Prepared By: Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager) Investment In RE Conference - Ramallah, Palestine Ahli Wind Energy Project (AWEP) Imagination and Reality EU Funded Project
Outline Background (Ahli Hospital) Introduction (AWEP) Achievements Actual Achievements until know Experience Barriers Overcoming Barriers AWEP as Investment Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: Fax:
Outline Background (Ahli Hospital) Introduction (AWEP) Achievements Actual Achievements until know Experience Barriers Overcoming Barriers AWEP as Investment Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Patients’ Friends Society Ahli Hospital – Hebron, Palestine Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: Fax:
Largest Hospital in Palestine (27,500 m 2 ). Started work on beds which will be 350 beds in the near future. More than 470 staff members are working in the hospital which deals with more than 150,000 patients per year. Patients’ Friends Society Ahli Hospital – Hebron, Palestine Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: Fax:
Outline Background (Ahli Hospital) Introduction (AWEP) Achievements Actual Achievements until know Experience Barriers Overcoming Barriers AWEP as Investment Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Introduction Ahli Wind Energy Project (AWEP) Project Name Integrated Wind Energy Production System for Al-Ahli Hospital Duration: 48 Month Started 1/1/2009 Budget: EURO EU Contribution: 79.63% = EURO AL-Ahli Contribution: 20.37% = EURO Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: Fax:
AWEP is a pioneer project in Palestine that is funded by the EU. This project will directly benefit Al-Ahli Hospital from the Wind Energy. Wind Turbine and Solar Thermal System will be used to achieve the goal of the project. Objectives To produce ~30-40 % of the hospital Power needs. To reduce the environmental costs, such as carbon emissions. To provide the hospital with an alternative source of power. Increasing the awareness of the local community Building the capacity of the hospital’s staff and its associates. Introduction Ahli Wind Energy Project (AWEP) Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: Fax:
Diesel Generator Intelligent Electricity Panels Hospital P.V System Wind Turbine System Utility Meter 225 KW 200 KWp – future Project 500 KW Grid meter
Wind Turbine Planned Site Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: Fax:
Grid connection for wind turbine Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Solar Thermal Panels Planned Site Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Thermal System - Block Diagram Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Thermal System Schematic Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: Fax:
Outline Background (Ahli Hospital) Introduction (AWEP) Achievements Actual Achievements until know Experience Barriers Overcoming Barriers AWEP as Investment Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Actual Achievements until know Installation of measurement station. Already record data for 3 years. Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Potential of wind at Al Ahli Site Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: Fax:
Training, and Capacity Building Many activities abroad and in Palestine Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Tendering and Contracting Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Workshops and Dissemination Five workshops. Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Barriers Political Barriers (Rules & Regulations not completed). Market Barriers. Technical Barriers. Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Overcoming Barriers The Authorities are collaborative. We already find market for our desire. We’ve received a technical assistant from our EU partner in addition to local and international consultants. Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Outline Background (Ahli Hospital) Introduction (AWEP) Achievements Actual Achievements until know Experience Barriers Overcoming Barriers AWEP as Investment Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Why PFS decided to invest in RE As a medical organization aims to go green. The power invoice of Al-Ahli Hospital is huge (reduce bill). Investing in RE will reduce the energy bill, so give the opportunity to enhance the quality of medical service. Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
EU Investments in Wind Energy Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax: Source: European Wind Energy Association
Some Facts about AL Ahli Hospital Electricity 1,791,045 KWh/year.(2009). Diesel 233,352 Liters /year.(2009), this is equivalent to 2,238,545 KWh/year. Electricity consumption Invoice on 2009 = 240,000 €. Diesel consumption invoice on 2009 = 245,950 € Total energy consumption = 4,029,590 KWh/year Total energy bill = 485,950 € Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Wind Turbine Expected Outcome Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax: Sector # power [W/m²] AEP [MWh] Total Energy330 MWh Average Power Density174 W/m2 The total operating Hours, “ the wind speed above cut in speed ”, of the wind turbine per year : 5800 Hours.
Wind Turbine Expected Outcome Electricity Saving from wind turbine = 330,000 KWh/year / 1,791,045 KWh/year *100% = 18.4 % per year. Saving of electricity bill = 18.4% * 240,000 € = 44,160 €. Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Solar Thermal Expected Outcome The daily energy required from the SWHS is 50% of the daily thermal energy consumption, which equals X50% = Our SWHS (Solar Water Heating System) is designed to save 1,200,000 Kwh/year; this is equivalent to a saving of 53.6% (3287Kwh/day). The average solar radiation on the horizontal surface in Palestine is 5400wh/m2/day. The area of the solar collector is 2.55m2 The number of the necessary solar collectors is 355. Each collector of this type has a supposed production of (0.77 Kwh). The total area of the collectors is 905m2. The hot water storage tank capacity is 5X4 m3. The daily production of the SWHS is 23.0 m3 (at 70cº). The annual production of SWH is m3. Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Solar Thermal Expected Outcome Thermal energy Saving from Solar Thermal = 1,200,000 KWh/year / 2,238,545 KWh/year *100% = 53.6% per year. Saving of diesel bill = 53.6% * 245,950 € = € Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Total Energy Saving from Wind & Solar Total Energy Saving From Wind & Solar = KWh\year + 1,200,00 KWh/year / 4,029,950 KWh/year * 100% = 37.9 % per year. Total Savings = 44,160 € + 131,829.2 € = 175,989.2 € per year. Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Energy, Cost and Savings Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax:
Pay Back Period Pay back period for wind turbine = € \ 44,160 € = 11.3 years. After 20 years = 9 * 44,160€ = 397,440 € Pay back period for solar thermal = 245,950 € \ € = 1.86 year. After 5 years = 3 * = € Prepared By Eng. Mohammad Tamimi (Project Manager) Eng. Hamdi Tahboub (Deputy Manager)Tel: 02 – Fax: