Workshop Report Berryman - Carcassi - Kasmir - Shroff.

Slides:



Advertisements
Similar presentations
Knowledge Management at the Gordon – Staff Portal Project Presented by Deirdre Carmichael 12 September 2008.
Advertisements

V4 Status and Workshop Report CSS, DISCS, an V4 team.
CSS: where do we want to go? Gabriele Carcassi Contributions from: Gabriele Carcassi, Kunal Shroff – BNL Jan Hatje – DESY Kay Kasemir – ORNL.
CSS Developments at BNL / NSLS-II Gabriele Carcassi Feb
AccelUtils Gabriele Carcassi, Kunal Shroff – BNL Eric Berryman, Robert Gaul – MSU Ralph Lange – HZB.
Visual Studio Online. What it Provides Visual Studio Online, based on the capabilities of Team Foundation Server with additional cloud services, is the.
Mike Azocar Sr. Developer Technical Specialist Microsoft Corporation
It’s tough out there … Outperforming teams are collaborate extensively with their counterparts 54 % more likely to Developers 26.7% No executive.
Data Sources & Using VIVO Data Visualizing Scholarship VIVO provides network analysis and visualization tools to maximize the benefits afforded by the.
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
ISO 9001:2015 Revision overview - General users
Standardize on Team Foundation Server across the enterprise with Teamprise Corey Steffen General Manager
1 AMMW2013 workshop 13 d – 15 th of November, 2013 Asset management tools: use and improvement in SOLEIL – P. Betinelli Asset management tools: use and.
Olog Kunal Shroff Eric Berryman Dejan Dežman Arman Arkilic.
Managed by UT-Battelle for the Department of Energy Open XAL Open Development of the XAL Accelerator Application Framework Christopher K. Allen Tom Pelaia.
ISO 9001:2015 Revision overview - General users
ORNL is managed by UT-Battelle for the US Department of Energy Control System Studio: Overview Kay Kasemir, SNS/ORNL June 2014.
Control System Studio: An Integrated Toolset Kay Kasemir, ORNL/SNS CS-Studio, 2014 FRIB1.
Tools Strategy for BNL and MSU Gabriele Carcassi - BNL Eric Berryman - MSU.
Managed by UT-Battelle for the Department of Energy Kay Kasemir ORNL/SNS 2012, April at SLAC Control System Studio - Introduction.
UE Approach towards AUBI Design Patterns Adesh Singh 28 May 2008.
ETICS2 All Hands Meeting VEGA GmbH INFSOM-RI Uwe Mueller-Wilm Palermo, Oct ETICS Service Management Framework Business Objectives and “Best.
1 BROOKHAVEN SCIENCE ASSOCIATES EPICS Core (and other development efforts) L. Dalesio. EPICS April 25, 2013.
University of Wisconsin System HRS Project Update to ITC November 19, 2010.
A DΙgital Library Infrastructure on Grid EΝabled Technology ETICS Usage in DILIGENT Pedro Andrade
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
TFS 2010 What’s new and interesting. Key Items Agile Planning Tools – Slides #3-#6 Improved parallel development - Slides #7-#8 Continuous Integration.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window Aug 14, 2009.
CSS – Control System Studio
Visual Studio Online Writing code in a browser or is there more to it?
CSS Build and Update System Kunal Shroff EPICS Spring Collaboration Meeting, June 2010 Aix-en-Provence.
Managed by UT-Battelle for the Department of Energy Kay Kasemir ORNL/SNS 2012, January 9-12 at NSRRC, Taiwan Control System Studio Training.
QOS_ISO/ TS_20021 BSC Balanced ScoreCard QOS Quality Operating System.
Autograder Better management and evaluation of lab assignments.
Brookhaven Science Associates U.S. Department of Energy Leveraging the Management Review Process of ISO and OHSAS for Facility-level and Institutional-level.
Managed by UT-Battelle for the Department of Energy Kay Kasemir ORNL/SNS April 2013 Control System Studio, CSS Overview.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
It’s tough out there … Software delivery challenges.
Project Plan and Schedule Goal: Agree on project plan and schedule.
Copyright © 2010 Obeo, Made available under the Eclipse Public License v SCA Tools (Helios) Release Review Planned Review Date: June 11, 2010.
Time to answer critical and inter-related questions: Whom will we serve? What will we offer? How will we serve them?
Contribute to CSS Xihui Chen April, 2013.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
ONE LAPTOP PER CHILD This works are licensed under a Creative Commons Attribution 2.5 License. One Laptop per Child Builds, Customizations and Localization.
ESS Integrated Control System Software Core Components S.Gysin
Baseline The baseline at July Previously there was a lack of consistency for: Pathways into specialist clinics; Policies, procedures and guidelines.
CSS Build and Update System Kunal Shroff EPICS Fall Collaboration Meeting, June 2010 Aix-en-Provence.
Introduction to Control System Studio (CSS) Kay Kasemir, Kunal Shroff EPICS Fall Collaboration Meeting, October 2011 PSI.
International Planetary Data Alliance Registry Project Update September 16, 2011.
The StratusLab Distribution and Its Evolution 4ème Journée Cloud (Bordeaux, France) 30 November 2012.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
Release Review – Planned Review Date: 01/9/2011 Communication Channel: Greg Wilkins, Jesse McConnell, Hugues Malphettes.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC , the State of Michigan.
Tools and technology usage in PFMS application lifecycle management process LEPL Financial-Analytical Service, Ministry of Finance October, 2015 Dimitri.
AccelUtils Gabriele Carcassi, Kunal Shroff – BNL
ISO 14001: 2004 Environmental Management Review Presentation
District And Club database
Core Management Evaluation
Testing Plan Workshop Santa Cruz County BH
Health Resources and Services Administration (HRSA)
Validation & conformity testing
AGILE PRODUCT ROADMAP AGILE PRODUCT ROADMAP
TFS from on-prem to the cloud with Azure DevOps Services
Git Best Practices Jay Patel Git Best Practices.
Transitioning into Prime Pilot Phase & Implementation Phase
Paul S Waters Getting Git.
Eclipse Marketplace Client (MPC) Release and Graduation Review
Presentation transcript:

