ENERGY AND CARBON REDUCTION PLAN May 21, 2014. Initial Site Evaluation Initial site energy benchmark was performed in 2006 using the US Department of.

Slides:



Advertisements
Similar presentations
Sustainability In Flight
Advertisements

10 YEAR SUSTAINABILITY PLAN The “30 in 10” challenge of a greener Lehman.
MUNICH REINSURANCE AMERICA, INC. NOVEMBER 5, 2014.
Sustainability and Leadership in Energy and Environmental Design (LEED) Lessons Learned from The Fernald Preserve Visitors Center.
Greening America’s Congregations Through Energy Efficiency ENERGY STAR ® Tools, Technical Support and Public Recognition.
Leadership in Environmental Stewardship in a Fiscally Prudent Manner WAUKESHA COUNTY SUSTAINABILITY EFFORTS.
LEED Gold Woodward Academy Math-Science Building Leadership in Energy and Environmental Design.
Sustainability in Campus Operations at Three Higher Education Institutions in Tompkins County, New York Nick Goldsmith TAITEM Engineering, PC AASHE Conference.
Sustainable Design & Construction at Yale University July 2009.
RenewAire is On the Move! New 35,000 SF facility.
New Live Learn Residence Hall. Current Grove With general placement of new building Create a reinvigorated role for The Grove in campus life.
Staff Induction-Environmental Awareness
Stadiums & The Environment Steve I Ron M Dan C. Stadium Construction With the construction of the new stadium in Minnesota brought concerns to the community.
Energizing Brownfield Projects Terri Smith Environmental Liability Management, Inc.
The Role of Tenant and Property Operations in Implementing Sustainable Practices Public Building Services October. 17, 2007 Om Taneja PBS Tenant and Property.
BECOMING GREEN Santa Margarita High School Academic Building.
The Green Building Act of 2006: Transforming the Market DC Department of Housing and Community Development Prepared by the DC Department of Housing and.
Upstate Energy Expo 2010 NYSERDA Program Overview March 30, 2010 Cheryl Glanton, Project Manager.
Kendal at Longwood Cottages Expansion Project Sustainable Development & LEED Certification.
ENERGY CONSERVATION & BUILDING STANDARDS Brian Deal, Fred Hahn, Karl Helmink, Claire McConnell, Dhara Patel, Claudia Szczepaniak, Scott Willenbrock.
Energy Management 101 Lance Stewart Facilities Maintenance Manager/Energy Manager City of Charlottesville, Virginia.
Sustainability at CNM President’s Sustainability & Climate Control Task Force.
1 Ohio School Facilities Commission Green Schools Initiative Presentation #2.
STAFFORD COUNTY PUBLIC SCHOOLS ENERGY MANAGEMENT PROGRAM 2009 UPDATE Bob Randall CEM,,BEP, CBCP Energy Manager Energy Manager.
Stormwater Academy: Green Roofs Green Roof Design and Operation Operation (Part IV) 2006 FSA Annual Conference June 14, 2006 By Marty Wanielista and Mike.
Houston Independent School District Robert L. Frost Elementary School PROJECT PROFILE PROJECT DESCRIPTION Frost Elementary is a new replacement school.
1 Solar Integration Strategy | Hosted and Sponsored by Nike Corporate Headquarters 25 Years of Chapter History 2008 Symposium Facilities Management for.
UNCLASSIFIED “It’s All About the Soldier” Net Zero – Energy Initiative Prepared by: Todd A. Dirmeyer Energy Manager 7 August 2012 Thanks to: DASA- I,E&E.
KSU SUSTAINABILITY In 2013 Kennesaw State University was among seven Georgia Colleges & Universities named in the “Green Colleges List” issued by.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
Grounded in Green Facilities Management & Construction has been leading the university into the future by implementing “green” initiatives for years? Let.
Making the Most of Public Projects and Improvements Joel Nelson Salt Lake City International Airport Property Manager IRWA Federal Agency Update Las Vegas,
Mari L. Snyder VP, Social Responsibility Marriott “Spirit to Preserve”
State and Local Governments Leveraging ENERGY STAR in Energy Policy.
330 North Wabash EPA’S ENERGY STAR RATING ACHIEVED December, 2009  330’s Energy Performance is in the top 25% nationwide accomplished through:  No Cost.
*Green City “Briefing” presentation to the City Council Summer 2008 GCGC GCGC * Project Location is confidential.
1 every student. every classroom. every day. Building a Sustainable School District Jody London, President, Board of Education October 28, 2011 Council.
SUSTAINABLE FLORIDA TECH Presented by the Green Campus Group.
Sustainability and Public-Private Initiatives Sean Patton Director, Energy Solutions LOCKHEED MARTIN CORPORATION JUNE 8, 2012 Sustainability for the Future.
Steve Horseman – Grainger Industrial Supply, District Sales Manager for the State of Kansas The Four Corners of Sustainability.
Building Metering & Benchmarking: It’s Worth the Energy American University Emily Curley, Sustainability Manager VCU Energy & Sustainability Conference.
Phoenix Convention Center Phoenix, Arizona Procurement & Benchmarking Strategies for High Performing Buildings Procurement, Process, & People: The Path.
Net-Zero Rubenstein 5% Energy Reduction Goal Main campus electricity is supplied by the Burlington Electric Department (BED). Nuclear energy, which comprised.
Carbon Emissions from the University of Minnesota Buildings & Facilities Andrew Edwins David Grandall Luke Hollenkamp Patrick Santelli Amy Scheller.
CI Strategic Initiative on Environmental Sustainability President ‘s Planning & Policy Council Meeting November 21, 2011 Dave Chakraborty Dan Wakelee.
TAOYUAN ENVIRONMENTAL SCIENCE & TECHNOLOGY PARK BUSINESS INVITATION SEMINAR PRESENTATION OF PREFERENTIAL MEASURE & COUNSELING ENVIRONMENTAL PROTECTION.
5 EXISTING BUILDINGS. Slide header copy In This Chapter >Sustainable existing buildings >Planning green projects for existing buildings >Measures to improve.
Marty Matlock, PhD, PE, BCEE Executive Director, Office for Sustainability Professor,UA Division of Agriculture Biological and Agricultural Engineering.
Energy Management Sara Hudson Christine Richardson Colleen Tiernan Joanna Wirkus.
Kendal at Oberlin Energy Conservation & Sustainability Initiatives.
Data Center Energy Use, Metrics and Rating Systems Steve Greenberg Energy Management Engineer Environmental Energy Technologies Division Lawrence Berkeley.
Green Action Team Meeting February 19, 2009 Status of Major Deliverables Green Building Initiative (Exec Order S-20-04)
ENERGY EFFICIENCY & SUSTAINABILITY IN NEW SCHOOL CONSTRUCTION August 10, 2006 SFB STUDY SESSION.
Goal 4: Environmental To blend our residential and commercial properties with our “City of Parks and Trails” image to create sustainable framework of.
Earth Day 2016 Energy, Water, and Climate Initiatives at GSAM April 6 th, 2016 Ryan Ollie, CMVP, EIT Manager of Energy Solutions Advocate Health Care.
KSU SUSTAINABILITY From Kennesaw State University has been among seven Georgia Colleges & Universities named in the “Green Colleges.
Planning for LEED ® © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture Leadership in Energy and Environmental Design LEED ® and its related.
Johnson Controls, Inc. — 1 1/6 2/6 4/6 5/6 1/4 3/4 1/2 WAHOO PUBLIC SCHOOL SENIOR/JUNIOR HIGH & ELEMENTARY ENERGY PERFORMANCE CONTRACT FEASIBILITY March.
Virginia Energy Conservation and Environmental Standards May 19, 2009 Capital Outlay & Facilities Manager Forum.
Fort Stanwix National Monument Energy Audit Contract
KSU SUSTAINABILITY 2017.
Objectives of a Green Building
Intel Corporation External Environmental Goals
Nestlé Striving for Sustainability
Planning for LEED Leadership in Energy and Environmental Design
LEED Defined Leadership in Energy and Environmental Design
Leadership in Energy and Environmental Design
Planning for LEED Leadership in Energy and Environmental Design
TCU and the Presidents Climate Commitment:
Presentation transcript:

