1 February 27 - March 3, 2006, Zagreb, Croatia.
WORLD BANK EVALUATION GOODS Seminar on Procurement of Goods, Works and Consultancy Contracts financed from World Bank Loans and IDA Credits, February 27 - March 3, 2006, Zagreb, Croatia.

2 BID EVALUATION OBJECTIVE SECURE GOODS/SERVICES AT MOST ECONOMICAL COST
PRICE ONLY ONE FACTOR OTHER FACTORS COMMERCIAL TIME OF DELIVERY/COMPLETION TERMS OF PAYMENT TERMS OF GUARANTEE

3 BID EVALUATION OTHER FACTORS TECHNICAL
TECHNICAL MERITS, CAPACITY, PRODUCTIVITY OPERATING COST MAINTENANCE COST EFFICIENCY RESALE VALUE CRITERIA SHALL BE STATED IN BID DOCUMENTS IDEALLY ALL FACTORS QUANTIFIED IN MONETARY TERMS

4 EVALUATION STEPS BID OPENING EXAMINATION COST COMPARISON PRICE
PRICE AND COMMERCIAL PRICE, COMMERCIAL AND TECHNICAL LOWEST EVALUATED BID POST QUALIFICATION AWARD RECOMMENDATION EVALUATION REPORT NO OBJECTION DEVIATIONS

5 BID OPENING PUBLIC OPENING RATIONALE AND MERITS MINUTES TO BE RECORDED
SINGLE ENVELOPE - SINGLE STAGE BID FORM TECHNICAL DATA BID PRICE SCHEDULE BID SECURITY

6 BID OPENING TWO STAGE BIDDING INDUSTRIAL PROJECTS - COMPLEX EQUIPMENT
PROJECTS WITH DIFFERENT TECHNICAL SOLUTIONS FIRST STAGE INVITE TECHNICAL PROPOSALS DISCUSS AND FINALIZE TECHNICAL SPECS SECOND STAGE INVITE PRICE BIDS ON REVISED SPECS

7 PRELIMINARY EXAMINATION
CLARIFICATION PERMISSIBLE AND WARRANTED CANNOT CHANGE SUBSTANCE OF BID OR PRICE CONFIDENTIALITY IMPORTANT EXAMINATION OF BIDS IS BID COMPLETE? SIGNED? IS BID SECURITY ATTACHED? COMPUTATIONAL ERRORS MAJOR DEVIATIONS FROM BID CONDITIONS

8 PRELIMINARY EXAMINATION
TECHNICAL SCRUTINY - SUBSTANTIAL RESPONSIVENESS DETAILED EVALUATION ONLY FOR SUBSTANTIALLY RESPONSIVE BIDS

9 DEVIATIONS UNACCEPTABLE LATE BID UNSIGNED BID INADEQUATE BID SECURITY
DIFFERENT PREQUALIFIED FIRMS AND BIDDERS DIFFERENT PRICE CONDITIONS UNACCEPTABLE ALTERNATIVE, TIMING AND PHASING

10 DEVIATIONS UNACCEPTABLE SUB-CONTRACTING
QUALIFICATION OF ARBITRATION RULES UNACCEPTABLE APPLICABLE LAW

11 DEVIATIONS FOR CONSIDERATION DIFFERENT PAYMENT TERMS
ALTERNATIVE METHODS/BIDS MINOR OMISSIONS LIMITATION OF LIABILITIES LIQUIDATED DAMAGES

12 COMPARISON OF BIDS - CONVERSION TO COMMON CURRENCY
OBJECT TO DETERMINE LOWEST EVALUATED BID ON DATE SPECIFIED BID PRICE CONVERT INTO AMOUNTS PAYABLE IN EACH CURRENCY COMMON CURRENCY BORROWER’S OR ANY CURRENCY SUCH AS USD OR EURO EXCHANGE RATES OFFICIAL SOURCE SUCH AS CENTRAL BANK AS ON ANY SPECIFIED DATE NOT EARLIER THAN 4 WEEKS PRIOR TO BID CLOSING NOR LATER THAN ORIGINAL DATE FOR EXPIRY OF BID VALIDITY DATE TO BE CLEARLY SPECIFIED IN BID DOCUMENTS

