto to BIS in case of MSE/MST malfunction NO_REF_FAULT = 0 Λ ION_PROTON_MODE = 0 PLC OUTPUT  NO_SAFETY_FAULT = 0 TRIGGERING EVENT- SPS SAFETY BEAM DUMP REQUEST:

21 In red: Minimum system required to fulfil the initial specification In green: Monitoring, remote diagnostic tools + acquisition + logging General layout

Time diagram Range 3 Extraction Permitted NO Extraction 4 Cases NO Extraction Will be NOT_IN_CHECK_STATUS in the final version

Acquisition, monitoring and logging Acquisition via a RT program running in the FEC (Front End Computer) 1 FEC per DCCT  ADC 16 signals per system (Beam intensity on 4 ranges, system 1 and 2, status, etc.) Sampling rate: 100 S/s Start 900ms before injection Stop ~20ms after ejection Reading after ejection  Input Register 17 status per DCCT (result of every elementary check, etc.) Reading after ejection Data publication via a FESA class once per cycle after ejection Logging  Timber system  To be decided: o Which signal (Beam intensity, LOW_IB_STATUS, NOT_IN_CHECK_STATUS?) o What time resolution?

Test with beam (SPS.LHC4; ) ADC bin Time [ms] Will be NOT_IN_CHECK_STATUS in the final version Real signals seen via the FESA Navigator

BCT Planning March 2009 Specification draft April 2010ECR v1 Jan 2011 Cable pulling for provisional location (BB5) May 2011Writing the technical specification (v1) June 2012ECR v2 Sept 2011-May 2012Manufacturing of mechanics March - June 2012 Building the electronic prototypes June 2012 Installation of 2 monitors in point 5 Since August 2012 Test of DCCT & Soft RT programme Jan-Feb 2013Tests with the Interlock system LS1-Cable pulling for final location (BA5) -Approbation of the technical specification -Make final version of the electronic -Installation of one Fast BCT (additional beam monitoring) -Global System Commissioning without beam After LS1 -Global System Commissioning with Beam -Operation with Ions Beam in North Hall Required for the next step Now

Actuator card between the Mugef and the Converter control crate -> direct control on the current reference However, setting the current reference to I min does not guarantee that in the case of a malfunction of the electronic control of this converter, the current in the circuit is actually I min Supplementary DCCT measures the converter output current – compared to the input reference current “REF-IN”, giving us an error signal “I error ”. – If difference too large, comparator drives a relay into fault (open) position and cause action on the beam (signal NO_REF_FAULT). DCCT status managed by “Ion/Proton actuator card”: – DCCT dry status contact connected in series with relay contact -> any problem with the DCCT will also cause appropriate action on the beam (signal NO_REF_FAULT). REF-OUT Mugef Converter control crate REF-IN Crate Ions/protons Interlocks NO_EXTRACT_VETO (PLC) RESET with KEY INTL-FAULT NO_EXTRACT_VETO (Wired) I dcct NO_REF_FAULT DCCT2 Crate Status