1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

Joint WTO/WB Regional Workshop on Procurement Reform and Transparency Session 4: Objectives of Procurement Regimes and Non-Discrimination and Preferences.
Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
STANDARD BIDDING DOCUMENT PROCUREMENT OF GOODS (FOR VALUE UP TO NU.0.25 MILLION) Presentation by: Tshewang Gyeltshen.
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – February 2004.
Session 8 Implementing PPPs
Tendering Procedures in Lagos State under the Public Procurement Law 2011 Presented By Engr. Akin Onimole | February 13, 2013 GM/CEO, Public Procurement.
Inter-American Development Bank Procurement of Goods, Works and Consulting Services in projects financed by IDB Washington, DC – July 2004.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Marcy Mealy Procurement Specialist CDBG Program
February 27 - March 3, 2006, Zagreb, Croatia.
1 Business Opportunities Istanbul, Turkey 30 April 2010 Asian Development Bank.
Janaury The “World Bank Group”
Very Small-Value Procurement Under World Bank/IDA Small Grants, Loans and Credits Zagreb Regional Procurement Training Feb. 27 – March 3, 2006.
1 PROCUREMENT AUTHORITY AND RESPONSEBILITIES Dr. Fred Mugambi Mwirigi JKUAT.
1 Bid evaluation - Works  Clarification of bids ( if necessary)  Determination of responsiveness “Substantial” responsiveness No material deviations.
1 1 Module II. Bidding and Evaluation Process I.Bidding documents (Stages of bidding & preparation of bidding document) II.Bid evaluation methods (principles.
Module 10 Organizing Procurement Session 10.7 Procurement of Goods:
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
Conditions and Peculiarities of Submission of Complaints in Ukraine. Typical Errors/Infringements Relating to Submission of Complaints Kyiv, April.
PROCUREMENT POST REVIEW OF WORLD BANK FINANCED PROJECTS IN INDIA October 11, 2007.
Overall Considerations
1 PRESENTATION ON TENDERING REQUIREMENTS Presented by Kenya National Highways Authority (KeNHA) Team.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
Public Procurement Procedure – Bidding Documents
TENDERING PROCEDURE IT- 3927/EN
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems Walkthrough February 27 – Mar 3, 2006, Zagreb, ECA.
United Nations Procurement Division
CONSTRUCTION CONTRACTS DOCUEMENTS
Energy for the Future Belene Nuclear Power Plant Project Status.
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems General Conditions of Contract and Special Conditions of Contract.
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
Introduction Procurement of Consultant Services (based on PPA 2004 and Best Practices) Presented by: NM Lema Macrh, 2013.
1 Instructions to bidders  Eligibility  Procedure for clarifications  Bid preparation - form  Number of copies, addressee  Language  Pricing and.
TRAINING PROGRAM PROCUREMENT GUIDELINES IMPORTANT ASPECTS 1.
KENYA NATIONAL BUREAU OF STATISTICS
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Procurement in Projects Financed by Islamic Development Bank Presented during Project Start-up Workshop September 2015, Jakarta, Republic of Indonesia.
FOURTH AFRICA CENTERS OF EXCELLENCE (ACE) PROJECT WORKSHOP FIDUCIARY COMPLIANCE – PROCUREMENT November 17-19, 2015 Cotonou Presented by : Wole Afuye &
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems Invitation to Bids (ITB) and Bid Data Sheet (BDS) February 27- Mar.
Public Procurement Principles and Applications Basic Level: Trainer’s Manual Inter – American Development Bank Chapter 2: Procurement of Goods and Works.
Inter-American Development Bank Works, Goods and Consulting Services in projects financed by IDB April PROCUREMENT.
Get to know the procurement principles & Ins & Outs of Procurement Policies.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
The Private Sector and the Caribbean: Working Together for Development June 23, 2010 Procurement Policies and Procedures for Goods, Works and Consulting.
HOW TO PROTECT YOUR INTEREST IN A SALE CONTRACT Focus on what you “get” when you sign!
PRE-BID MEETING CONSTRUCTION OF THE MEDUPI-BORUTHO TRANSMISSION LINE PRE-BID MEETING WORLD BANK GUIDELINES Presented by: Brendah Shange.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
BOS 1 Procurement of Goods and Works Asian Development Bank Business Opportunities.
마스터 제목 스타일 편집 Overview of K-MAS Commercialization & Competitiveness Products with similar quality, function and specification Standardized specification.
THE PROCUREMENT PROCESS (PROCUREMENT METHODS, PROVISIONS ON PROCEEDINGS AND STANDARD DOCUMENTS)
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
Assessment of the Bidding Process in Construction Project ABDULLAH H. ABU ZANT. AYMAN K. ILAIWI. MOHAMMED FADEL. SODQI M. ALHNAINI. AN-NAJAH NATIONAL UNIVERSITY.
FIDIC Tendering Procedures
Content of Tender Dossier - Instructions to Tenderers - Tenders
Content of Tender Dossier Instructions to Tenderers
Evaluation Grids Evaluation Grids.
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Bid Evaluation and Award
Request for Proposal & Proposal
Training on Dr. Sudhir Kumar Grid Connected Rooftop PV Systems
WORLD BANK Evaluation Process (Goods/Works)
PROCUREMENT POLICIES AND GUIDELINES
BIDDING DOCUMENTS AND MAIN FEATURES
INTERNATIONAL COMPETITIVE BIDDING (ICB)
Enhancing Procurement Efficiency: Litigation Issues, Standard Bidding Documents and eGP Shakti Prasad Shrestha March 21, 2018.
Grant Implementation Agreement (GIA)
Procurement of Works -1 Ghana Shyam Gautam.
Presentation transcript:

