The Science and Art of Datacenter Site Selection “Don’t Let One Function Trump Another, It’s a Business Decision”

Slides:



Advertisements
Similar presentations
1 Location of Partners and customers Who are our customers? MSSL Centre for Process engineering European Space Agency JOANNEUM RESEARCH Swedish Research.
Advertisements

PowerVu Jim Smith – Chief Technology Officer. 1 About Digital Realty Trust (NYSE: DLR) We are the worlds largest wholesale datacenter provider In 27 markets.
Global Manufacturing and Materials Management
© 2012 Eaton Corporation. All rights reserved. Past the Green Image of Hybrids: Finding commercial value. Craig Jacobs Eaton Corporation June 12 th, 2012.
 Team name: Teen Titans  Team member: Viet Ha Bui (Leader) Thuc Anh Nguyen Hai Phuong Nguyen  Country: Viet Nam.
5 Chapter Entrepreneurship and Small Business pp
Monetizing Energy Saving Opportunities CBC Energy Group LLC 2011 Commercial and Industrial Energy Solutions.
Patriot Capital Corporation. Patriot Capital is dedicated to the financing needs of the retail and commercial petroleum industry, including municipal,
North American Natural Gas Infrastructure Needs Donald F. Santa, Jr. President Interstate Natural Gas Association of America The Independent Petroleum.
Wells Fargo Wealth Management Private Banker- Houston, TX.
Cloud Computing: The IT Technology Solution of the Future Presented by: Chris Tryon.
IE 3265 Production & Operations Management Slide Series 2.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved Chapter Three The Organization and Structure of Banking and the Financial-Services.
Realcomm.2011 Title: Opening Remarks Track: Energy Innovation Summit Presented by: Marc Petock Vice President Global Marketing and Communications, Tridium.
IE 3265 Production & Operations Management Slide Series 2.
Chapter One Introduction to Managerial Accounting COPYRIGHT © 2012 Nelson Education Ltd.
Chapter 1 THE INVESTMENT SETTING Chapter 1 Questions What is an investment ? What are the components of the required rate of return on an investment?
American Depository Receipts (ADRs) – By Prof. Simply Simple ADR is a stock that trades in stock exchanges in the United States. It is a dollar denominated.
© 2010 Fluor. All Rights Reserved. 17 Terawatts to 30 Terawatts – a building perspective February 2, 2015.
Smart Consumer Spending Advanced Curriculum. © Take Charge Today – August 2013– Smart Consumer Spending – Slide 2 Funded by a grant from Take Charge America,
1 Analysys Mason undertook an international programme of customer satisfaction research for a telecoms billing system vendor  A billing systems vendor.
Career Tracks and Opportunities in Finance. Different Finance Career Tracks  Corporate Finance  Investments  Banking and Financial Services  Insurance.
March 14, 2012 Office of Client Solutions 1800 F Street, NW Washington, DC Working together to meet your needs and make.
Sapient Insurance Partners. Overview & Services We have almost four decades of combined experience in the property & casualty insurance and reinsurance.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
Chapter 15 Investing in Bonds
©2015 Lincoln National Corporation LCN TRACKING ADVISOR SENTIMENT ON WEALTH PROTECTION Survey Results, Wave 1 – 4Q 2014 Market Research and.
David I. McGeown "Where's the value in on site generation? Can real time metering and dispatch make a difference?
Chapter 15 Investing in Bonds Video Clip Chapter 15 Bonds 15-1.
APEC Symposium – Taipei, August 2011 Enhancing SME Capacity of Managing the Risks Associated with Trade Liberalization APEC Symposium – Taipei,
Presentation to Energy & Technology/Planning & Development Committees Considerations on Establishing Municipal Utilities Joint Informational Forum Legislative.
Chapter 15 Investing in Bonds Chapter 15 Investing in Bonds.
Risk Management (“RM”) Program January Risk Management Objectives  Goal of the Halliburton RMProgram is to achieve: - Higher returns on capital.
Entrepreneurship and Small Business Chapter 5 pp
International Business Fourth Edition.
Introduction to Security
BUSINESS AS USUAL. NO MATTER WHAT.. Business Continuity Is About The Future. BUSINESS AS USUAL. NO MATTER WHAT. The future of your family. The future.
Chapter 16. Global Production, Outsourcing, and Logistics
TRP Chapter Chapter 5.4 Facility development.
Essential Leadership Skills for Driving Sustainable Growth.
Economies of Scale. The advantages of large scale production that result in lower unit (average) costs (cost per unit) AC = TC / Q Economies of scale.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Top Down View of Estimation Test Managers Forum 25 th April 2007.
Chapter 14 Global Production, Outsourcing and Logistics 1.
The Certified Private Equity Professional (CPEP) Designation
The California Performance Review: A Prescription for Change Established by Executive Order S-5-04 To Create the First 21 st Century Government in America.
Economies of Scale. The advantages of large scale production that result in lower unit (average) costs (cost per unit) AC = TC / Q Economies of scale.
ADDING VALUE - BRINGING VALUE A Presentation from (your name) to (principal’s name)
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
Survey Report IPEXPO 2015 Top priorities and Technology Trends.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
THE RENFORD GROUP WEALTH BUILDER PROGRAM
Basics of Finance.
Sapient Insurance Partners. Overview & Services We have almost four decades of combined experience in the property & casualty insurance and reinsurance.
Investing in Bonds McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved
Chapter © 2012 Pearson Education, Inc. Publishing as Prentice Hall.
45 minutes south of the Twin Cities on Interstate 35 Population approximately 25,000.
POWER POINT MATERIAL PREPARED BY LECTURER: AHMED EL RAWAS Lecturer.Ahmed El Rawas 1 Feasibility study.
1 EIT 4.1 Thinking Different: Data Centers and IoT Chris Crosby, CEO, Compass Datacenters.
How to Find a Trustworthy Long Distance Moving Company Published by:
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
Devices 10 billion Internet- connected devices by 2016 People 1 billion+ people use social media services today Cloud 30 % of data will live in or pass.
GroupRe Plus Serving the Reinsurance Needs of Smaller Insurance Companies Robert Lumia, FSA, MAAA Assistant Vice President & Director Group Reinsurance.
Chapter 15 Investing in Bonds 15-1