ENERGY AND CARBON REDUCTION PLAN May 21, 2014

Initial Site Evaluation Initial site energy benchmark was performed in 2006 using the US Department of Energy’s benchmarking software. Our Campus buildings initial scores for the four Plazas were: 23, 15, 01, and 01.

First steps Based on the low energy scores, the buildings underwent a more thorough evaluation to determine which areas needed to be addressed. The initial energy study showed very high annual electrical usage (15,899,568 kWh/year) and water consumption (11,276,589 gallons/year). The campus mechanical infrastructure was found to be mostly working as designed, but the systems had been installed prior to the Energy Policy Act of 1992 and were not designed to be energy efficient.

Program Creation About the same time, in early 2007, Munich RE announced its plan to move towards Carbon Neutrality by The Munich Re Energy Reduction Plan was created over a 12-month period starting in 2007 and based on metrics and guidelines established in: the US Energy Policy Act of 2005 the LEED for Existing Buildings: Operations and Maintenance Rating System (version for USGBC member ballot in October 2007) the 2006 International Energy Conservation Code the ASHRAE Standard (The plan was revised where possible to ASHRAE Standard )

The Research Phase In the research phase of the Plan, the Corporate Facilities team: Identified projects through peers, vendor inquiries, classes and product expositions. Compiled more detailed "building-energy" models using ten years of utility bills to create average usage and baselines for systems. Used initial in-house calculations and models for budgeting consideration and used professionally engineered models to validate projects and savings.

