NRC Endorsement of Standards

Slides:



Advertisements
Similar presentations
NRC Consensus Standards Program
Advertisements

Update on NRC Low-Level Waste Program – Major Activities Large Scale blending of LLRW -Issued guidance to agreement states for reviewing proposals for.
CURRENT METEOROLOGICAL HAPPENINGS THE SITING AND ACCIDENT CONSEQUENCES BRANCH DIVISION OF SITE AND ENVIRONMENTAL REVIEWS OFFICE OF NEW REACTORS Brad Harvey,
Plant Vogtle 1&2 10 CFR Pilot Program NESCC Meeting
1 Current Reviews of Standards by NRC Tom Boyce, NRC/RES/RGDB Nuclear Energy Standards Coordination Collaborative (NESCC) November 7, 2013.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
Release of Patients Treated with I-131: An Update Michael Fuller Team Leader Medical Radiation Safety Team U.S. NRC.
Dr. Jose Pires Structural, Geotechnical and Seismic Engineering Branch
NRC Perspective of Recent Configuration Management Issues Tom Farnholtz Chief, Engineering Branch 1 Division of Reactor Safety, Region IV June 2014 CMBG.
Cyber Security Plan Implementation Presentation to CMBG Glen Frix, Duke Energy June 20,
NRC Cyber Security Regulatory Program Development Background ANSI Nuclear Energy Standards Coordination Collaborative (NESCC) Meeting November 3, 2014November.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
1 NRC Follow-up Actions on NESCC Task Group Reports (Concrete Repair, Cabling and Welding) NESCC Meeting November 7, 2013 Richard Jervey USNRC Office of.
Slide No. 1 IAEA Developed by NSNI Division, IAEA under the supervision of Mr. Marco Gasparini (PNRA supported in the development under TC-Project PAK/09/028)
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
Design Bases From 1957 to 2003 June 18, 2007 Chuck Casto Region II NRC.
Current Air-Operated Valve Regulatory Activities Steven Unikewicz US Nuclear Regulatory Commission Office of Nuclear Reactor Regulation January 2006.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
Technical Regulations – U.S. Procedures and Practices U.S.-Brazil Commercial Dialogue Digital Video Conference Series August 22, 2006 Mary Saunders Chief,
ACADs (08-006) Covered Keywords Commission, regulation, advisory, standards. Description This presentation provides general information about each of the.
11 Technical Session 3 – Rulemaking Process: NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a Raymond (Ray)
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
1 The U.S. NRC’s Reactor Certification and Licensing Process – Meeting the Challenge? Commissioner Peter B. Lyons U.S. Nuclear Regulatory Commission 15.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) March.
ACADs (08-006) Covered Keywords CFR policy, CFR violation, CFR enforcement Description Supporting Material
13 th Nuclear Utility Meteorological Data Users Group Meeting Lessons Learned From Establishing Design- and Operating-Basis Regional Meteorological Conditions.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Nuclear Energy Standards Coordination Collaborative (NESCC) November 29, 2012.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
RIC 2009 Rulemaking Process: “NRC and Industry Perspectives on Improving Quality, Timeliness, and Consistency in 10 CFR 50.55a “A New Approach” Jacob Zimmerman.
ISTOG Winter 2010 – Ed Cavey Fermi 2 1 ISTOG Issues - Code Inquiries / Proposed Code Cases ISTOG Issues from 2010 January meeting and subsequent telecons.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) July.
Strengthening Science Supporting Fishery Management  Standards for Best Available Science  Implementation of OMB’s Peer Review Bulletin  Separation.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
Regulatory Framework for Uranium Production Facilities in the U.S.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) March.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Monitoring the Long-Term Effectiveness of Integrated Safety Management System (ISMS) Implementation Through Use of a Performance Dash Board Process Mike.
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
1 RIC 2009 Fire Protection: Organizational Readiness for NFPA 805 (Technical Session 5) Alexander Klein, P.E. Chief, Fire Protection Branch Office of Nuclear.
1 EVALUATING DIVERSITY IN DIGITAL I&C SAFETY SYSTEM DESIGNS Michael E. Waterman Digital Instrumentation and Controls Branch Division of Engineering Office.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
Proposed Update of Appendix I to Part 50 RIC 2009 Radiation Protection Proposed Update of Appendix I to Part 50 Jean-Claude Dehmel NRO/DCIP/CHPB March.
Meet your Regulator Workshop with FANR licensees October 2011 Dr. John Loy Director, Radiation Safety Federal Authority for Nuclear Regulation.
Nuclear Codes and Standards Needs in Argentina International Working Groups April 2016 Buenos Aires, Argentina Ryan Crane Oliver Martinez.
Status Update on the NRC Proposed Rule to Amend 10 CFR Part 61
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
Requirements for Low-Level Radioactive Waste Minimization Plans Rich Janati, M.S., Chief Division of Nuclear Safety PA Dept. of Environmental Protection.
Anna Preston Vance, HA of Paris
Office of Nuclear Material Safety and Safeguards (NMSS)
Industry Guidance on Part 21 Evaluation and Reporting
Updating the NRC’s Alternative Disposal Request Guidance Document
10 CFR Part 61 Low Level Waste Disposal Rulemaking Update
NRC’s LLW Regulatory Program: Update of Emerging Issues
U.S. Nuclear Regulatory Commission Radiation Safety Standards
Research and Test Reactor Safety: The Regulatory Perspective
Tom Wolf, Governor Patrick McDonnell, PA DEP Secretary
Industry Input on NRC’s Low-Level Waste Program Strategic Assessment
Overview of NRC Low-Level Radioactive Waste Activities and Initiatives
Thomas Koshy, On Behalf of Brian Thomas, Director
NRC Update of LLW Emerging Issues
TRTR Briefing September 2013
Presentation transcript:

