This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.

Slides:



Advertisements
Similar presentations
Construction Contracting
Advertisements

THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Contract CloseOut.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
SUBMITTALS PROCESSING Fall 2008 ARCH 330
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
Your Deliver Method... …Pick it Early
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Marcy Mealy Procurement Specialist CDBG Program
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
PROJECT DELIVERY SYSTEMS
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
CSI Certification Presented to the Louisville Chapter of CSI November 13, 2014 Edmund L Brown, CSI, CCCA, Assoc. AIA Project Architect, Sebree Architects.
Construction Engineering 221 Drawings and Specifications.
Model Procurement Documents for Architectural Services [NAME] [PLACE] [DATE]
Large Public Works Projects and the General Contractor/ Construction Manager (GC/CM) Procedure: A New Way to Save Money, Time and Aggravation.
Project Delivery Overview June 2015 Final PD Training FMD WUSM 6/15/15 1.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
Standards of Practice Course
The Construction Specifications Institute Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT)
Chief Legal Counsel, OSFC
Construction Contracts and Project Delivery Methods
CEM 520 Construction Contracting Dr S. Almohawis Course Content.
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
CVE 4070 Construction Engineering Test-2 & Review Prof. Ralph V. Locurcio, PE.
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials.
PLANNING AND PRE-DESIGN
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Manager Core Competencies The core competency.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
Conditions of the Contract ACT Objective To provide an overview of the Conditions of the Contract, their purpose, content, and relationship to.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Preliminary Project Descriptions/Outline Specifications
Agency Construction Management :CM NOT AT-RISK
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
CVE 4070 Construction Engineering Course Review Prof. Ralph V. Locurcio, PE.
Division 1 – General Requirements ACT Objective O Learn to write Division 1 sections in a manner that governs but does not limit the content of.
The Construction Specifications Institute Session 3 DESIGN Project Delivery Education Program Construction Document Technology (CDT) Preparatory Course.
Transit Facility Development: Lessons Learned. Overview Vision Project Size & Scope Funding Approach Concept Design Project Delivery Validation Efforts.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
1 1 Effective Administration of Commercial Contracts Breakout Session # Session D06 Name: Holly Walker, CPCM Corporate Learning Solutions and Contract.
Construction Management At Risk Process
The Contract Management Process Contract Formation.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Procurement of Professional Services.  Professional Services:  Architects, Engineers  Surveyors  Geotechnical engineers  Nonprofessional Services:
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
Construction Documents Drawings Specifications Bid documents Construction Sketches and other data.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
CM at Risk v. Design-Bid-Build
PROJECT DELIVERY METHODS
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Overview and Chapter Contents
PROJECT DELIVERY METHODS
Controlling Project Cost and Schedule
Presentation transcript:

This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3 – Typical Phases of Project Development

This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session 01 Fundamentals Candidate is expected to understand: The Main Phases of a typical construction project cycle The Types of Documents produced in each phase of project development The relationship between the various Project Participants. CDT 1.3 – Typical Phases of Project Development

This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Typical Phases of Project Development The 2007 Edition of the CSI Project Resource Manual has been written to follow the Life Cycle of a Typical Project The PRM is organized into Eight (8) Modules, each dedicated to a Primary Phase of the development of a Typical Building Project Thorough study of the PRM is necessary for success in achieving Certification as a Contract Documents Technologist (CDT)

This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Facility Life Cycle Module 2 Project Concept Module 4 Project Design Module 3 Project Delivery Module 5 Construction Documents Module 6 Bidding Negotiation Module 7 Construction Module 8 Facility Management

This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Project Concept Definition How and By What Process Does a New Building Project Come Into Being? How Will It Relate to Its Environment? Why Is It Needed ? What Is Its Function? How Should It Be Designed? How Should It Be Constructed? How Is It Operated How Is It Maintained? What is Its Life Expectancy ?

