1 Swiss-Slovak Cooperation Programme April 2010. 2 SWISS-SLOVAK COOPERATION PROGRAMME  New possibilities of financial support for the 10 new member states.

Slides:



Advertisements
Similar presentations
EDULINK II ACP-EU Co-operation Programme in Higher Education Call for proposals EuropeAid/132023/D/ACT/Multi General outlines Funded by the European Union.
Advertisements

Arrangements regarding ECP 2014–2020 implementation 1.Implementation of the Republic of Slovenia Budget Act Specific section for the period:
Norwegian Financial Mechanism block grant ““Transfer of Experience and Strengthening of Cooperation among Local, Regional and Euro regional Partners in.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
National Disaster Risk Management Program NDRMP Belgrade, March
Large Scale Projects Aleksejs Šaforostovs LSP Project Manager Joint Technical Secretariat.
URBACT III LAUNCH EVENT Brussels, 16 March The URBACT III programme  Objectives & Activities  Thematic coverage  3 Types of network  Beneficiaries.
URBACT INFODAY FINLAND TOWARDS URBACT III Helsinki, 05 November 2014.
Implementation of Leader Axis measures by Jean-Michel Courades AGRI-F3.
European Social Fund Key elements of the Commission proposal for the future ESF Franz Pointner, DG Employment, Social Affairs and Inclusion.
Swiss - Latvian Cooperation Programme NGO Fund Evaluation of the Grant Scheme Sandra Rieksta Deputy Director Society Integration Foundation
Ministry of Education and Religious Affairs General Secretariat for Research and Technology EEA Financial Mechanism Research within Priority.
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
Info Day on New Calls and Partner Café Brussels, 10 February 2011 How to apply: Legal Framework – Beneficiaries – Application and Selection Procedure.
On the spot checks Double financing prevention administration processes Simona Liutkienė, Vaida Zigmantaitė 1 February, 2012.
Guidelines for the administration of axis 4 LEADER 17th July 2014, Nitra Mgr. Veronika Korčeková, MA Ministry of Agriculture and Rural Development of the.
Reporting Instructions For Beneficiaries and Partners of the HUSKROUA ENPI CBC Programme November 2011.
Rektoru Padomes sēde, Norwegian Financial Mechanism – cooperation possibilities Latvian Rector’s Council,
South East Europe Transnational Cooperation Programme Bologna, 15° June 2009 Kick-off meeting of project SARMa SEE Joint Technical Secretariat.
Regulatory requirements in the current programming period Funchal, 18 November 2010.
Managing Authority of EU Funds – Ministry of Finance 1 Methodology of selection of project applications for EU funds including preparation of appraisal.
Institutional structures for Structural Funds assistance Ministry of Finance September 10, 2003.
1 Polish SAI (NIK) experience in the field of EU funds Piotr Szpakowski Najwyższa Izba Kontroli Prague, 6-8 November 2006.
Regional Policy EU Cohesion Policy 2014 – 2020 Proposals from the European Commission.
-Honesty-Cooperation-Responsibility-Respect  Established in 2003 by the Ministry of Economy.  Non – profit public institution.  Managing and administrating.
1 European Territorial Cooperation in legislative proposals Peter Berkowitz Head of Unit Conception, forward studies, impact assessment, DG Regional Policy.
ADMINISTRATIVE & FINANCIAL ISSUES DG ECHO HUMANITARIAN AID AND CIVIL PROTECTION Finance, Legal Affairs and Partner Support unit-C3.
The Implementation of the Norwegian Financial Mechanism and the EEA Financial Mechanism in the Slovak Republic.
Regional Policy as a Tool of Regional Development Support Chapter IV. Pavol Schwarcz Slovak University of Agriculture in Nitra.
Embassy of Switzerland Swiss Contribution Office Hungary Swiss – Hungarian Cooperation Programme Rules and Procedures Information Days, May 2008 Miskolc.
8th Cohesion Fund Monitoring Committee 11 April 2008 Technical Assistance for the Cohesion Fund Management in Latvia No.2005/LV/16/C/PA/001.
Practical Information and Guidance to Applicants Green Industry Innovation Programme Romania July 2014 Practical Information and Guidance to Applicants.
The partnership principle and the European Code of Conduct on Partnership.
JASPERS for CEF Stéphane OUAKI Head Of Unit
Application procedure From theory to practice Dieter H. Henzler, Steinbeis-Transfercenter Cultural Resources Management, Berlin.
Ministry of Education, Research and Religious Affairs General Secretariat for Research and Technology EEA Financial Mechanism GR07 Research within.
Belgrade, Donor Coordination Meeting Belgrade, 4 th of June 2012.
Social inclusion of excluded young people and prevention of re-offending behavior
FDEA/SECO/WEIN – Daniel Menebhi Federal Department of Economic Affairs FDEA State Secretariat for Economic Affairs SECO “Sustainable energy management.
Interreg IIIB Trans-national cooperation: Budget comparison : 440 million EURO 420 m EURO (Interreg IIC prog.) + 20 m EURO (Pilot Actions)
European Commission Directorate General Environment Page 1 Regulation (EC) No 2152/2003 of the European Parliament and of the Council concerning monitoring.
1. TEMPUS PROGRAMME PROJECT REPRESENTATIVES’ MEETING Brussels, March 2010 Management of the Grant Agreement.
New approach in EU Accession Negotiations: Rule of Law Brussels, May 2013 Sandra Pernar Government of the Republic of Croatia Office for Cooperation.
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
ENI CBC Programmes Strategy and implementation 21 May 2013 St. Petersburg Alejandro Eggenschwiler (DG DEVCO) 1.
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
Financial management system of structural funds. Entities involved in financial management system Managing Authorities (MA) Managing Authorities (MA)
Ministry of Finance Financial management and control of the Operational Programmes, co- financed under the Structural funds and the Cohesion fund of EU.
DG Justice and Consumers Project Modifications DG Justice and Consumers.
Nordic-Baltic Mobility Programme for Public Administration 2014.
EuropeAid/152087/DD/ACT/LB Cultural activities 2016 Information Session 13 th June 2016.
URBACT INFODAYS PORTUGAL TOWARDS URBACT III Lisbon 21st January 2015.
EU - China 11 Guidelines for Applicants rules for applications European Union Delegation to China & Mongolia Beijing Information Session 14 th November.
Management of the Grant Agreement By Philippe Ruffio & Nathalie Hoste-Luxen Tempus project representatives’ meeting Brussels December 2011.
Leader Axis Rural Development Policy by Jean-Michel Courades AGRI-F3.
SOCIAL INCLUSION IN EASTERN EUROPE AND CENTRAL ASIA TOWARDS MAINSTREAMING AND RESULTS SOCIAL INCLUSION IN EASTERN EUROPE AND CENTRAL ASIA TOWARDS MAINSTREAMING.
Structural Funds Financial Management and Control, Romania
Call for Transfer networks September 2017
What is a grant? A direct financial contribution – donation – from EU budget An action - contributing to EU policy achievement Functioning of a body acting.
GREECE-ALBANIA IPA CROSS BORDER COOPERATION PROGRAMME
EVALUATION OF GENDER RESPONSIVE BUDGETING PROGRAMME IN NEPAL
PROJECT MANUAL Galina Georgieva Project Officer
URBACT III LAUNCH EVENT Brussels, 16 March 2015
ESF ASSISTANCE TO LITHUANIA’S OBJECTIVE 1 AND EQUAL PROGRAMS
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
Social Dialogue in the Slovak Republic
The evaluation process
The Emergence of SAPARD Agency in Slovakia
2012 Annual Call Steps of the evaluation of proposals, role of the experts TEN-T Experts Briefing, March 2013.
COGAIN Kick-Off 5-6 September, 2004 FINANCIAL GUIDELINES
Presentation transcript:

