WP 7 SWARP Kickoff Meeting, 4-5 February 2014 WP7 Dissemination and exploitation Torill Hamre, Aleksander Vines and Laurent Bertino SWARP KickOff Meeting.

Slides:



Advertisements
Similar presentations
Science and Policy Integration for COastal Systems Assessment
Advertisements

ECOOP Data Management System (T2.2/WP2) Declan Dunne 13 th February 2008, Athens.
SWARP: Ships and Waves Reaching Polar regions
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
MEDIN Standards M. Charlesworth and the MEDIN Standards Working Group.
CEOS WGISS Technology & Services Subgroup Overview by Wyn Cudlip British National Space Centre/QinetiQ Presentation.
UPStrat-MAFA 3rd General Meeting Selfoss – Iceland July 2013 Fabio Sansivero (INGV) Gaetano Zonno (INGV) Símon Ólafsson (EERC)
Modalities for exchanging census IT expertise in the region Ilpo Survo, United Nations ESCAP, Bangkok, for UNECE.
WP5 – Knowledge Resource Sharing and Management Kick-off Meeting – Valkenburg 8-9 December 2005 Dr. Giancarlo Bo Giunti Interactive Labs S.r.l.
1 EuropeanaLocal- Europeana Knowledge Sharing Workshop EuropeanaLocal- Europeana Knowledge Sharing Workshop 13/14 January 2009 Rob Davies, Scientific Co-ordinator.
THE ADVANCED TECHNOLOGY ENVIRONMENTAL AND ENERGY CENTER (ATEEC) Summative External Evaluation July 1, 2013 – June 30, 2014 PRELIMINARY OUTLINE.
EUROWA Module European Module for Oiled Wildlife Emergency Response Assistance.
TPAC Digital Library Talk Overview Presenter:Glenn Hyland Tasmanian Partnership for Advanced Computing & Australian Antarctic Division Outline: TPAC Overview.
Serving society Stimulating innovation Supporting legislation Meeting on OGC Sensor Observation Service (SOS) for INSPIRE Mickael.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 Plan 1 st period Inova+
COGAIN Kick-Off Tampere, Finland WP 7: Community Outreach Inger Kirk Jordansen
1 The GEOSTAT project Vilni Verner Holst Bloch MSc. landscape ecology and natural resources Statistics Norway Otervegen 23 N Kongsvinger Tel : ++47.
NA8 Dissemination in SeaDataNet  Demonstrate the data, products and services of SeaDataNet infrastructure  promote them among potential users and data.
KNOWLEDGE DATABASE Topics inside  Document sharing  Event marketing  Web content.
1/ 27 The Agriculture Ontology Service Initiative APAN Conference 20 July 2006 Singapore.
INFOBALT, October 22, 2004, Vinius IST4Balt project information dissemination using web-based knowledge systems Zigmas Bigelis EU projects consultant Asociation.
AIRNow-International The future of the United States real-time air quality reporting and forecasting program and GEOSS participation John E. White U.S.
Multilateral Project for Transfer of Innovation Project Duration: 24 months Partners’ Kick-off Meeting, November 2009, Sofia Tanya Pancheva/University.
The Preparatory Phase Proposal a first draft to be discussed.
NAVTOR in SWARP-project
WP5 - Mapping Indian Research Potential Sourabha Rani, ITSMA, INDIA Activities for Year 5 & 6.
WP10 Dissemination Oleg Liber, U. Bolton UK Objectives 1.To disseminate, on an on-going basis, the RTD outcomes: specifications and standards, architectures,
MERSEA Remote – Sensing Ocean Portal Brest Nov 2005 WP2.6 - DIP2 Project Status < Observing Systems < Remote Sensing.
Open Service Network for Marine Environmental Data Jorge de Jesus GeoViQua Workshop,Barcelona 18/Fev/2011.
NANOSTRUCTURED AND FUNCTIONAL POLYMER- BASED MATERIALS AND NANOCOMPOSITES NANOFUN-POLY, NETWORK OF EXCELLENCE WP14 : Spreading of Excellence - Communication.
Design central EMODnet portal Objectives, Technical Proposal and Consultation Process.
 Copyright 2005 Digital Enterprise Research Institute. All rights reserved. Semantic Web services Interoperability for Geospatial decision.
WP5: Integration & Validation IFREMER, NERSC, NIERSC, ODL, NAVTOR, NERC.
TIPEIL LLP-LDV/TOI/07/IT/019 First Transnational Workshop Athens, 7-8 February 2008 Venue: IEKEP - 34A Averof str. in Nea Ionia 1 st floor DISSEMINATION/VALORISATION.