Growth and innovation Project support overview.
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
(1888 PressRelease) Infinite Insurance & Financial Services-Isaac-Serenity Rodarte-Leads the pack in Retirement Insurance planning-In Southern California-5 Star-29 Years combined Experience-Safety is priority-best Rated
Presentation transcript:

The Science and Art of Datacenter Site Selection “Don’t Let One Function Trump Another, It’s a Business Decision”

The Science and Art of Datacenter Selection “Don’t Let One Function Trump Another, It’s a Business Decision” Chris Crosby Senior Vice President Digital Realty Trust

Selecting the right site for a datacenter is a complex undertaking that requires specific skill sets, expertise and guidelines. This session will present and examine all of the elements involved in datacenter site selection to aid attendees in determining the correct way to proceed in their own selection process. Abstract

About Digital Realty Trust: NYSE We know datacenters: flexible, reliable, cost-effective solutions Acquire, develop, operate and own datacenters 27 markets across North America and Europe with 13 million square feet Support over 2 million square feet of datacenter space Over % uptime

Large scale, high-volume datacenter development expert Over 100 MW of 2 N UPS delivered in previous 24 months Over 300 MW of Utility delivered in previous 24 months Over 100 MW in current development pipeline Industry leader in green datacenter building and operations About Digital Realty Trust: NYSE (continued)

It’s not a selection process. It’s an elimination process. Requires multiple skill sets Specific components of the process Elements can vary based on corporate criteria The “Trade Secret”

Proper site selection incorporates a variety of defined skill sets “Kids don’t try this at home” They are: Real estate Hazard and risk Power and fiber assessment Design and construction The Skill Sets

The more experience the better Understanding requirements can narrow the field quickly Example: In California generator emissions requirements can vary by county and municipality Reduce the cost of due diligence “Soft dollars” add up quickly across multiple buildings Skill Sets: Real Estate

More than just don’t build next to a munitions factory You must understand the implications of location Understand how to deal with underwriters and insurance firms to protect your investment Skill Sets: Hazard And Risk

You must be able to understand what you need Ability to determine if the site has access to both and how difficult will it be to get what you need Skill Sets: Power And Fiber Assessment

Building a datacenter is not the same as a commercial building The only way to maximize efficiency is through experience and process Process must be documented and followed Skill Sets: Design And Construction

No two sites are the same Attributes must match your requirements Different firms will have different needs Attributes Of A Quality Site

You have to understand your business requirements and priorities Your priorities eliminate “unsuitable” sites Taxes Location of personnel Availability of support personnel Power pricing Telecom costs Attributes Of A Quality Site

Avoidance of natural hazard risks Specific: Next to a chemical plant Area: Hurricanes, earthquakes Even if the building survives you can’t get to it National Guard, FEMA Attributes Of A Quality Site: Essentials

Power Essential that you can quantify your power requirements kW of IT load Can the power you need be delivered? Will it support current and future requirements? At your price point? Volatility Attributes Of A Quality Site: Essentials

Fiber Facility should be supported in advance or you may face delays What are your options? Attributes Of A Quality Site: Essentials

Fiber (continued) Is conduit or manhole access available? How long will it take for a provider to gain access? Who will pay if additional conduit, etc. required? Attributes Of A Quality Site: Essentials

Have to be able to answer the question of what is required to place the equipment I need Varies by municipality Need someone local who understands the variances Example: One town in New Jersey can put generators anywhere, another requires special permits Attributes Of A Quality Site: Entitlement Rights

Yes Financial firms: Often focus on synchronous communications distances Internet companies: Cost of Power Do Attributes Of A Quality Site Vary By Industry?

Yes Seismic risk Weather related risk Security issues Are There “Red Flags?”

Function of expertise, skill sets and understanding of requirements Typical Corporate Range: months Very often longer (years) Presence of required skill sets can reduce dramatically Six months How Long Should Site Selection Take?

Requires cross-functional expertise with business oversight Sites aren’t selected as much as eliminated Very specific set of skills required to accelerate the process Business considerations will dictate many site requirements Access to sufficient power and fiber are absolute essentials Summary