13 EXAMPLE: CURRENCY CONVERSION (EQUIPMENT)
A B C 1. EVALUATED US$6, EURO15, L3, FF15,000 CONVERTED TO LOCAL CURRENCY PESOS AT EXCHANGE RATE ON DATE OF BID 63, , ,000 OPENING RANKING AT EXCHANGE RATE ON DATE OF , , , DECISION RANKING AT EXCHANGE RATE ON DATE OF , , , EXPIRY OF BID VALIDITY RANKING AT EXCHANGE RATE ON ACTUAL DATE , , , OF DECISION WHICH IS 6 MONTHS AFTER EXPIRY OF ORIGINAL VALIDITY PERIOD RANKING

14 COMMERCIAL FEATURES PRICE
ADJUST BASIC PRICE FOR FEATURES, OPTIONS, ETC. TO MAKE BID PRICES COMPARABLE PRICE ADJUSTMENT OVER CONTRACT PERIOD IGNORE DELIVERY POINT ADD LOCAL TRANSPORTATION

15 COMMERCIAL FEATURES TIME OF DELIVERY
EVALUATE LOSS OR GAIN BY LATE OR EARLY DELIVERY WARRANTY EVALUATE VARIATION PAYMENT TERMS EVALUATE VARIATIONS AT SPECIFIED INTEREST/DISCOUNT RATE

16 BID EVALUATION FOR URBAN BUSES
A B DOMESTIC BID FOREIGN BID PRICE EX-FACTORY/FOB PES900, EURO100,000 OCEAN FREIGHT AND INSURANCE EURO5,625 PRICE EXFACT./CIF PORT OF ENTRY PES900, EURO105,625 PRICE EXFACT./CIF CONVERTED TO 45, , COMMON CURRENCY (USD) INLAND TRANSPORTATION ,500 EVALUATED COST DELIVERED AT , , SITE

17 BID EVALUATION FOR URBAN BUSES
A B DOMESTIC BID FOREIGN BID PENALTY FOR DEVIATION IN PAYMENT TERMS DELIVER/COMPLETION EVALUATION , WARRANTY TOTAL EVALUATED COST , ,350 PRICE PREFERENCE (15% OF CIF) ,337 EVALUATED COST WITH PREFERENCE , ,687 RANKING

18 EVALUATION CRITERIA TECHNICAL FEATURES
OPERATING COST FUEL TRAINING MAINTENANCE COST STANDARDIZATION RESALE VALUE/DEPRECIATED COST LIFE CYCLE COST OWNERSHIP COST CAPACITY PRODUCTIVITY

19 ON “LIFE CYCLE COST” BASIS
TOTAL EVALUATED INITIAL COST 46, ,350 (without preference) FUEL COST FOR 8 YEARS 52, ,000 (discounted to present value) MAINTENANCE COST FOR 8 YEARS 34, ,000 MINUS DEPRECIATED COST/ RESALE VALUE 2, ,000 LIFE CYCLE COST , ,350 DOMESTIC PREFERENCE , (15% OF CIF) EVALUATED COST WITH PREFERENCE , ,687 RANKING

20 LIFE CYCLE COST METHODS
COST TO OWN AND OPERATE ITEM DURING ITS USEFUL LIFE INITIAL PURCHASE PRICE ADJUSTED FOR EXTRAS, DELIVERY, VARIATIONS IN PAYMENT TERM, ETC. VALUE OF ADJUSTMENTS ADDED TO BID PRICE OPERATING COST DURING LIFE OF ITEM FUEL, SPAREPARTS, MAINTENANCE, (X YEARS) ANNUAL COSTS DISCOUNTED TO NPV OWNERSHIP COST DURING LIFE OF ITEM ECONOMICAL USEFUL LIFE (X YEARS) RESALE OR SCRAP VALUE DISCOUNTED TO NPV

21 LIFE CYCLE COST METHODS
EFFICIENCY COST METHOD CAPITALIZE DIFFERENCES IN EFFICIENCY IN OPERATION OF ITEMS, i.e. Boiler, Turbine, Transformer, etc., DURING LIFE PRODUCTIVITY COST METHOD DETERMINE LIFE CYCLE COST PER UNIT OF OUTPUT FOR COMPARISON PURPOSES LIFE CYCLE COST OF PLANT (X YEARS) NPV DIVIDED BY TOTAL UNIT OUTPUT OF PLANT