Work Package 8 Outreach & Training Simon Keeble Blue Lobster.
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
Basics of Drupal for Admins Rochelle Terman
Opendap dev - meeting, Boulder, Feb 2007 OPeNDAP infrastructure in European Operational Oceanography T Loubrieu (IFREMER) T Jolibois (CLS)
© NERC All rights reserved Work Package 8 – Web Services and Technology Jonathan Lowndes
1ECOOP Plenary Meeting Athens 2008 EUROMISS EUROpean Marine Information System of Systems S Pouliquen, Thomas Loubrieu ECOOP plenary meeting.
SEERA-EI project kick-off meeting, Athens, 9-10 April 2009 SEERA-EI WP5 – Dissemination and liaison with pan-European initiatives Athens,
The new European Toolkit EC-CHM Miruna Bădescu EEA contractor: Eau de Web.
Why a co-ordination action about Enhanced Geothermal Systems ? P. Ledru & A. Genter Engine Launching Conference February 2006 Orléans, France Opening.
Web Technologies and System Dynamics for Community Sustainability Gordon Keating, Donatella Pasqualini, & Gary Geernaert Los Alamos National Laboratory.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 WP 7 SERVICES AND DATA ACCESS.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 – Dissemination, Exploitation Strategy and Standardization Inova+ Co-Living.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems WP10: Dissemination, Transfer and Exploitation Review.
Emodnet Central Portal Ifremer inputs Excuse us for not beeing present today! Have a fruitful meeting!
WP6 – Dissemination Project Name: Enhancing Students Participation in Quality Assurance in Armenian HE- ESPAQ Ref TEMPUS BE-TEMPUS-SMGR.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
EMODNET Preparatory Actions Progress meeting for ur-EMODNET preparatory actions, 24 November 2009 Presentation of Progress Chemical Lot Alessandra Giorgetti.
Implementation recommendations 1st COPRAS review Presentation at 2nd COPRAS annual review, 15 March 2006, CEN/CENELEC meeting centre, Brussels Bart Brusse.
MIS 321 PS 2 FACT FINDING METHODS: SURVEY AND INTERVIEW.
Slice of Life June 2003 TUSK: The Tufts University Sciences Knowledgebase (formerly the HSDB): A Knowledge Management System Susan Albright Tarik Alkasab.
Presentation of Work Package 6 (WP6) “Design and implementation of Dissemination Activities” MATcHES Kick-off meeting Feb 2014 Ruse, Bulgaria TEMPUS BG-TEMPUS-JPHES.
Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 1 SI O S Svalbard Integrated Arctic.
LINKVIT KICK-OFF MEETING ROME 28TH OCTOBER 2013 WP 6 Dissemination and Exploitation.
Nicolas Granier / June 7th
INTAROS – Integrated Arctic Observation System
INTAROS WP5 Data integration and management
Flanders Marine Institute (VLIZ)
Flanders Marine Institute (VLIZ)
WP7 - Dissemination of Results & Exploitation
WP7 - Dissemination and outreach
Dick M.A. Schaap – Technical Coordinator SeaDataNet Training Workshop
Design central EMODnet portal Objectives and Technical description Initial draft prepared by the Flanders Marine Institute.
Ramez Quneibi, TAGITI Consortium Meeting, Germany 19 August 2016
IENE Intercultural Education of Nurses in Europe
MARDS DISSEMINATION & EXPOILTATION
University “Mediterranean” Podgorica & University of Montenegro
Presentation transcript:

WP 7 SWARP Kickoff Meeting, 4-5 February 2014 WP7 Dissemination and exploitation Torill Hamre, Aleksander Vines and Laurent Bertino SWARP KickOff Meeting

WP 7 SWARP Kickoff Meeting, 4-5 February 2014 Outline Objectives Tasks and portals used for data distribution Overview of schedule and deliverables Person-months per partner

WP 7 SWARP Kickoff Meeting, 4-5 February 2014 Objectives Dissemination of scientific-technical results, data, metadata, demonstration results, and knowledge how to exploit the observation and modelling components, and to synchronize SWARP activities with related dissemination channels.

