US Army Corps of Engineers BUILDING STRONG ® Rosewood Park Coastal Section 506 of WRDA 2000 Kirston Buczak, PMP USACE, Chicago District May 2012.

Slides:



Advertisements
Similar presentations
Planning for fish bearing waters between Glen Canyon Dam and Lake Mead.
Advertisements

Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
Analysis of Dike 14 CDF to Public Greenspace. Who owns Dike 14? State of Ohio holds Dike 14 as a public trust land Cleveland-Cuyahoga County Port Authority.
Chattahoochee River Restoration Aquatic Ecosystem Restoration City Mills Dam Eagle and Phenix Dam.
US Army Corps of Engineers BUILDING STRONG ® A New Indicator of Ecosystem Restoration Benefit: The Biodiversity Security Index Richard Cole Environmental.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
US Army Corps of Engineers Northwestern Division Northwestern Division 1 System Flood Control Review: Regional Agency Review Briefing Lonnie Mettler Northwestern.
Post-Hurricane Ivan Emergency Habitat Restoration Larry E. Parson – U.S. Army Corps of Engineers, Mobile District Linda S. Lillycrop - U.S. Army Corps.
2010 Squak Valley Park Restoration Project City of Issaquah.
Florida Water Forum Everglades Restoration June 3, 2011.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
CERP Guidance Memorandum
Daria Mazey Senior Project Planner, San Francisco District (415) US Army Corps of Engineers BUILDING STRONG ® San.
Environmental Consultants BMI Environmental Services, LLC AN OVERVIEW OF THE WETLANDS REGULATORY PROCESS AS IT RELATES TO THE PROPOSED OCEAN SPRINGS HIGH.
Northeast Corridor Greenway Acquisition – Mitigation Feasibility Study Results City Council Workshop June 24, 2014.
“Insert” then choose “Picture” – select your picture. Right click your picture and “Send to back”. The world’s leading sustainability consultancy Legislation.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Jan 22-24, 2007 Transportation Research Board U.S. Army Corps of Engineers Wilmington District North Carolina’s Interagency Agreements to Streamline Project.
An Overview of Recent Changes To the EEP Restoration Plan and Mitigation Plan Templates Steven D. Roberts Vegetation Senior Specialist
Illinois Department of Natural Resources. Illinois Coastal Management Program Illinois was officially approved as a Coastal Management Program on Jan.
Planning for Restoration of the Mississippi River in the Twin Cities Christian Lenhart.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
Briefing to the Central Valley Flood Protection Board on Status of the FCSA July 12, 2013 Central Valley Integrated Flood Management Study.
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
Coastal Texas Protection and Restoration Project
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
Watershed-based Plan To Restore the Hackensack Meadowlands: The Meadowlands Comprehensive Restoration Implementation Plan Terry Doss and Karen Appell The.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Module 27 Continuing Authorities Program Module 27 Continuing Authorities Program Civil Works Orientation Course - FY 11.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
NEWS _menacehttp://news.yahoo.com/s/ap/climate_09_jellyfish _menace
US Army Corps of Engineers BUILDING STRONG ® SAFCA Board Update Dan Tibbitts Senior Project Manager Common Features Levee Programs Branch Sacramento District.
Lakes District At Louisiana State University CAP 206 Project US Army Corps of Engineers New Orleans District.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
US Army Corps of Engineers BUILDING STRONG ® Savannah River Basin Drought Workshop October 24-25, 2012.
Cape Fear River Fisheries Restoration: An Economic Engine October 31, 2013 Dawn York, Coastal Scientist October 31, 2013 Dawn York, Coastal Scientist.
Lower South ForkClearwater River Lower South Fork Clearwater River Nez Perce Tribe DFRM Watershed Division Mark Johnson-Project Leader
Landowner Assistance Programs in Florida Gainesville, Florida September 24, 2010.
Coastal Program- Great Lakes East Lansing Field Office Craig Czarnecki Bob Kavetsky Ashland Fishery Resources Office Mark Dryer Ted Koehler.
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
Building Strong! May Deep Draft Navigation Cost Sharing Jeremy LaDart Office of Water Project Review HQUSACE.
Western Lake Erie Basin Partnership Presented by: Name, Title Your Organization DATE YOU PRESENTED The Meeting you presented at.
LCA Comprehensive Study Louisiana Coastal Area, Louisiana- Comprehensive Coastwide Ecosystem Restoration Feasibility Study.
US Army Corps of Engineers BUILDING STRONG ® Planning Products & Milestones Planning Principles & Procedures – FY11.
US Army Corps of Engineers Chicago District FY04tpr\skbcongressional Civil Works Program Missions Missions Process Process Select Authorities Select Authorities.
U.S. Fish and Wildlife Service Overview: Alpena Fishery Resources Office Lake Huron Programs Anjanette Bowen USFWS-Alpena FRO Great Lakes Fisheries Leadership.
Stakeholders Meeting November 15,  Review the development and identification of State’s preferred alternative  Provide updates on SCH Project.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
Salton Sea Species Conservation Habitat Scoping Meetings July 7 and 8, 2010.
Department of Port Control Center for Regional Economic Initiatives February Doan Brook Stream Restoration Project Center for Regional Economic.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
Copyright © Kenneth Adelman, California Coastal Records Project. Malibu Lagoon Slide 1.
BUILDING STRONG ® PLANNING SMART ® US Army Corps of Engineers BUILDING STRONG ® Partnering Opportunities for Water Supply and Distribution Planning Beverley.
US Army Corps of Engineers Sacramento DistrictIntroductionIntroduction Sacramento River Bank Protection Project: Phase II Supplemental Authorization –
Draft Generic Environmental Impact Statement for Adoption of Stream Corridor Management Regulations for the Lake George Park.
U.S. Section International Boundary and Water Commission Rio Grande and Tijuana River Flood Control Projects Programmatic EIS.
Department of Public Works CONTRACT AWARD TO RECON ENVIRONMENTAL, INC., FOR LOWER ARROYO HABITAT RESTORATION City Council December 14, 2015.
Department of Environmental Quality Coastal Habitat Protection Plan (CHPP) 2 Department of Environmental Quality Environmental Management Commission.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
2014 POLLUTION RECOVERY FUND GRANTS STATUS EPC Meeting October 16, 2014.
USING STEWARDSHIP AUTHORITY TO ADVANCE RESTORATION Mae Lee Hafer Regional Stewardship Coordinator Collaborative Restoration.
Origin  On October 18, 1997 – 25 th Anniversary of Clean Water Act – Federal agencies were asked to rededicate their efforts to cleaning up the Nations.
Lessons Learned from Everglades Restoration Julie A. Hill Everglades Policy Associate.
Continuing Authorities Program
Galveston Bay Bottom Ecosystem System Features
Economic Study for Watts Branch Stream Restoration N. E
Lake Shenandoah Pollinator Trail
Eric Ellis Habitat Restoration Senior Program Specialist
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® Rosewood Park Coastal Section 506 of WRDA 2000 Kirston Buczak, PMP USACE, Chicago District May 2012

