Jay Britton

Slides:



Advertisements
Similar presentations
Parallel Flow Visualization Data Requirements Parallel Flow Visualization Data Requirements NERC ORS Meeting Toronto, Ontario September 23-24, 2009 Jim.
Advertisements

Conversion of Breaker Oriented Model into CIM objects Karel Máslo Department of Transmission System Analysis ČEPS, a.s May 2011, Prague, Czech Republic.
Software Analysis Tools
Model Authorities and Model Exchange Jay Britton Principal Architect.
WG A Family of CIM Standards based on CIM/XML ( ) - Static Network Model Exchange ( ) - Dynamic Model Exchange - Unbalanced Models.
Announcements Be reading Chapters 9 and 10 HW 8 is due now.
January TSS J. Gronquist, S. Kincic
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
© 2011 Siemens Energy, Inc. All rights reserved. Answers for energy. PSS ® ODMS a proven solution for CIM-based network modeling Anna Geevarghese T&D Service.
California Independent System Operator Soumen Ghosh CAISO CONFIDENTIAL Created: 06/15/2008 State Estimator for CA ISO Market - Relevance and Readiness.
Specifying the Use of CIM in an EMS Project Jay Britton, Fellow, IEEE 2009 PSCE, Seattle
PSS®E 34.0 Release Webinar 23 April 2015
© ABB Ltd ABB Experience Neela Mayur CIM Users’ Group Meeting June 12, 2008.
Announcements Be reading Chapter 3
Superposition, Thevenin / Norton Equivalents, Maximum Power Transfer Circuits 1 Fall 2005 Harding University Jonathan White.
MSF Testing Introduction Functional Testing Performance Testing.
UCTE CIM VISUALIZATION & EDITING TOOL Jun Zhu, Power Info LLC CIM User Group Meeting, Genval 2009.
Supervisory Systems.
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
1Texas Nodal Texas Nodal CRR Annual Model Discussion DRAFT By John Moseley, ERCOT.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
A Family of CIM EMS Exchange Standards based on CIM/XML ( ) - Static Network Model Exchange ( ) - Dynamic Model Exchange? - Schematic.
Parallel dc Circuits.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
1 Dead Bus Pricing Issue/CRR Performance Issue TAC 3 February, 2010.
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
CIMSpy/CIMdesk A CIM-based Data Engineering Tool
Peak RCCo Performance Metrics Draft –November 2013.
Enhanced State Estimation by Advanced Substation Monitoring PSerc Project Review MeetingTexas A&M University November 7, 2001 College Station, TX PIs:
1 RDFid Examples of RDFid: _a73ed7b8a60a4b2ea46318a370b9c7de Definition from the profile The document requires only that in a given full model,
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems
Announcements For lectures 8 to 10 please be reading Chapter 3
Gestionnaire du Réseau de Transport d 'Electricité 2008 IEEE PES General Meeting: Panel on Best Practices in State Estimation Experiences and practices.
Extension of the Common Information Model with a Catalog of Topologies Proposal for IEC TC57 WG14 PhD. Dragan S. Popović MSc. Ervin Varga.
A Family of CIM EMS Exchange Standards based on CIM/XML ( ) - Static Network Model Exchange ( ) - Schematic Layout Exchange ( )
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
European Model Exchange Standard based on - IEC , IEC (updated 2009) - IEC (updated 2009) Jay Britton
SIMPLE TRANSMISSION OUTAGE. Nodal Protocol Definition 2.26 Simple Transmission Outage A Planned Outage or Maintenance Outage of any Transmission Element.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
EMS User’s Group Presented By Margaret Goodrich Project Consultants, LLC Presented to EMS User’s Group Austin, TX September.
EMS Users Conference 1 September 23rd – 26th CIM in the Network Model Management System Joel Koepke Network Model Engineer, ERCOT.
WG Summaries Austin, TX October 24, Process WG Co-chairs: Terry Saxton & Ed Dobrowolski Scope: Overall management of the CIMug Development and tuning.
Nodal MIS Portal Project MIS Functions to Support EDS 3, Release 5 September 11, 2007.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
> Title of presentation - Date - References11 Model Exchange and Naming -- Activity  Standard  New draft of standard has been created.
Optimal Power Flow- Basic Requirements For Real Life.
A Family of CIM EMS Exchange Standards based on CIM/XML ( ) - Static Network Model Exchange ( ) - Schematic Layout Exchange ( )
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
NDSWG Report June 16, NDSWG Report Regular meeting held May 16 in Taylor Telemetry / State Estimator Update Naming Convention Electrical Bus Designation.
Optimal Power Flow- Basic Requirements For Real Life Their Problems And Solutions.
IBM Global Services © 2005 IBM Corporation SAP Legacy System Migration Workbench| March-2005 ALE (Application Link Enabling)
Voltage Divider Circuits Input transducers Input transducers are devices that convert a change in physical conditions (for example, temperature) into a.
CRR Network Model One-Line Diagram Beth Garza TPTF April 22, 2008.
Economic Evaluation Program for Transmission Planning in Competitive Power Market LEE, SANG-HO Fusion Technology Research Lab. K-EMS Development.
6/21/2007 TPTF: Baselines 1&2 WP and CI Baselines 1 and 2 White Papers and Change Items Diran Obadina.
Nodal Planning Go Live Austin, TX February 3, 2011
BJT Circuits Chapter 5 Dr.Debashis De Associate Professor
UCTE CIM Visualization & Editing Tool
CIMSpy/CIMdesk A CIM-based Data Engineering Tool
Model Authorities and Model Exchange
The state of implementation of CIM in MAVIR
Definition from the profile
Two-Port Networks Equivalent Circuits
Jay Britton
The Network Model Management System
Software Analysis Tools
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Model Exchange TF Vasteras, June 12, 2008
Model Authorities and Model Exchange
Model Exchange TF Vasteras, June 12, 2008
Presentation transcript:

Jay Britton jay.britton@areva-td.com CIM for UCTE Jay Britton jay.britton@areva-td.com

Issues Business Process (Use Cases) Format Compatibility How does the UCTE DACF compare with CIM model exchange processes? Format Compatibility UCTE DEF is a power flow format. CIM/XML (452/552) is an EMS model exchange format.

UCTE Day-Ahead Congestion Forecast

UCTE Day-Ahead Congestion Forecast II

UCTE Day-Ahead Congestion Forecast III

The initial CIM model exchange standard focused on transfer of complete models: CIM Exchange (full, partial, incremental update) CIM import / export CIM import / export System B Import Model System A Import Model a Proprietary / Home grown Extract / Merge Tools Proprietary / Home grown Extract / Merge Tools b A Internal Model B’s Model of A System A Local Vendor Model System B Local Vendor Model A’s model of B B Internal Model System B EMS System A EMS

Basic 2-Region Process Example Site A makes a change: A changes its ModelAuthoritySet using its CIM modeller. A imports the change into its EMS. A exports the change to B. B receives the change (full or incremental), updating A’s ModelAuthoritySet within its CIM modeller. B renames any new elements and repeats any reduction of A’s ModelAuthoritySet. B imports the new model into its EMS.

Hierarchical Process Definition for an Interconnection Bottom level. No significant differences. Export changes as the model authority. Import externals from the full interconnection model. Upper level: Manages boundary sets. Creates the full interconnection model. Model quality evaluation. Study state estimation. Derives operational model in the same manner as lower levels. Different reduction criteria. Design extends to any number of hierarchical levels.

The CIM Model Exchange Business Process

Format Issue: Bus-Branch Models UCTE (and other power flow formats) are “bus-branch” Substations have one “bus” for each normally connected set of bus sections. Switches and circuit breakers are normally not modeled. Bus numbers or names are often the key tool for engineers in navigating the model and comparing results. CIM EMS modeling is “node-breaker” Substation switches and breakers are normally modeled so that real-time configurations can be evaluated. Nodes represent bus sections and other electrical junctions. Buses are calculated as a result of “topology processing”.

Format Issue: Bus-Branch Models Problem has been discussed extensively in the 2007 “CIM for Planning”. Solution: Models that only require bus-branch detail simply use one CIM ConnectivityNode per Bus. When a CIM model is converted to bus-branch form, The output of the topology processor is used to form buses. Markers may be added to the CIM modelling to allow consistent buses to be named consistently.

Format Issue: Dynamic Data UCTE and CIM are not “information equivalent” UCTE (and other power flow formats) represent one point in time Load and generation at a bus Desired voltage Cap bank input CIM EMS models describe network parameters over time. Time Schedules Load Distribution Patterns Generation and Interchange

Converting CIM Dynamic Data to UCTE EMS products have been converting EMS formats to various power flow formats, including EMS, for some time. Solution: Scheduling functions calculate values at time T. Same procedures are used as occurs within an EMS to set up a power flow. Power flow formats are produced from power flow scheduling functions, not from the raw modeling data.

Converting UCTE Dynamic Data to CIM Has been done when power flow cases are used to create external models for EMS. Solution One – No Changes to CIM: Power flow values for load, desired voltage, etc. are used to reverse engineer dummy schedules. Load distribution works pretty well, but other schedules are not usually very good and need amendment. This approach is most appropriate as a partial initialization procedure for externals. Solution Two – CIM extensions required: Single time point, power flow input variables are added to the CIM model. A new CIM “Scheduled Output Interface” is defined between scheduling and network analysis. UCTE data uses the new interface rather than the 452 model exchange interface. This is probably the more appropriate solution for most real business situations.