This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Project Conception PRM Module 2 Project Definition Program Adequacy Preliminary Studies What Must It Do? What Will it Impact? Site Selection Environmental Impact? What Will It Cost? Budget Project Schedule How Long to Construct? How Long Will It Operate? Performance Criteria & Information Factors Affecting Function Factors Affecting Operations Commissioning Requirements

This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Project Conception Definition Participants May Include: Facility Programmers also known as criteria professionals Architects/Engineers (Design Professionals) Facility Managers Facility Users Developers Development Consultants Product Representatives Construction Managers Project Managers Design-Builders Contractors.

This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Schematic Programming Identification Of: User Preferences Project Image Functional Requirements Identifying Owner Goals Movement, activity adjacencies, and facility demographics. Project Conception Definition

This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Project Conception Definition Program development: Includes the organization of detailed information collected in impact studies and site analysis during the initial stages of information collection. This is the detailed information the A/E requires to complete the second design phase, design development. The critical activity is transforming the owner ’s broad visionary goals into a physical form.

This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Project Delivery PRM Module 3 Choice of Services Selection of Designer? Construction Methodology? Choice of Delivery Method Cost – Time – Extent? What Is The Life Value? Construction Management Choice of Construction Team? Quality Assurance Documentation? Quality Control Design Intent? Dispute Resolution? Performance Criteria & Information Identify Factors Affecting Function Identify Factors Affecting Operations

This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Project Design PRM Module 4 Design Considerations Qualifications? Experience? Product Evaluation & Selection Cost – Time – Extent? What Is The Life Value? Quality Assurance Documentation Overview? Cost Estimating – Value Analysis Budget Awareness? Value Alternatives ? Document Production Standard of Care ? Co-Ordination? Due Diligence ? Product Warranty & Reliability Manufacturer Stability?

This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Construction Documents PRM Module 5 Procurement Process Cost – Time – Extent? Experience – Availability - Contract for Construction Adequate – Reasonable – Fair? Insurance - Bonds Contract Conditions Time Tested? Clear – Concise - Complete Division 1 – General Requirements Co-Ordination with Sections – Conditions? Clear – Concise - Complete Project Manual Alternates – Unit Costs? Specifications Drawings Specification/Drawing Co- Ordination Specify It Once and Only Once!

This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Bidding/Negotiating/Purchasing PRM Module 6 Project Information What is Required? Distribution of Information Control of Information Bidding or Negotiation Procurement Documents Procedures Subcontractors Prices – Issues Concerns Bid Shopping Contract Award Procedures Constraints Pre-Award Documents & Assurances Purchasing Lead Time Terms of Payment

This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Construction PRM Module 7 Contract Documents Distribution Contract Administration Roles and Responsibilities Owner – A/E – Contractor Authorities Having Jurisdiction Pre-Construction Procedures Mobilization Quality Assurance Claims and Disputes Procedures Execution Project Closeout Procedures

This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Facility Management PRM Module 8 Roles In Project Closeout Operations & Maintenance Data Punch List Commissioning AHJs Operation & Maintenance Maintenance Issues Cost Issues Resource Materials Project Record Documents Spare Parts & Extra Stock Facility Evaluation Post Occupancy Inspections Documents – Life Cycle Resource Data

This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Project Procurement Types of Contracts Design/Bid/Build Single Prime Contractor Design/Multiple Bid/Build Multiple Prime Contractors Construction Management CMa Acts As Advisor CMc At Risk Agency CM Design/Build Single Prime Contract Owner/Build Any of the Above Procurement of Construction Services Can Be Contracted in a Number of Different Ways:

This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Project Procurement Competitive Bidding The Private Owner may elect to conduct a formal Competitive Bidding process for award of the Contract for Construction. Or…The Private Owner may elect to Negotiate a Contract for Construction Procurement of Construction Services varies between Private and Public Owners: The Public Owner may be required by law or ordinance to conduct a formal Competitive Bidding process for award of the Contract for Construction.

This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Both the Private Owner and the Public Owner may elect to Select a Contractor for award of the Contract for Construction by the RFQ Process and Negotiate a satisfactory Contract Price for Construction. There are certain ADVANTAGES if the Contractor is chosen EARLY during the Design Process. Improved control of COST TIME DURATION There are Alternatives to Procurement of Construction Services : Project Procurement Alternatives to Bidding