Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.

Slides:



Advertisements
Similar presentations
PPPL,NFRI Study of Error Field and 3D Plasma Response in KSTAR J.-K. Park 1, Y. M. Jeon 2, In collaboration with J. E. Menard 1, K. Kim 1, J. H. Kim 2,
Advertisements

NSTX-U Collaboration Status and Plans for: University of California at Davis N.C. Luhmann, Jr., R. Barchfeld, C.W. Domier, C.M. Muscatello, M. Sohrabi.
Potential Upgrades to the NBI System for NSTX-Upgrade SPG, TS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U.
Fast-Ion-D-Alpha and Solid-State NPA Diagnostics for NSTX-U NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
Study of tearing mode stability in the presence of external perturbed fields Experimental validation of MARS-K/Q and RDCON codes Z.R. Wang 1, J.-K. Park.
NSTX-U Team Meeting Stefan Gerhardt Contributions from B. Stratton, R. Kaita, A. Diallo, and J. Hosea and the NSTX Research Team August 2014 Team Meeting.
NSTX-U T&T TSG Contributions to FY15 JRT NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U.
NSTX-U FY2014 Q3 progress report: Upgrade Construction Progress Ron Strykowsky, Erik Perry, Tim Stevenson, Larry Dudek, Jim Chrzanowski, Steve Langish,
Team Meeting April 25, 2014 NSTX-U Construction Progress NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U.
Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
Operations Notes Updates Since Last Team Meeting Stefan Gerhardt NSTX Team Meeting B318 January 3 rd, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
Machine Installation and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318.
NSTX-U FWP 2015 Budget Planning Meeting-NSTX Upgrade Status- Ron Strykowsky – 4/10/ NSTX Upgrade Progress Overview Ron Strykowsky Erik Perry, Tim.
NSTX NSTX Team Meeting Jan. 3, 2013 NSTX Team Meeting Jan. 3, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX Team Meeting May 28, 2008 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL.
Quality Assurance Readiness for Operations Review Judy Malsbury, Head of QA Princeton Plasma Physics Laboratory NSTX Upgrade LSB B318 December 9-11, 2014.
NSTX-U Transition to Operations Al vonHalle Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 October 2 nd & 3.
NSTX-U Diagnostic Installations S.P. Gerhardt, B. Stratton, R. Kaita With help from A. von Halle, E. Perry, F. Jones NSTX-U Supported by Culham Sci Ctr.
Sustainment and Control Chapter Status Stefan Gerhardt 12/5/12 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
ISTP (and other…) Update Stefan Gerhardt NSTX-U Monday Physics Meeting Feb. 20, 2015 B318 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
EP-TSG session Meeting agenda et al. M. Podestà NSTX-U Research Forum 2015 EP-TSG session PPPL, Room B252 02/24/2015 NSTX-U Supported by Culham Sci Ctr.
Current status of high k scattering system J. Kim 1, Y. Ren 2, K-C. Lee 3 and R. Kaita 2 1) POSTECH 2) PPPL 3) UC Davis NSTX Monday Physics Meeting LSB-318,
NSTX-U Collaboration Status and Plans for: Charged Fusion Product Diagnostic FIU Werner U. Boeglin Ramona Perez, Alexander Netepenko, FIU D.S. Darrow PPPL.
1 Update on Run Schedule R. Raman NSTX Team Meeting PPPL, Princeton, NJ, 08 February, 2006 Work supported by DOE contract numbers DE-FG02-99ER54519 AM08,
RF Operations: Commissioning the RF systems and antenna conditioning J. Hosea et al. NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
NSTX Team Meeting July 21,, 2011 NSTX TF Update NSTX Team Meeting July 21, 2011 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
NSTX Effects of NTSX Upgrades on DiagnosticsFebruary 8, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns.
Prototype Multi-Energy Soft X-ray Diagnostic for EAST Kevin Tritz Johns Hopkins University NSTX-U Monday Physics Meeting PPPL, Princeton, NJ June 25 th,
Direct measurement of plasma response using Nyquist Contour Z.R. Wang 1, J.-K. Park 1, M. J. Lanctot 2, J. E. Menard 1,Y.Q. Liu 3, R. Nazikian 1 1 Princeton.
NSTX-U Program Update J. Menard NSTX-U Team Meeting B318 May 7, 2013 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl.
ASC Five Year Plan Chapter Status Stefan Gerhardt NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu.
Wave Heating and Current Drive TSG: XMP for Recomissioning the HHFW System R.J. Perkins, J. C. Hosea Theory & Modeling: N. Bertelli NSTX-U Supported by.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
1 R Raman, B.A. Nelson, D. Mueller 1, T.R. Jarboe, M.G. Bell 1, J. Menard 1, R. Maqueda 2 et al. University of Washington, Seattle 1 Princeton Plasma Physics.
NSTX Centerstack Fabrication Status James H. Chrzanowski and the NSTX Upgrade Team Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science.