Transparency International-National Accountability Bureau-World Bank Capacity Building and Training on Procurement Training the Trainers Workshop Transparency International-National Accountability Bureau-World Bank   September 19-21, 2005 Karachi By Uzma Sadaf

Objectives Economy, efficiency, and quality of services. Giving equal opportunity to all eligible bidders to compete in providing goods, works, and services financed by the Bank. Encouraging domestic contracting and manufacturing industry, and consultancy services. Transparency in the selection process.

Functions of World Bank To provide funds for development projects To provide policy advice and technical assistance To promote investment in developing countries

while implementing a project . . . a) Responsibility of implementation rests with the Borrower. b) The Bank has to ensure that Loan/Credit are used for the purposes intended with Economy Efficiency Transparency

Goods, Works, and Consultancy Services …. while implementing projects… c) Accordingly, Bank has developed Guidelines for procurement of Goods, Works, and Consultancy Services d) Bank Guidelines explain the various procedures acceptable for procurements as given in the Legal Agreement.

Ensuring satisfactory implementation; …. while implementing projects… e) Role of Procurement Ensuring satisfactory implementation; Ensuring speedy transfer of resources by way of disbursement; Achieving economy and efficiency; and Ensuring success of the Project. Developing Capacity of Sound Public Procurement

g Bank’s Considerations for Procurement …. while implementing projects… g Bank’s Considerations for Procurement Need for economy and efficiency in the execution of the project giving all eligible bidders from developed and developing countries equal opportunity to compete encouraging the development of domestic contracting and manufacturing industries transparency in the procurement process.

Processing for Procurement Legal Agreement Provides guidelines to Adopt the Procurement Procedure (cost, complexity, frequency) Provides Bank’s Prior and Post Review thresholds Guidelines for Selection of Goods & Works and Consultants Provides Steps Required for Implementing various procurement procedures. World Bank Standard Documents Pre-qualification, bidding, contracts, RFP etc. ICB: 2.0 in guidelines Type of contracts depends on nature of work. Large Turn key projects. Two stage bidding etc, But this project does not plan any procurement under this method. NCB. 3.3 Is the competitive bidding procedure normally used for public procurement in the borrower’s country for good for which by their nature, are unlikely to attract foreign competition. These procedure shall be reviewed to assure economy, efficeincy. Used where contract value is small, works are scattered, are labor intensive and are available at prices below international market. Community Participation projects of the PPAFare covered by this type of bidding procedure. (see Proc plan) No Gen Proc Notice (3.4) Only national press or official gazette Adequate response time Provide adequate competition to ensure reasonable prices National Shopping Procurement method based on price quotations obtained from several suppliers, usually at least three. Appropriate for off-the-shelf goods eg. Computers, office equipment Direct Contracting (single source) without competition Existing goods or works contracts extended or goods or works of similar nature. Where no demonstrable advantage in obtaining further competitive prices. Where such instances are anticipated, provisions are to be made in contract. OEM Spares Proprietary items

Legal agreement This Agreement is between the Islamic Republic of Pakistan and IDA/IBRD – is a treaty subject to International Law. As a treaty the Legal Agreement takes precedence over local law. The Agreement governs the legal relationship between the borrower and the Bank. Guidelines are applicable to the extent provided in the Legal Agreements.