WP 7 SWARP Kickoff Meeting, 4-5 February 2014 Tasks T7.1 - Public web site [Months: 3-36] –NERSC (lead), IFREMER, subcontractor (video) –Public web site will be established at the beginning of the project –Used to actively disseminate project information and results to all interested users and media Overview of project and activities Public presentations Promotional material, brochures, fact sheets Products examples Announcements and news –Will be built using Drupal open source CMS

WP 7 SWARP Kickoff Meeting, 4-5 February 2014 Tasks T7.1 - Public web site [Months: 3-36] –A short educational movie will be prepared using videos from field experiments, satellite images and model simulations. The movie will use advanced animation techniques to merge satellite and model results to visualize the dynamics of waves in ice to raise public awareness about the associated risks. –The movie will be produced by a professional company, and shown at relevant venues (such as conferences and user meetings) as well as on the public project web site.

WP 7 SWARP Kickoff Meeting, 4-5 February 2014 Tasks T7.2 - Data distribution [Months: 3-36] –NERSC, IFREMER –Data from the NAVTOR’s services in WP4 will also be distributed publicly by existing data servers at NERSC and Ifremer. –The goal is to stimulate other services in the MIZ such as search and rescue and oil spills response. –New parameters generated by the project (maximum floe size) will be added to the output NetCDF/CF files Output files will be compliant with CF1.4 conventions or above, for easy distribution through the standard Web Map Service protocol Metadata will be marked up with keywords from the NERC Vocabulary Server ( a SeaDataNet standard

WP 7 SWARP Kickoff Meeting, 4-5 February 2014 Tasks T7.2 - Data distribution [Months: 3-36] –The open data service will conform to the INSPIRE directive, allowing the following services: view, download, subset and invoke. All services will be accessible through two portals –European Marine Information System (EUMIS) NETMAR portal ( –SOLab Arctic Portal ( Download by FTP and OPeNDAP data servers –OPenDAP also allows subsetting

WP 7 SWARP Kickoff Meeting, 4-5 February 2014 EUMIS portal

WP 7 SWARP Kickoff Meeting, 4-5 February 2014 EUMIS portal Example features: extraction of time series, change of map projection

WP 7 SWARP Kickoff Meeting, 4-5 February 2014 SOLab Arctic Portal

WP 7 SWARP Kickoff Meeting, 4-5 February 2014 SOLab Arctic Portal Example: Big polar low near Greenland ( )

WP 7 SWARP Kickoff Meeting, 4-5 February 2014 Tasks T7.3 - Service sustainability [Months: 18-36] –NAVTOR, NERSC, NIERSC, NERC, ODL –This task will evaluate the costs of the SWARP service as marginal costs above the existing services running at competing services will be investigated and the positioning of the SWARP services will be analyzed in the evolving landscape. –Different business models will be studied beyond the project duration for each partner separately, considering the involvement of users in the private and public sectors. National and European support for innovative services will also be sought. –A database of potential and existing users will be maintained in the course of the project and the sers will be actively be updated of the results from test cases. The feedback from the user workshop held at Mo 30 will be used as input to this report...

WP 7 SWARP Kickoff Meeting, 4-5 February 2014 Overview of schedule and deliverables Task WP title / Task short titleMonth 1-12Month 13-24Month Dissemination and exploitation 7.1Public website 7.2Data distribution 7.3Service sustainability Project web site and dissemination plan Promotional and scientific material Business plan

WP 7 SWARP Kickoff Meeting, 4-5 February 2014 Overview of schedule and deliverables

WP 7 SWARP Kickoff Meeting, 4-5 February 2014 Person-month per partner