BUILDING STRONG ®  Background  Proposed Project Features  Status and Next steps 2 Outline

BUILDING STRONG ® Background 3  Great Lakes Fishery and Ecosystem Restoration (GLFER) Section 506 of Water Resources and Development Act (WRDA) 2000  Section 506 provides the authority to plan, design, and construct projects that support the restoration of fisheries, ecosystems, and beneficial uses of the Great Lakes  Cost share is 65% federal and 35% non-federal  Local sponsor’s share can be any combination of cash, and/or land and work in kind credits  Projects are justified based on ecosystem benefits

BUILDING STRONG ® Background  No recreation features allowed under the GLFER authority  Phases: Feasibility, and Design and Implementation (DI)  Feasibility phase includes preparing a Feasibility Report and Environmental Assessment (EA)  DI phase includes preparing plans and specifications, contract award and construction 4

BUILDING STRONG ® Proposed Project Features  Coastal Breakwaters - serve a dual function by providing physical habitat for nearshore lacustrine fishes and allowing for the formation of larger foredunes, which would provide substrate for dune grasses including the state listed marram grass and sea rocket. 5

BUILDING STRONG ® Proposed Project Features  Stream Daylighting – would reestablish connectivity of the stream with the lake by removing the box culvert, increase the size of in-stream habitat, and would at a minimum provide for spring spawning runs of suckers, lake chub and sport fishery trouts. Parking lot-removal and replacement with a permeable parking lot would reduce influx of runoff and pollutants into the stream and lake. 6

BUILDING STRONG ® Proposed Project Features  Vegetation Community Restoration – eliminate invasive plant species and reestablish native woodland plants and native dune grasses, providing migratory birds and local reptiles and amphibians with critical habitats. 7

BUILDING STRONG ® Status and Next Steps  Received approval to initiate the feasibility study in February 2011  Preparing feasibility report and EA  Hold Alternative Formulation Meeting (internal)  Receive approval to release for public review  Send EA out for 30-day public review (anticipated in July)  Respond to public comments  Submit draft feasibility report and EA for project approval (anticipated in September 2012)  Project approval anticipated in November 2012  Initiate DI phase in early