Workshop Report Berryman - Carcassi - Kasmir - Shroff

Management Review Meeting Review of the Quality Management System by management regarding: suitability adequacy effectiveness Opportunities for improvement resources needed Need for changes including Quality Policy and Objectives Meeting Outcome

Quality Policy and Objectives CS-Studio Quality Policy Through a strategy of continuous improvement and teamwork, the Control System Studio Collaboration is dedicated to supplying tools for control systems, data integration and data visualization to enable our users to achieve their scientific objectives. The foundation for achieving our commitment is based on: understanding and meeting the requirements of our users, continuously improving all processes related to the Control System Studio product, effectively utilizing the creative talents in the collaboration

Quality Policy and Objectives CS-Studio Objective The fraction of releases per site deployed vs. releases considered for deployment will be a minimum of 75%

Process Performance and Product Conformity Goals for 3.2 Release We have made good progress of implementing a single connection management layer (pvmanager). BOY’s implementation still needs work. (stated at diamond) We have created a single product, with standard features. SNS, KEK, NSLS2, FRIB and CS-Studio products have been updated to contain no java code. (stated as project) We have coordinated monthly releases, with a monthly planning meeting (the last 5 months). (stated at diamond) Moved to repo github Moved to github issues Moved wiki to github Progress toward Feature build Progress to extract 3rd party code from repository - Investigate 'Orbit' Update Logbook API to support BNL/FRIB Olog Autocomplete infrastructure {pv, pvmanager, channelfinder/db, logbook}

Process Performance and Product Conformity Autocomplete

Status of Corrective and Preventative Actions

3.2.6: 7 closed (May) 3.2.7: 9 closed; 250 commits (Jun) 3.2.8: 11 closed; 135 commits (Jul) 3.2.9: 11 closed; 178 commits (Aug) : 13 closed; 218 commits (Sept) : 1 closed, 16 open; 7 new  Oct release date 3.2.x release is a year late (September 2012) Preventative action: Release Manager will be reviewed by the core developers every 6 months

Audits Vasu Vuppula, Facility for Rare Isotope Beams, will perform the first internal audit

Customer Feedback Analysis Website hits in September 402 people 739 visits 1548 actions Census 16 developers 16 users 22 different institutions

Customer Feedback Custom OPIs to acknowledge alarms

Customer Feedback

Simplify making OPIs that iterate a template

Customer Feedback Screens can not depend on just color to relay information

Decisions and Actions for Improvement At end of October Close 3.2.x development and only allow hotfixes Remaining requirements to mark 3.2.x as a stable release Bug Fix and patches BOY script performance (set 10Hz max update limit) PVManager functions Autocomplete New repository rules All commits will be done with a pull request All commits must reference a issue number Release Manager 6 month review

Decisions and Actions for Improvement 3.3.x Goals Focus on BOY stability Standardize GUI testing across labs Prune the repository of plugins that; lack a maintainer or are unused Simplify and improve project processes Transparency Iterations with audits Take advantage of existing github features Connecting issues and commits Github pull request Improve customer feedback Survey

Resource Needs Kunal Shroff (NSLSII) will be the interim maintainer for BOY RCP RAP support BOY script support