22 BID EVALUATION USING LIFE CYCLE COSTING FOR PROCUREMENT OF 100 HIGHWAY TRUCKS
RELEVANT PART OF THE BID EVALUATION CLAUSES IN THE BIDDING DOCUMENTS THE EVALUATION AND COMPARISON OF BIDS SHALL BE BASED ON THE LIFE CYCLE COST FOR THE VEHICLES DURING THE FIRST 6 YEARS, WORKED OUT IN THE FOLLOWING MANNER 1. INITIAL PRICE CIF PRICE QUOTED FOR TRUCKS OFFERED FROM ABROAD EX-FACTORY/EX-SHOWROOM PRICE FOR VEHICLES OFFERED FROM WITHIN THE COUNTRY 2. OPERATING AND MAINTENANCE COSTS 2.1 FUEL COSTS SHALL BE COMPUTED ON THE BASIS OF 100,000 KM OF OPERATION PER YEAR AT A FUEL PRICE OF 0.80 USD PER LITER, DISCOUNTED TO NET PRESENT VALUE AT A DISCOUNT RATE OF 10 PERCENT

23 BID EVALUATION USING LIFE CYCLE COSTING FOR PROCUREMENT OF 100 HIGHWAY TRUCKS
2.2 SPARE PARTS COST SHALL BE BASED ON 100,000 KM PER YEAR OF OPERATION, BASED ON THE GUARANTEED FIGURES PROVIDED BY THE BIDDER FOR EACH YEAR, DISCOUNTED TO NET PRESENT VALUES AT A DISCOUNT RATE OF 10 PERCENT. IF GUARANTEED FIGURES ARE NOT PROVIDED PURCHASER MAY USE ESTIMATED FIGURES BASED ON PAST EXPERIENCE IF AVAILABLE. 3. DEPRECIATED COST 3.1 PURCHASER SHALL ESTIMATE THE DEPRECIATED COST OF THE VEHICLE OFFERED BASED ON THE GUARANTEED LIFE PRIOR TO THE FIRST MAJOR OVERHAUL, OR BASED ON PAST EXPERIENCE, BUT IN NO CASE MORE THAN 8 YEARS 4. BIDDERS SHALL FURNISH ALL THE DATA REQUIRED FOR THE ABOVE COMPUTATIONS. AS FURTHER OUTLINED UNDER CLAUSE OF THE TECHNICAL SPECIFICATIONS

24 BID EVALUATION USING LIFE CYCLE COSTING 100 HIGHWAY TRUCKS
A B USD USD 1. INITIAL COSTS BID PRICE EX-FACTORY/CIF EVALUATION , ,000 ADJUSTMENT FOR DELIVERY SCHEDULE , EVALUATION ADJUSTMENT FOR VARIATION , IN PAYMENT TERMS TOTAL , ,000 2. OPERATING AND MAINTENANCE COSTS FUEL - GUARANTEED COST FOR EACH YEAR (8,000) (6,000) NPV FOR 6 YEARS , ,130 SPARES - GUARANTEED COST (AVERAGE) (5,000) (4,000) NPV FOR 6 YEARS , ,420 TOTAL , ,550

25 BID EVALUATION USING LIFE CYCLE COSTING 100 HIGHWAY TRUCKS
A B USD USD 3. DEPRECIATED VALUE (-DEDUCT) LIFE (6 YEARS) (6 YEARS) DEPRECIATED VALUE ,500 4. TOTAL LIFE CYCLE COST , ,050 RANKING

26 RELEVANT PART OF THE BID EVALUATION CLAUSES IN THE BIDDING DOCUMENTS
EVALUATION USING LIFE CYCLE COSTING FOR THE PROCUREMENT OF A 500 MW COAL-FIRED POWER STATION BOILER COMPLEX RELEVANT PART OF THE BID EVALUATION CLAUSES IN THE BIDDING DOCUMENTS BIDS WILL BE EVALUATED ON LIFE CYCLE PRINCIPLES BY EVALUATING THE INITIAL COST AND THE COST OF OPERATION OF THE PLANT OVER A PERIOD OF 20 YEARS. THE EVALUATION OF THE OPERATING COSTS WILL BE BASED ON THE CAPITALIZED COST FOR EACH PERCENT OF BOILER EFFICIENCY ABOVE THE MINIMUM ACCEPTABLE, AS SPECIFIED IN THE TECHNICAL SPECIFICATION, DISCOUNTED TO PRESENT VALUE AT A DISCOUNT RATE OF 10 PERCENT. THE EVALUATION WILL BE ON THE FOLLOWING NORMS:

27 EVALUATION USING LIFE CYCLE COSTING FOR THE PROCUREMENT OF A 500 MW COAL-FIRED POWER STATION BOILER COMPLEX 1. BID PRICE FOR THE BOILER AND MANDATORY SPARES. 2. PRICE FOR SPARES REQUIRED FOR THE FIRST FIVE YEARS OF OPERATIONS, CAPITALIZED TO PRESENT VALUE AT PERCENT DISCOUNT. 3. ADJUSTMENTS TO BID PRICE FOR OMISSIONS, DEVIATIONS AND EXCEPTIONS TO TECHNICAL AND COMMERCIAL CONDITIONS IN THE BIDDING DOCUMENTS. 4. CAPITALIZED COST SAVINGS FOR BOILER EFFICIENCY AT THE RATE OF US$500,000 PER EACH 0.1 PERCENT ABOVE PERCENT. 5. CAPITALIZED COST FOR THE AUXILIARY POWER CONSUMPTION AT US$2,000 PER KW.

28 EVALUATION USING LIFE CYCLE COSTING FOR THE PROCUREMENT OF A 500 MW COAL-FIRED POWER STATION BOILER COMPLEX ALL FIGURES IN USD (IN THOUSANDS) 1. INITIAL COSTS A C TOTAL QUOTED PRICE, INCLUDING , , MANDATORY SPARES 2. ADJUSTMENTS (A) FOR OMISSIONS IN MANDATORY 3, SPARES (B) COMMERCIAL EXCEPTIONS 15, ,000 (delivery, payment terms) (C) TECHNICAL EXCEPTIONS 28, ,000 (omission of equipment, capacity shortage, etc.) INITIAL COST , ,000

29 EVALUATION USING LIFE CYCLE COSTING FOR THE PROCUREMENT OF A 500 MW COAL-FIRED POWER STATION BOILER COMPLEX ALL FIGURES IN USD (IN THOUSANDS) ADJUSTMENTS FOR A C FOLLOW-ON COSTS (A) CAPITALIZED COST OF SPARES 40, , FOR FIVE YEARS (B) CAPITALIZED COST SAVING -12, , FOR HIGHER EFFICIENCY (C) CAPITALIZED COST OF AUXILIARY 5, , POWER CONSUMPTION TOTAL ADJUSTMENT FOR 33, ,000 FOLLOW-ON COST 4. TOTAL EVALUATED COST ON 264, , LCC PRINCIPLES RANKING

30 BID EVALUATION USING LIFE CYCLE COSTING OIL PALM PLANT
RELEVANT PART OF THE BID EVALUATION CLAUSES IN THE BIDDING DOCUMENTS: THE EVALUATION AND COMPARISON OF RESPONSIVE BIDS SHALL BE BASED ON THE TOTAL LIFE CYCLE COST FOR SIX YEARS, PER UNIT OF OUTPUT. THE LIFE CYCLE COST SHALL BE THE SUM OF THE INITIAL PURCHASE PRICE OF THE PLANT AND THE COST OF OPERATION IN ELECTRIC ENERGY FOR SIX YEARS OF OPERATION OF A UNIT COST OF US$0.10 PER KWH, DISCOUNTED TO PRESENT VALUE AT 12 PERCENT.

31 BID EVALUATION USING LIFE CYCLE COSTING OIL PALM PLANT
BID EVALUATION AND COMPARISON ALL FIGURES IN USD (IN THOUSANDS) INITIAL COSTS A B 1. INITIAL COST , ,300 2. OPERATING COST PER YEAR (1,200) (1,000) OPERATING COST FOR 6 YEARS , , NPV AT 12 PERCENT 3. TOTAL LIFE CYCLE COST , ,411 4. OUTPUT PER YEAR (TONS) , ,000 5. EVALUATED COST PER TON OF OUTPUT 6. RANKING A-12 MILLION .10 PER KWH B-10 MILLION .10 PER KWH