Naomi Wyles ASTeC STFC Daresbury Laboratory

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
Corporate Interface Architecture George Palios. Contents Outlines the activities undertaken to enhance the quality of service of the Corporate interfacing.
Df1 Hi: my name is: Dessie Ferguson. NEVER GAMBLE WITH ANYONE’S SAFETY.
MY NCBI (module 4.5).
ALO Planning & Assurance Requirements
1 The aim…. ‘to enable assessors to objectively assess a laboratory’s compliance with the new standards’
Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
Understanding the management of risks to health and safety on the premises of a retail business Unit 352.
Higher Administration and IT Administrative Practices.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
Quality Assurance/Quality Control Policy
ASPEC Internal Auditor Training Version
PERSONAL CARE AND NURSING SERVICES PROVIDER MEETINGS 2014.
Data Protection Recruitment Process
Hot Checkout System for Accelerator Operations at JLab Ken Baggett (Team Leader) Theo Larrieu Ron Lauzé Randy Michaud Ryan Slominski Paul Vasilauskis.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
VETiS Moderation meetings – November 2012 Welcome to the Australian Institute of Education and Training.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
WAO, Trieste, 24th - 28th September 2007 An Overview of the Reliability and the Fault Trends of the SRS Cheryl Hodgkinson Daresbury Laboratory Synchrotron.
Information Session for Accommodation & Hospitality Staff: Electronic Leave Recording using iTrent.
Certificate IV in Project Management Course Structure Course Number Qualification Code BSB41507.
Health and Safety Policy
Calculating Quality Reporting Service – an introduction Chris Brown CQRS Design, Build and Test Project Manager 05 September 2012.
1. 2 Ergonomics 3 THE ERGONOMIC PROCESS There are two approaches to ergonomics:  Pro-active intervention (NIOSH Model)  Reactive intervention.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Training Advanced Photon Source Operators: From the Street to the MCR Joseph Sutton Assistant Chief of Operations Advanced Photon Source Argonne National.
Low Emittance RF Gun Developments for PAL-XFEL
INFO 637Lecture #101 Software Engineering Process II Review INFO 637 Glenn Booker.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
Certificate IV in Project Management Certificate IV in Project Management Course Structure Course Number Qualification Code BSB41507.
Electronic Requisitions for West Des Moines Hospital Marlene Turner Supply Chain Analyst Iowa Health Des Moines 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Access to microdata in Statistics Estonia First DwB European Data Access Forum Luxembourg, 28th March 2012 Tuulikki Sillajõe.
Autonomous Inspection Unit Seaham Quarry Site Contact: Richard Tomkins - Quarry Manager Phone:
Campus Network upgrade and Wi-Fi Rollout REVIEW AND PHASE 3 PROJECT MANAGER TASKS.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Clerical & Support Staff Introduction to Moving ON Audits & Clinical Indicators.
Agenda  Safety Management in Roads Service  A review of the roles within CDM  What are the construction regulations?  What's in a H&S plan?  CDM and.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
Roles and Responsibilities Explain the roles and responsibilities for health and safety of key personnel in selected workplace.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Commissioning and Utilisation of ERLP David Holder ASTeC, Daresbury Laboratory.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
Health and Safety Induction for Managers. Introduction This induction supplements the Health and Safety Induction for Staff and should be viewed by all.
Safety Audits An essential tool for active safety management April 2015 Dr Emer Bell Integrated Risk Solutions.
Scientific data storage: How are computers involved in the following?
Testing Requirements in the Boiler House Requirements for regular testing will vary according to national regulations, and the type of equipment installed.
OPERATOR ROLES AT THE AUSTRALIAN SYNCHROTRON LIGHT SOURCE How We Keep Our Operators Motivated Don McGilvery Greg LeBlanc.
Component D: Activity D.3: Surveys Department EU Twinning Project.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Transition to user operation Didier Voulot :: Paul Scherrer Institut SwissFEL Commissioning Workshop, 22 March2016.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
First Line Diagnosis FLD Julian Brower CEng FIET Section Leader ISIS Accelerator Performance Improvement.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Faculty of Health & Science Practice Development Framework Michelle Garner.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
Machine operation and daily maintenance management in SOLEIL
Health and Safety Policy
Accident and Incident Investigation
Accelerator Layout and Parameters
Managing a Research Project
Electron Beam Systems ETC and Methodology
Ian Evans SSRL Safety Office
Permit to Work Process​ HSE GROUP RULE (CR-GR-HSE-402)
Presentation transcript:

Naomi Wyles ASTeC STFC Daresbury Laboratory ERLP Commissioning Naomi Wyles ASTeC STFC Daresbury Laboratory

Overview of ERLP Achievements so far Both super conducting linac modules cooled to 2K Synchronisation of RF and photo-injector drive laser High power RF tests for linac module Commissioning of terawatt laser for Compton back scattering and electro-optic bunch length diagnostic Electron Gun DC Photocathode Electron Gun First electrons obtained in August 2006

Overview of ERLP Gun Power Supply Gun Super Conducting Booster 1st (outward) Arc Energy Recovery Linac 2nd (return) Arc Transfer Line Beam Dump

