HERWG Updates Reporting Status Agencies Registered to date = 44 Update Received for today meeting Agencies = 02 Last update compiled – July 2011
HERWG – National Summary Estimated Damage Houses (Flood 2010) – 670,580 (0.6 millions) – NDMA/PDMA One Room Shelter (committed /Planned) – 181,981 (0.1 Millions) – HERWG Following not included in counting Self Recovery estimation Houses damage - Flood 2011(Sindh/Balochistan) EDH – Estimated Damage Houses ORS = One Room Shelter
HERWG – By District ORS Completed = 48,629 (21% of total)
HERWG – ORS Overall Status (work In Progress)
HERWG – By Organization
HERWG – UN-HABITAT
Adobe Brick Shelter MATERIAL PRICES IN FLOOD AFFECTED AREAS Compiled by Shelter Cluster Technical Manager Baber Tanveer All prices in PKR % age SR# ITEM DESCRIPTION SIZEQTYUNITSKPKS.SindhN.SindhPunjabBlochistan Remarks 1 Fired Bricks 4.5"x3"x9"3216No Sun Dried Bricks(Adobe Bricks) 4.5"x3"x9"6636No Solid Concrete Blocks 6"x8"x12"0No Deformed Steel Bars (40,000 Psi) #20Kg3038 #30Kg3038 #40Kg Sand Cuft?20cft Crush (Gravel) -12cft Portland Cement (Best Way) -5.25bag Lime(20 KG) -1bag Steel Girders 4"x8" approx. 16 ft long 2 kg/rft2No Bamboos 20 ft long with uniform thickness 2" dia0No " dia10No Reeds(Sirki) (10' x 20')0No Chattai (Bundle of dry grass 10 Pcs) -5No Door (Wood) 3.5ft x 6ft1No Door (Steel) 3.5ft x 6ft0No Window (Wood) 4ft x 3ft1No Window (Steel) 4ft x 3ft0No Lintel Beam. Wooden (3ich thick+5" wide) 5ft long1No Plastic Sheet 4mx 5 m1No Nails 2 inch1Kg inch1Kg Skilled Labor per day6MD Unskilled Labor per day per day10MD Note: (-) sign showing that the price is decreasing Material Price Analysis of All Provinces IncreasingDecreasing