NSTX-U Construction Erik Perry Princeton Plasma Physics Laboratory NSTX Upgrade Readiness to Operate Review LSB B318 December 9-11, 2014 NSTX-U Supported.
M&P TSG Prioritization for FY2015 and campaign startup M.A. Jaworski, C.H. Skinner, R. Kaita NSTX-U Science and Topical Science Group organizational meeting.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX-U Collaboration Status and Plans for: X Science LLC Ricky Maqueda NSTX-U Collaborator Research Plan Meetings PPPL – LSB B318 April / May 2014 NSTX-U.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX Upgrade Project – Final Design Review June , NSTX Supported by Vacuum Pumping, Gauging and RGA Systems W. Blanchard Princeton Plasma.
Safety Jerry Levine Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 May 2 - 3, 2012 NSTX-U Supported by Culham.
Macroscopic Stability TSG Pre-forum Meeting #1 J.W. Berkery Department of Applied Physics, Columbia University, New York, NY NSTX-U Supported by Culham.
NSTX Team Meeting February 7, 2007 Supported by Office of Science College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U.
EP-TSG: draft plans for commissioning & first research phases of NSTX-U operation M. Podestà, D. Liu, N. Gorelenkov, N. Crocker for the NSTX-U EP-TSG Pre-Forum.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman XP Review - ASC Feb 2, 2009 NSTX Supported by College.
NSTX-U Collaboration Plans for UCLA PI: Neal A. Crocker Co-PI: Prof. Troy Carter Grad. Student (planned 2 nd year onward) PPPL Research Contacts and Collaborators:
NSTX Team Meeting December 21, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
Effect of 3-D fields on edge power/particle fluxes between and during ELMs (XP1026) A. Loarte, J-W. Ahn, J. M. Canik, R. Maingi, and J.-K. Park and the.
NSTX-Upgrade Magnetics And Related Diagnostics SPG NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
NSTX NSTX Team Meeting May 7, 2013 NSTX Team Meeting May 7, 2013 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu.
First results of fast IR camera diagnostic J-W. Ahn and R. Maingi ORNL NSTX Monday Physics Meeting LSB-318, PPPL June 22, 2009 NSTX Supported by College.
Tom Egebo PPPL Review of the NSTX TF Coil Repair Effort September 3 - 4, 2003 Cost & Schedule to Completion Supported by Columbia U Comp-X General Atomics.
NSTX NSTX TF, PF and umbrella Upgrade Internal ReviewFeb 24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
NSTX NSTX LidsJuly 6, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL Johns Hopkins U LANL LLNL Lodestar.
NSTX Team Meeting June 30, 2009 College W&M Colorado Sch Mines Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics.
NSTX-U Disruption PAM Working Group – Controlled Shutdown XP Discussion S. A. Sabbagh and R. Raman Department of Applied Physics, Columbia University,
Planning for Toroidal Lithium Divertor Target for NSTX and Supporting Experiments on CDX-U/LTX R. Kaita Boundary Physics Science Focus Group Meeting July.
Upgrades to PCS Hardware (Incomplete) KE, DAG, SPG, EK, DM, PS NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
Presently Planned Vacuum-Side Diagnostics for the NSTX-Upgrade Center Column NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
Preliminary Results from XP1020 RFA Measurements J.W. Berkery Department of Applied Physics, Columbia University, New York, NY, USA NSTX Monday Physics.
NSTX NSTX Team Meeting –Masa Ono August 15, 2014 NSTX-U Team Meeting August 15, 2014 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo.
NSTX-U Collaboration Status and Plans for: M.I.T. Plasma Science and Fusion Center Abhay K. Ram, Paul Bonoli, and John Wright NSTX-U Collaborator Research.
Research Operations Update Stefan Gerhardt NSTX-U Team Meeting B-318 December 4 th, 2014 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima.
Comments on HC Measurements for NSTX- Upgrade SPG CS Upgrade Meeting 11/2/11 NSTX Supported by Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima.
NSTX Team Meeting August 9, 2011 NSTX TF Update Team Meeting August 9, 2011 Culham Sci Ctr U St. Andrews York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto.
Neutron diagnostic calibration transfer XMP D. Darrow and the NSTX Research Team XMP & XP review meeting Control Room Annex June 11, 2015 NSTX-U Supported.
Profiles Variations in NSTX-U and their Potential Impact on Equilibrium and Stability Magnetoboss 12/6/2013 NSTX-U Supported by Culham Sci Ctr York U Chubu.
NSTX NSTX Upgrade Project – Final Design ReviewJune 22-24, NSTX Supported by College W&M Colorado Sch Mines Columbia U CompX General Atomics INEL.
Presentation transcript:

Machine Installations and Construction Management Erik D. Perry Princeton Plasma Physics Laboratory NSTX Upgrade Project Office of Science Review LSB B318 May 2 - 3, 2012 NSTX-U Supported by Culham Sci Ctr York U Chubu U Fukui U Hiroshima U Hyogo U Kyoto U Kyushu U Kyushu Tokai U NIFS Niigata U U Tokyo JAEA Inst for Nucl Res, Kiev Ioffe Inst TRINITI Chonbuk Natl U NFRI KAIST POSTECH Seoul Natl U ASIPP CIEMAT FOM Inst DIFFER ENEA, Frascati CEA, Cadarache IPP, Jülich IPP, Garching ASCR, Czech Rep Coll of Wm & Mary Columbia U CompX General Atomics FIU INL Johns Hopkins U LANL LLNL Lodestar MIT Lehigh U Nova Photonics Old Dominion ORNL PPPL Princeton U Purdue U SNL Think Tank, Inc. UC Davis UC Irvine UCLA UCSD U Colorado U Illinois U Maryland U Rochester U Tennessee U Tulsa U Washington U Wisconsin X Science LLC

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd NSTX Upgrade Outage A plan has been developed for performing the NSTX Upgrade Outage –Based on experience from similar outages since 1984 –Plan is being continually improved as opportunities arise A system for coordinating and controlling the outage tasks is in place –Based on the very successful Work Control Center that was used during the TFTR D&D Project Assuring safety, efficiency and correct performance

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Outage Planning Outage planning based on bottoms-up estimates from Engineering –Assumes one shift, 5 days per week for almost all work Assigns technicians, by name, to scope to assure staffing requirements are met Adjust start date of tasks to assure tasks in the same area are compatible Accelerating tasks that make other tasks safer or more efficient Peel back cabling and fiber optics, rather than removing them, when access is needed to perform tasks 10/20/11 11/03/11

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Outage Planning cont Work in Bays J, K and L most congested –Neutral beam installation, including cutting large hole in vessel –Coil supports and umbrella modifications for center stack –Diagnostic relocations, including cutting large hole in vessel Work crews on opposite sides of vacuum vessel or on different shifts Assume moving NB box into test cell will impact other activities until box can be sealed Pre-plan temporary storage areas to minimize handling Daily / hourly coordination of all field work is critical 11/17/11 11/23/11