Commissioning Tasks Construction of ERLP is not yet complete Commissioning has taken place in the following areas Photoinjector laser system This was installed and commissioned prior to the gun being ready Further enhancements made after the first phase of gun commissioning The electron gun is currently beaming into a dedicated diagnostic beamline All radiation control systems complete Cryogenic system has been commissioned to 2K Usually possible in parallel with construction work RF System Buncher cavity, transverse deflecting cavity and main SC accelerating modules are all being commissioned at present

Planning the commissioning The electron gun is being commissioned using a dedicated diagnostic beamline Dedicated diagnostics include horizontal and vertical slits, YAG screens, transverse deflecting cavity and an energy analyser magnet This will be removed when gun commissioning is complete At the same time the remainder of ERLP is being constructed Lead time for the delivery of the SC linac modules was significantly longer than anything else Problems with building and commissioning the gun Problems in achieving XHV braze between gun ceramic and metal flanges lead to delays in gun construction Additional problems while operating the gun led to serious delays in gun commissioning Gun commissioning is now on the critical path Construction programme is running well

Commissioning and construction conflicts (health and safety) Construction and commissioning have to be separated in time Construction during office hours Commissioning overnight and at weekends This pattern means work has to be carefully controlled to avoid any conflicts Permit to Work (PtW) system (already used at Daresbury in other areas so staff are familiar with it) Includes a Risk Assessment and a Written System of Work Not practical to cancel every permit before every commissioning shift Handover procedure has been developed

Handover procedure ERLP has a site manager who will know what work is going on and what permits are outstanding The handover manager is responsible for the handover procedure being followed correctly A handover sheet must be completed Handover procedure The site manager checks that there are no outstanding PtWs that prevent commissioning The site and handover managers tour the accelerator area checking for people and making notes of hazards The site manager then issues a PtW for the commissioning and releases the keys for machine operation The Key commissioning team member then reads and signs the handover sheet The handover sheet and PtW are kept on display and must be read by subsequent Key Commissioning team members The handover sheet also specifies what must be done to return from commissioning to construction

Handover Sheet

Commissioning and construction conflicts (staff availability) Most staff do not work on ERLP full time Commissioning team are mainly accelerator physicists and technologists who work on other projects as well Construction team are also involved in other projects, particularly the SRS which has a schedule written many months in advance The running of the SRS has to take priority over ERLP because it is a user facility

Scheduling and Shifts Commissioning uses a 3 shift system Weekdays only shifts 1 and 3; construction in shift 2 Weekends/Holidays all 3 shifts used Flexibility about when construction ends Staff work shifts on a casual basis – average of 1 per week Availability collected (which is expected to be ‘reasonable’) on an Excel spreadsheet Roster produced based on this Macro sends Outlook appointments No problems due to large pool of people Smaller pool of people would require fixed shifts

Commissioning team Every beam commissioning shift requires 2 people One must be a member of the ‘Key Commissioning Team’ Responsible for leading technical work Responsible for personnel and machine safety Key Commissioning team members only devote 30% of their time to commissioning They undertake additional training Laser safety General Health and Safety Second team member does not have such a large commitment to the project They are expected to be interested and enthusiastic

Training All personnel who wish to enter the ERLP accelerator areas must have undertaken basic radiation safety training (or be accompanied at all times by someone who has) Enforced by access control system using ID badges Commissioning team have additional training in the Personnel Safety System Includes how to carry out a search If there was a radiation incident the SRS crew would be called and are responsible for implementing action Key commissioning team have additional training 4 day health and safety course which is being rolled out to everyone with management or project responsibilities Laser training – enables them to switch the laser on and off thus not requiring a laser specialist to be present at all times

Documentation ERLP Safety Handbook Issued to all key commissioning team members and other relevant staff Covers how safety is organised Lists those with specific safety responsibilities and what those responsibilities are Details procedures for carrying out all kinds of work Content is presented during basic safety training Local rules All commissioning team members must be familiar with these

Documentation ELOG Log for recording work in shifts Fault reporting system which automatically e-mails relevant specialist ERLP Manual ERLP Manual is slowly being replaced by a Wiki-style manual This records and saves all versions Web based so can be accessed off site Project plan This is live and enables people to see when the next commissioning period will begin During commissioning there is a much more detailed shift by shift plan Fine detail only added near the time Reports These are written after the work is discussed at a weekly meeting

Communication Meetings are held on a regular basis During construction daily meeting at 09:00 to discuss day’s work and any conflicts with commissioning A weekly planning meeting is also held for construction issues During commissioning a daily meeting is held at 16:00 to discuss the next 24 hours commissioning All commissioning team members who have been on shift in the last 24 hours or who are due on shift in the next 24 hours are expected to attend (except the night shift) Weekly commissioning review takes place attended by all key commissioning team members and as many others as possible. Discusses previous week’s work and identifies reports to be written. Plans the next week’s work.

Conclusion Successful method of simultaneous construction and commissioning Satisfies Health and Safety requirements Significant progress has been made in spite of technical difficulties

Useful Links http://projects.astec.ac.uk/ERLPManual/index.php/Main_Page https://srdweb5.dl.ac.uk/erlp/elog/