Procurement guidelines Works and Goods: Procurement under IBRD Loans and IDA Credits May 2004 Consultancy: Selection and Employment of Consultants by World Bank Borrowers May 2004  

World Bank Standard Documents Works and Goods: Prequalification documents, Bidding documents, Bid evaluation report, Contract Consultancy: Expression of interest (for short-listing), Request for proposals, Evaluation report, Contract 

Methods Defined under the World Bank Guidelines Procurement of Goods Methods Defined under the World Bank Guidelines

Methods of procurement International Competitive Bidding (ICB) National Competitive Bidding (NCB) Shopping ICB: 2.0 in guidelines Type of contracts depends on nature of work. Large Turn key projects. Two stage bidding etc, But this project does not plan any procurement under this method. NCB. 3.3 Is the competitive bidding procedure normally used for public procurement in the borrower’s country for good for which by their nature, are unlikely to attract foreign competition. These procedure shall be reviewed to assure economy, efficeincy. Used where contract value is small, works are scattered, are labor intensive and are available at prices below international market. Community Participation projects of the PPAFare covered by this type of bidding procedure. (see Proc plan) No Gen Proc Notice (3.4) Only national press or official gazette Adequate response time Provide adequate competition to ensure reasonable prices National Shopping Procurement method based on price quotations obtained from several suppliers, usually at least three. Appropriate for off-the-shelf goods eg. Computers, office equipment Direct Contracting (single source) without competition Existing goods or works contracts extended or goods or works of similar nature. Where no demonstrable advantage in obtaining further competitive prices. Where such instances are anticipated, provisions are to be made in contract. OEM Spares Proprietary items

Steps of a procurement process Notification and advertising Pre-qualification of bidders (for health sector goods) Issuance of bidding documents to (pre-qualified) firms Bid opening Bid Evaluation Selection of lowest evaluated responsive bidder Signing of Contract

Notification and Advertising Draft General Procurement Notice (all planned projects) is published in UNDB. Specific Procurement Notice for bidding is published for a specific project in Atleast one nationally circulated newspaper, or Official gazette, or Electronic portal with free access, and UNDB online and in dgMarket. Minimum response time is 6 weeks for ICB and 4 weeks for NCB.

Standard Bidding Documents Fair (terms and conditions should be balanced) Non-restrictive (local registrations, response time) Clear and comprehensive (adequate information, requirements, evaluation criteria)

Standard Bidding Documents (ICB) Bidding Procedures Instructions to bidders (ITB) Bid data sheet (BDS) Evaluation and qualification criteria Bidding Forms Eligible countries Supply Requirements Schedule of Requirements Contract General Conditions of Contract Special Conditions of Contract Contract Forms

Standard Bidding Documents (NCB) Part I (fixed) Instructions to bidders (ITB) General Conditions of Contract Part II (Procurement Specific Provisions) Invitation for Bids (IFB) Bid data sheet (BDS) Special Conditions of Contract Schedule of Requirements Technical Specifications Bidding Forms Eligibility

Standard Bidding Documents Instructions to Bidders (fixed) General (Scope of Bid, source of funds, eligibility) Contents of Bidding Documents (list of documents, clarifications, amendments) Preparation of Bids (cost, currency, documents, period of bid validity, format of signing) Submission and Opening of Bids (sealing & marking, deadline, late bid, withdrawal, opening) Evaluation & Comparison of Bids (responsiveness, evaluation criteria and procedure, ) Award of Contract (award criteria, notification, signing of contract, securities)

Standard Bidding Documents Bids Data Sheet (BDS) (Procurement Specific) General (name of purchaser, project etc.) Contents of Bidding Documents (list of documents) Preparation of Bids (cost, currency, documents, period of bid validity, format of signing) Submission and Opening of Bids (address of submission, last date ) Evaluation & Comparison of Bids (currency conversion, domestic preference, evaluation criteria and procedure ) Award of Contract (variation in quantities)

Evaluation and Qualification Criteria Standard Bidding Documents Evaluation and Qualification Criteria Post-Qualification Criteria Manufacturing or supply experience, financial, technical and production capabilities, authorization from a manufacturer). Evaluation Criteria domestic preference (ICB) Quoted Cost (DDP, EXW, CIP, CIF, etc.) plus incidental costs, delivery schedule, deviation in payment schedule spare parts, O&M cost, performance and productivity, technical specifications

Standard Bidding Documents Bidding Forms Bid Forms Price Schedule Form Bid Security Form Manufacturer’s Authorization Form

Schedule of Requirements Standard Bidding Documents Schedule of Requirements List of goods and delivery schedule List of related services and completion schedule Technical specifications Drawings Inspection and tests

General Conditions of Contract (FIXED) Standard Bidding Documents General Conditions of Contract (FIXED) Clauses Operational Clauses Definitions Rights and obligations Delivery and risk transfers Terms and currencies of payment Mode & form of dispute settlement Governing language Applicable law

General Conditions of Contract (FIXED) Standard Bidding Documents General Conditions of Contract (FIXED) Protective Clauses Performance Security Retention of Payments Insurance Inspection and tests Warranty Protection against third party infringement suits Force Majure

General Conditions of Contract (FIXED) Standard Bidding Documents General Conditions of Contract (FIXED) Variations Quantity changes Adverse physical conditions Price adjustments Remedies Forefeiture of Performance Security Damages, penalties for delays Suspension and termination Non-payments/delays in approvals