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Outage Coordination Use of Work Control Center (like TFTR D&D Project) Work Control Center reviews all Engineering Work Packages for the field –Reviews Job Hazard Analysis (JHA) –Assures pre-requisites are done –Attends pre-job and post-job briefs –Interfaces between Engineering and the field crews –Assures that the field work is done safely and correctly –Assures that the field crews are used efficiently Daily Plan-of-the-day meetings to coordinate activities between crews and fine tune technician assignments 12/7/11 12/14/11 Set up for machining o-ring groove in upper flange

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd NSTX-U Outage Plan Schedule

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd NSTX-U Outage Plan Schedule cont

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Start of the Outage Established construction power Disconnected all power to the NSTX Test Cell (NTC) except lighting and construction power Vented vacuum vessel and ventilated to the outside –No vessel entry at this time

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd October 2011 – January 2012 Removed RF piping within 10’ of vacuum vessel –To permit access to east side of machine Removed cable tray at top of machine –To permit crane access for heavier diagnostics Installed new 119” EL platform on west side –To permit moving racks to new location, not just temporary storage –To provide space to re-work passive plates Started rack removals to make room for NB2 10/20/111/27/12

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd October 2011 – January 2012 Removed old pump duct

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd October 2011 – January 2012 cont Removed old centerstack Removed diagnostics from the machine –Stored in upper DARM located by the bay they came from –Larger items stored in TFTR basement

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd October 2011 – January 2012 cont Coiled up cables, tubing and fibers from around machine –Did not remove cables etc – too costly and time consuming to replace

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd February 2012 – April 2012 Installed extensive scaffolding to facilitate access to the upper and lower domes of the vacuum vessel –Improved safety for workers –Improved efficiency of removal and welding tasks –Inspected every shift as required by OSHA

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd February 2012 – April 2012 cont Added additional welding to ribs on upper and lower vacuum vessel domes –Utilized a crew to prep welding area and parts to minimize welder time (since welders in short supply) Removed passive plates from in-vessel for replacement of hardware Removed old outer TF support structure –Permitted fit-up of prototype parts of the new design to verify design

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Plan for May 2012 Change mounting hardware for passive plates

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Plan for May 2012 Cut off vessel nozzles at Bays J, K and L Upper vessel work at Bays J, K, and L –Umbrella legs, TF clevis pads PF2/3 clamps

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Plan for June 2012 In-vessel set-up for vacuum vessel cutting –Installing support beams, containment and ventilation Ex-vessel set-up for vessel cutting –Installing containment and ventilation Vessel cutting at Bays J and K for new neutral beam port Weld JK cap onto vessel

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Plan for July 2012 Ex-vessel set-up for cutting at bay L –Installing containment and ventilation Vacuum vessel cutting at Bay L for new diagnostics port Remove temporary in-vessel beams and ventilation Leak check welds on Bays JK cap Remove platform at Bays JKL

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Plan for August – October 2012 Move Neutral Beam #2 enclosure into NSTX Test Cell (NTC) Assemble Neutral Beam #2 in NTC Decon exterior of Neutral Beam #2 and all affected areas in NTC

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Plan for October 2012 – September 2013 Complete modifications to umbrella and coil supports Complete Neutral Beam systems Re-install items removed for centerstack work Re-install items removed for NB work

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Plan for October 2013 – March 2014 Install Centerstack Pumpdown / leakcheck vacuum vessel Bakeout ISTP

NSTX-U NSTX Upgrade Project – Office of Science Review – May 2 nd – 3 rd Summary The NSTX Outage has been planned based on –Bottoms-up estimates from Engineering –Identifying staff to do the work –Scheduling work to avoid conflicts The plan is being continuously worked –To improve safety and efficiencies –To deal with delays in getting parts –To accelerate tasks to ease pressure on critical path tasks Coordination and Control –Provided by the Work Control Center –At the Plan-of-the-day meeting –Continuously by the Field Supervisors Successfully performing the outage