NRC Endorsement of Standards Tom Boyce Chief, Regulatory Guide Branch NRC Office of Research tom.boyce@nrc.gov NESCC Meeting November 29, 2012

NRC’s Policies on Consensus Codes and Standards Consensus codes and standards have been integral to the regulatory process for 3 decades Codes and standards promote safe operation of nuclear power plants, improve effectiveness and efficiency of regulatory oversight Federal law requires Government staff to use consensus standards where possible National Technology Transfer and Advancement Act of 1995 OMB Circular A-119

NRC Formal Endorsement Processes Rules / Regulations (10 CFR) Part 20: Standards for Protection Against Radiation Part 50: Domestic Licensing of Production and Utilization Facilities Part 52: Licenses, Certifications, and Approvals for Nuclear Power Plants Regulatory Guides (RGs) Standard Review Plans (SRPs)

NRC Other Endorsement Processes Safety Evaluation Reports (SERs) Licenses (FSARs and DCDs) Inspection Procedures Letters & Memoranda Generic Communications/Regulatory Issue Summaries (RIS) Technical Reports (NUREGs)

Shortcomings of other Processes Incomplete treatment of the standard Bypasses key agency checks and balances Difficulty in establishing the staff position Difficult to find in the regulatory record Lack of “durable” guidance Does not facilitate regulatory predictability & stability

NRC Endorsement Process: Rulemaking Most formal of NRC endorsement processes About 1% of cited standards Standards endorsed in rulemaking process become licensee requirements Backfit Rule considered Includes public comment and rigorous reviews Takes 2-3 years to complete Finish Start Stable & Predictable Regulatory Basis Proposed Rule Final Implementation 2 years Companion Regulatory Guidance

Special Rulemaking: 10 CFR § 50.55a Incorporates by reference and requires use of ASME Codes: ASME BPV Code, Section III for design ASME BPV Code, Section XI for in-service inspection ASME OM Code for in-service testing Approves, conditions, or disapproves use of ASME Code Cases, via 3 referenced Regulatory Guides Regulatory Guide 1.84 (Section III) Regulatory Guide 1.147 (Section XI) Regulatory Guide 1.192 (OM Code) Incorporates by reference two IEEE Standards for Nuclear Power Generating Stations: IEEE-279, -603

Regulatory Guides & SRPs Guidance to applicants - describes methods that the staff considers acceptable for use in implementing regulations Not substitutes for regulations; compliance is not required Typically have forward-fit applicability; not a backfit Program managed by NRC Reg Guide branch Includes ACRS, CRGR, OGC reviews and public comments Nominally 11 months to revise or issue a RG Large percentage of standards cited by NRC in RGs Best repository of the current staff positions & standards SRPs Guidance to NRC staff (not an endorsement, per se) Only updated intermittently, as determined by NRC offices