Special Conditions of Contract (VARIABLE) Standard Bidding Documents Special Conditions of Contract (VARIABLE) Performance Security Inspection and tests Delivery and documentation Payment Schedule Insurance Liquidated Damages Warranties Applicable Law

Standard Bidding Documents Contract Forms Form of Contract Performance Security Advance Payment Security Form

BID OPENING Public Opening Announce the requisites (bid security, modification, withdrawal etc.) Announce the price Record the requisites Only bids announced in public opening shall be further considered for evaluation Late Bids are not Considered

Bid Evaluation Selection of the lowest evaluated responsive bidder Evaluation is to be based upon the contents of the bid itself. Evaluation is to be based only upon the criteria clearly stated in the Bidding Documents. Ideally all factors of evaluation criteria should be quantifiable in monetary terms.

Bid Evaluation Clarification Permissible and warranted Should be in writing - Should not Change Substance of Bid or Price Preliminary Examination (Substantial Responsiveness) Eligibility requirements Bid is signed Bid Security Required authorization Major Deviations from Bid Conditions Computational Errors

Major Deviations - Scope, Quality and Performance Affected - Employer’s rights or supplier’s obligations limited in substantial way - Rectification would unfairly affect ranking of other substantially responsive bids

Examples of Major Deviations Late Bid Submission Ineligible Bidder Unsigned Bid Unacceptable Bid Security Lesser bid validity period Price Adjustment Vs Fixed Price Non Conforming delivery schedule Unacceptable Subcontracting Deviations from critical provisions - Applicable Law - Taxes and Duties - Defect Liability - Functional Guarantees - Patent and Indemnity - Limitation of liability

Debatable Deviations Different Payment Terms Information given on different format Different Payment Terms Non Compliance with Local Regulations - Labour, Import, Duties, Taxes, etc. Completion/Maintenance Periods Omission of (Minor) Items Different Codes/Standards - Materials, Workmanship, Design, etc.

and if such deviations otherwise acceptable Bids with Deviations May be considered substantially responsive if deviations can be assigned monetary value to be added as penalty for evaluation purposes and if such deviations otherwise acceptable

Detailed Bid Evaluation (Only for Substantially Responsive Bids) Arithmetic Errors (If discrepancy between words and figures, words would prevail) Currency Conversion (date as given in the Bid Docs.) Evaluation shall exclude Sales & other taxes payable if contract signed (local goods) Customs and import taxes payable if contract signed (goods imported or to be imported)

Detailed Bid Evaluation (Only for Substantially Responsive Bids) Correction of Price (As given in the Evaluation criteria) - incidental cost added - addition to cost for delayed delivery - adjustment for alternate payment schedule - addition of cost of spare parts - operating & maintenance cost - adjustment for performance and efficiency - adjustment for any specific additional criteria as given in the bid documents.

Award of Contract Lowest evaluated responsive bidder Notification of award (notify successful bidder , publish results of evaluation, NOA is binding until contract is signed) Signing of Contract (within 28 days of notification of award) Performance Security (28 days of notification of award) Return Bid Security of all Bidders If lowest evaluated responsive bidder fails to sign contract/submit performance Security, invite the 2nd lowest evaluated responsive bidder.

ISSUES Validity of Bids and Bid Securities Extended Delivery Period Bid Forms not completely filled Authorization letter not signed Experience Certificate not included Delayed Decision of award Specifications & Experience Requirements

ISSUES Validity of Bids and Bid Securities - Must be valid for the period given in the BDS - Extension may be requested; bidder has a right to refuse. Extended Delivery Period - Acceptable if BDS gives the option to evaluate delayed delivery. - If BDS mentions a fixed delivery period, it is a major deviation.

ISSUES Bid Forms not completely filled - May be acceptable if ALL information is given in a signed letter Authorization letter not signed - A certificate may be acceptable Experience Certificate not included - Bidder maybe asked to submit later

ISSUES Delayed Decision of award - Award should be made within the bid validity period - Incase of delay, ALL bidders should be requested to extend their bid validity. - Unreasonable extension is not a good practice. - Delays may entail increase in cost.

ISSUES Specifications & Experience Requirements Specifications should be clear and suiting the requirement. - A market survey prior to drafting specifications is always helpful - Qualification requirement of suppliers should be realistic

A Good Practice Assess capacity of prospective bidders and disseminate information Pre-bid Meetings Addendum Prompt evaluation and decision

Procurement of Goods SHOPPING

Shopping Three Quotations are required for comparison Advertisement not necessary. Written request may be made. Good practice is to approach more than three suppliers Conditions (delivery schedule, Specifications etc.) given If three responses are not received an extension may be given.

we may share views now…………. Thank you we may share views now………….