1 Swiss-Slovak Cooperation Programme April 2010

2 SWISS-SLOVAK COOPERATION PROGRAMME  New possibilities of financial support for the 10 new member states which joined the EU on 1 May 2004  66,866 mil. CHF (approx. 41 mil. Euro) is allocated for the Slovak Republic  At least 40% of the Contribution shall be spent in the region of the geographical focus  The Swiss Contribution will be increased with the finances from the State Budget in a form of co-financing

3 DOCUMENTS  Memorandum of understanding between the Council of the European Union and the Swiss Federal Council of 27 February 2006  Framework agreement between the Government of the Slovak Republic and the Swiss Federal Council concerning the implementation of the Swiss-Slovak Cooperation Programme to reduce economic and social disparities within the enlarged European Union

4 AUTHORITIES RESPONSIBLE FOR THE IMPLEMENTATION OF THE CONTRIBUTION 1. On national level in the Slovak Republic Government Office of the Slovak Republic (National Coordination Unit) Ministry of Finance of the Slovak Republic (Paying Authority and Audit Authority) National Monitoring Committee for the Swiss-Slovak Cooperation Programme 2. On national level in the Swiss Confederation Swiss Agency for Development and Cooperation (SDC) State Secretariat for Economic Affairs (SECO) Embassy of Switzerland in the Slovak Republic

5 Open Call Regional development initiatives in peripheral or disadvantaged regions Subject of the Call -Selection and support of projects with focus on tourism planning, mobilization of tourism potentials and improvement of the social services Geographical focus -The region of the East Slovakia, i.e. Prešov and Košice self-government regions

6 TYPES OF ELIGIBLE PROJECTS a)tourism planning at regional and district level, b) mobilization of tourism potentials, primarily in eco-tourism, sports, cultural heritage, c) strengthening and improving social services, social inclusion, the fight against poverty, measure of social law protection, social guardianship and social economy

7 FINANCIAL ALLOCATION AND LEVEL OF ASSISTANCE Indicative financial allocation EUR, including the 15% assistance from the State Budget Minimum amount of grant for a project (eligibility criterion) EUR, i.e CHF including the 15% assistance from the State Budget Maximum amount of grant for a project (eligibility criterion) -For projects defined under a)  EUR, i.e CHF including the 15% assistance from the State Budget -For projects defined under b) and c)  EUR, i.e CHF including the 15% assistance from the State Budget

8 EXAMPLES OF THE ELIGIBLE ACTIVITIES FOR THE INDIVIDUAL TYPES OF PROJECTS a) tourism are  development of tourism products  models of tourism management and organisation, including development of partnership boards  setting up regional/ local management organization b) social issues area  development and implementation of measures to prevent and solve the social exclusion of children  networking the providers of social services, executors of the children social law protection and guardianship measures, including development and capacity building of partnership boards  development of permanent and on-the-spot social services and measures of social law protection and social guardianship

9 ELIGIBLE APPLICANTS 1. Tourism planning: - self-government regions from the geographic focus area 2. Mobilization of tourism potentials: - municipalities, association of municipalities in terms of Act No. 369/1990 on municipal establishment - non-government organizations, e.g. in terms of Act No. 213/ civil associations in terms of Act No. 83/ non-investment funds in terms of Act No. 147/ Social area: - applicants defined in article 1. and 2.

10 PROJECT PREPARATION FACILITY (PPF) financing the technical and expertise documentation necessary for the elaboration and submission of a comprehensive Final Project Proposal (i.e. activity 6.1a)) Grant application for the PPF is submitted and approved within the Project Outline  the maximum total grant from the PPF must not exceed 2% of the total direct eligible expenses on other activities  Project Preparation Facility Implementation Agreement (concluded between the Government Office of the Slovak Republic and the successful applicant)

11 ASSESSMENT AND SELECTION OF THE PROJECTS 1st loop – submission of the Project Outlines Administrative compliance check, Eligibility check of the Grant Application and the applicant, Technical evaluation, Recommendation issued by the National Monitoring Committee, Decision of the Swiss Confederation on Project Outlines. (up to 3 months from the day of the submission of the Project Outlines) 2nd loop – elaboration of the Final Project Proposals Administrative compliance check, Eligibility check of the Grant Application and the applicant, Technical evaluation, Recommendation issued by the National Monitoring Committee, Final decision of the Swiss Confederation on the projects implementation. (up to 3 months from the day of the submission of the Project Outlines)

12 GENERAL REQUIREMENTS ON GRANT APPLICATIONS applicant – steady organization objectives and results are in compliance with the local and regional development strategies sustainability of results respecting the horizontal criteria (sustainable development, good governance, gender equality and non-discrimination, strengthening the bilateral relation) added value time frame

13 ELIGIBILITY OF EXPENSES Guideline on the eligibility of expenses for the focus area: Regional development initiatives in peripheral or disadvantaged regions eligibility period – specified in the respective Project Implementation Agreement/ Project Preparation Facility Implementation Agreement expenses or cost incurred before or after the eligibility period defined in the respective agreement will be considered as non-eligible

14 PROJECT CO-FINANCING RATE  From finances allocated for the Call – up to 100% of the total eligible expenses of a project (activities 6.1 b) and c) of the Call, indirect expenses of a project, reserve)  From the Project Preparation Facility – up to 100% of expenses eligible for financing from the Project Preparation Facility (activity 6.1 a) of the Call)

15 PROJECT BUDGET BREAKDOWN  Budget preparation = familiarization with the Guideline on the eligibility of expenses  Categories of the expenses on the basis of the synthetic accounts of the accounting system valid for the double entry book-keeping  Annex 2 = instructions within the Instructions for the applicant for grant  Annex 2 of the Grant Application  Comments to the budget breakdown (inevitable part of the Annex 2) – justification and method of calculation of each budget item  Data transfer from Annex 2 into the relevant parts of the Grant Application

17 SUBMISSION OF THE GRANT APPLICATIONS in compliance with the Instructions for the applicant for grant and the Guideline on the eligibility of expenses submission deadline for the Grant Applications = 12 July 2010 place for the submission – Úrad vlády SR, Námestie slobody 1, Bratislava

18 Additional and up-to-date information regarding the Call is available on the web page