PHASE ONE of the Program Improvements In 2007, Munich Re introduced the first phase of its Energy use and Carbon Reduction Plan. Campus mechanical systems were upgraded to improve environmental and economic performance. This phase of the Plan included: the installation of ABB VFD’s throughout the campus (1, kWh/year) Installation of Watt Stopper occupancy controls at Workstations (132,740 kWh/year) the installation of the Automated Logic WebCTRL system. Building Automation System (3,500,000 kWh/year) the replacement of the two P2 150-ton chillers (93,400 kWh/year) Lighting upgrades replacing T8 light fixtures with T5 (1,800,000 kWh/year) The installation of a centrally automated IP based lighting controls system (1,300,000 kWh/year) By the end of 2012 the campus annual energy usage fell to 8,053,768 kWh (a reduction of almost 50% from 2007).

Other CO2 Savings RECYCLING: In addition to the improved energy efficiency, the campus increased its recycling of plastic, paper, cardboard, commingles, carpet, organic waste, construction waste, and hazardous wastes. Campus recycling has improved from less than 30% to over 70%. WATER EFFICIENCY: The campus also improved irrigation controls and upgraded to waterless urinals, 1.28 g.p.f. toilets, touch-less faucets, and improved cooling tower chemical controls. These improvements reduced water usage by 31% (to 7,854,030 gallons per year).

Performance Measures The combined effect of these improvements was a dramatic decrease in the campus Carbon Footprint. Munich Re had requested each entity reduce its Carbon Footprint by 12% by Because of the attractive ROI of many of the efficiency projects, Munich Re Princeton was able to reduce its foot print by 65% off its 2007 number (55% below the 2009 baseline year established).

Awards and recognition On September 25, 2012, the 4 buildings on the Princeton campus earned the BOMA 360 Performance Building designation (presented by Building Owners & Managers Association International. Designation is awarded to properties managed to the BOMA’s highest standards of excellence). Only 10 buildings in the state of New Jersey have earned this designation. Also in 2012, the company successfully completed the BOMA 7 – Point Challenge (an encompassing energy reduction program challenging members of Building Owners & Managers Association International to decrease energy consumption by a minimum of 30 percent across company portfolios by 2012). Munich Re received special recognition for the greatest reduction on a percentage basis in the program. The campus improvements and sustainability program were recognized by numerous national and international industry organizations.

PHASE TWO of the Program Improvements In August 2012, Munich Re completed the second phase of its Energy and Carbon Reduction Plan. The company completed construction on a 2.47 mW solar canopy system over the Plazas I and II parking lots, supplying the campus with: Approximately 3,122,077 kWh of zero carbon energy annually. Over 100,000 cubic feet of storm water recharge chambers installed below the parking lots to reduce the storm water runoff on campus. A significantly reduced Heat Island effect in the large parking lots on campus.

Site Re-evaluation The buildings initial benchmarks using the EPA Portfolio Manager had scores of: 23 (Plaza I), 15 (Plaza II), 01 (Plaza III), and 01 (Plaza IV). In 2013, the buildings were re-evaluated. Scores improved dramatically to: 75 (Plaza I), 92 (Plaza II), 60 (Plaza III), and 46 (Plaza IV). In addition, Plaza’s III and IV are undergoing further improvements to ensure the company achieves a campus wide “Energy Star” certification.

The Next Steps… Munich Re is currently: Replacing 57 inefficient transformers on site (est. energy savings: 402,153 kWh/year). Replacing Plaza 1 Cooling plant (est. energy savings: 200,000 kWh/year). Preparing to install upgraded Bicycle Racks and electric car charging stations on campus to promote zero emission commuting. Adding Natural gas pre-heating to the campus to decrease the use of Indirect energy in favor of the more efficient direct energy heating source. (est. energy savings to be provided as part of engineering of project).

The Next Steps… In addition, the company has started working towards submitting for campus wide LEED certification. LEED, or Leadership in Energy & Environmental Design, is a certification program created by the US Green Building Council that provides third- party verification of sustainability and efficiency programs in buildings. Plaza 2 is currently in final LEED review with the expectation of receiving Silver certification in Plaza 3 is on target for a 2Q submission with the expectation of LEED Gold certification. The entire campus is expected to qualify for at least LEED Silver certification by 2015.

2015 Targets (Energy Costs) The Munich Re Energy and Carbon Reduction Plan has used the savings created by its initial phases to help fund the continuation and improvement of the Plan. Savings created by initial projects and phases currently in planning are on target to reduce annual energy costs by $1,300,000.

2015 Targets (Energy Use and Energy Star Ratings) The upcoming MRAm Energy and Carbon Reduction Plan projects are expected to continue the energy use reduction and energy ratings improvement on campus through 2015.