How to get NRC to review your std? One process Send a letter to the NRC Standards Executive (Mike Case); Reg Guide branch coordinates response across NRC offices Issues: Reviewing is separate from endorsing; based on review, need NRC technical lead to initiate RG update; SRP only updated intermittently Better process Get an NRC representative to participate in developing the standard Get an informal commitment from the NRC representative to consider the standard in a RG or SRP Send a letter to the NRC Standards Executive Issue: More likely to get NRC tech lead to initiate RG update

How to get NRC to review your std? Another process Reg Guide branch established a web site for feedback on RGs in October 2012 at http://www.nrc.gov/reading-rm/doc-collections/reg-guides/contactus.html Reg Guide branch initiated a system of periodic (5-year) reviews of RGs (~450 RGs) in May 2012 Comments reviewed upon receipt, but will be fully evaluated during the next periodic review of the affected guides Issues: Delayed feedback on acceptability of standard; no direct feedback if NRC decides not to update the RG

FAQs It’s newer! Why doesn’t NRC review & endorse it? Has NRC been asked? How? Resource decision (Value = Benefits vs. costs) What are the new technical or regulatory issues that are addressed? How significant are they? Who do the issues affect and to what extent (license applications or NRC inspections)? What are the NRC resources needed to review and update? Are there relaxations/degradation of safety margins? Why does NRC stay with older standards? Adequate for safety, consistent with NRC mission Little or no demand from end users (license applications) Limited resources to review and update

How to get NRC to review your std? Make it worth it for NRC to review & endorse! Qs to address in letter or comment on NRC web site: What rules and regulations does this standard support (e.g., 10 CFR 5.XX)? What NRC guidance currently endorses the standard (e.g., RG X.XX and SRP Section X.X.X)? What were the significant technical changes in the standard? What NRC regulatory gaps does the standard address? What applicants/licensees are affected by the standard? Were any NRC representatives involved?

How to get NRC to review your std? Good example in ANS letter to NRC on 11/6/2012 (ADAMS ML123130021). From the foreword of ANSI/ANS-2.21-2012, “Criteria for Assessing Atmospheric Effects on the Ultimate Heat Sink”: 10 CFR 50, Appendix A, GDC 2, “Design Bases for Protection Against Natural Phenomena” requires….. Existing regulatory guidance (i.e., Regulatory Guide 1.27, “Ultimate Heat Sink for Nuclear Power Plants”) is dated (1970s vintage) and does not provide guidance on how to calculate effects to ultimate heat sinks using atmospheric parameters. This standard establishes criteria for use of meteorological data collected at nuclear facilities to evaluate the atmospheric effects from meteorological parameters [e.g., dry-bulb temperature/wet-bulb temperature differential, precipitation, wind speed, short wave radiation, incoming solar (i.e., short wave) radiation, surface water temperature, and atmospheric pressure] on ultimate heat sinks.

FAQs Why does NRC take so long to endorse a std? Technical basis development needed for anything? (1-2 years) Draft Guide (DG) developed (5 months) Multiple NRC offices commit resources & agree on positions RG branch QA & regulatory review ACRS screening review OGC review Public comment period (2 months) Final RG developed (4 months) Multiple NRC offices commit resources & address comments ACRS review Longer time than informal process, but higher quality, durable, more stable. Analogous to consensus stds? RGs supporting a rule use the rulemaking process

NRC participation in SDOs Do NRC representatives participate in your SDO? Individual NRC offices (NRR, NRO, NMSS, FSME, RES) determine participation by their staffs Recent initiatives by Reg Guide branch: Develop and maintain lists of NRC participants in various SDOs More consistent letters nominating NRC participants in SDOs Coordination meetings between offices on issues Assessing value of “Top 10” lists or prioritization of issues Assessing value added of NRC participation Results in standards that NRC endorses Leads to NRC awareness/training of contemporary issues

Items for Discussion What are the SDOs doing to get NRC participation? What are SDOs doing to let NRC know plans for developing standards? Do SDOs systematically look at addressing NRC exceptions to standards in SRPs and RGs? What more should we be doing? ANS meeting with NRC on 11/30 One WFN, Rm O-4B06, 8-12:00 AM Purpose is to assess whether ANS (and other SDOs) can contribute to NRC Tier 3 Fukushima response