Norwegian pilots Update 3rd February 2004 OASIS PLCS TC Cdr Tor Arne Irgens,

Slides:



Advertisements
Similar presentations
IATI Technical Advisory Group Overview TAG plan, country pilots, donor assessments & technical proposals Simon Parrish IATI Technical Advisory Group, DIPR.
Advertisements

Rgu: Information management Management of target student numbers Working group.
SAP Organization Change Management (OCM)
Slide 1 Presentation of the example business concept – DNV Exchange architecture - DNV Summary / issues from last workshop - DNV Presentation of Swedish.
Linking Technology and Defense. Introduction It stands for Product Life Cycle Support It is an International Standard It is an information standard It.
CATIA V4 Software Deployment Project Proposal
TIPR: Repository Exchange Package Use Cases and Best Practices Joseph Pawletko and Priscilla Caplan IS&T Archiving 2011.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
DEX Publication Project OASIS PLCS TC Telecon 29 April 2008 Trine Hansen.
SCOA – One Information Session Project Plan and Key Milestones Presented by National Treasury: Chief Directorate Local Government Budget Analysis – 18.
1 Proposed PLCS TC Organization and Functional Responsibilities Revision
1 Introducing Reportnet Miruna Badescu. 2 A linear view of Reportnet process.
Taking SMEs from Word-based narrative to topic-based structure.
Rolls-Royce & Ministry of Defence Pilot for Early Implementation of PLCS Marine Olympus/Tyne Summary 3 Feb 04.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
OASIS DEX workshop “Reference data” 3 February Oslo Trine Hansen - DNV.
Contents Integrating clinical trial data Working with CROs
1 ILE Project Integrated Logistics Environment Kickoff Meeting Subtask 1.2 Sharing Structural Design Data with Manufacturing Systems Presented by: Michael.
Monica Pantea, MANETPCC meeting in Groningen 2006 Time Schedule of the EURONS Annual Report End of reporting period Deadline of submission.
Contents Why Offsets Are Important for Bulgaria?
1 Synchronize work on DEXs and reference data between PLCS pilots and OASIS/PLCS - Proposed PLCS TC Organization and Functional Responsibilities.
Norwegian PLCS pilots Experiences and Reflections 3rd February 2004 Leif Tonning, DNV.
Integrated Logistics Enterprise = Common Operating Picture The SALE Architecture and the Missing Link - The Pathfinder Pilot Presented to: OASIS PLCS Technical.
Feb , TRANSATLANTIC ISO AP239 Product Life Cycle Support Land Systems Breakout Group Feb , 2006.
1 Public hearing on conditional grants and capital expenditure: 3rd quarter Presentation to Select Committee on Finance Northern Cape’s Department of Agriculture.
PLCS DEXs Trine Hansen DNV 20 April Content OASIS / PLCS Organization PLCS DEXs DEX architecture Process – define and verify capabilities Way forward.
UK MoD Initiatives TLSS (Through Life Support Standard) PLCS is being used as the basis for both the Information and Activity models. This will require.
DEX Publication Project OASIS PLCS TC Face-to-face meeting 1 October 2007 Trine Hansen.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
DC 15 February 2006 Exploiting Product Life-Cycle Support (PLCS) Commander Tor Arne Irgens Chief Data Model & Information Management Norwegian Defence.
ISMS Implementation Workshop Adaptive Processes Consulting Pvt. Ltd.
Recent development in the metadata area at Statistics Sweden Klas Blomqvist
DEX Publication Project OASIS PLCS TC Telecon 22 January 2008 Trine Hansen.
RECENT DEVELOPMENT OF SORS METADATA REPOSITORIES FOR FASTER AND MORE TRANSPARENT PRODUCTION PROCESS Work Session on Statistical Metadata 9-11 February.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
UNSD Recent international developments in Energy Statistics.
Synchronise work on DEXs and reference data between PLCS pilots and OASIS/PLCS Workshop #3 10 – 11 November 2004.
Recommendations from PLCS TOG Meeting Filton, UK Aug 2011.
Agenda for OASIS DEX workshop in Oslo 3-4 February 2004 Trine Hansen - DNV.
Progetto OPTIMUS PLM and Interoperability in the defense sector Vico Equense (NA) – April, Xenia Fiorentini.
DEX Publication Project OASIS PLCS TC Face to Face meeting 10 March 2008 Trine Hansen.
Slide 1 of 14© 2015 ENGISIS INTEROPERABILITY FOR PRODUCT LIFECYCLE MANAGEMENT Ing. Xenia Fiorentini PLM and Interoperability in the defense sector.
Product Life Cycle Support (PLCS) The Information Backbone to transform the Logistics Enterprise Some suggestions for the PLCS OASIS TC / Implementers.
Agenda 1. Key Activities, Accomplishments and Status 2. Meeting Notes and Action Items.
Workshop on international standards, contemporary technologies and regional cooperation Noumea, New Caledonia, 4 – 8 February World Population.
Synchronize work on DEXs and reference data between PLCS pilots and OASIS/PLCS - Background, Lessons learned, Conclusions, Recommendations, Plan forward.
European Commission / Taxation and Customs Union June 2009 UNECE REGIONAL CONFERENCE ON TRADE FACILITATION 1 Single Window European Commission.
1 Process Orientation at statistics Sweden – Implementation and Initial Experiences IAOS Conference, October 15, 2008 Mats Bergdahl, Deputy Director Process.
Week #8 OBJECTIVES Chapter #5. CHAPTER 5 Making Networks Work Two Networking Models –OSI OPEN SYSTEMS INTERCONNECTION PROPOSED BY ISO –INTERNATIONAL STANDARDS.
Slide 1 Copyright, Norwegian Defence Logistics Organization PLCS staging area Support for data exchange Jochen Haenisch
Technical Operations 12 th July 2010 Dr Phil Spiby Eurostep Limited Integrating Systems Engineering Information with AP233.
J-AGE I Status/Closing Report JPI MYBL - GA Meeting Brussels 21th January 2016.
Copyright, EPM Technology AS Contractual Data Interchange Specifications Jorulv Rangnes, CEO Jotne EPM Technology
TUM – Timetabling for The University of Manchester June Finch, Head of Timetabling Project, TLSO Francesca Moss, Teaching and Learning Administrator, School.
Software Configuration Management
Terms and Conditions Review 2011
Building A Repository for Digital Objects
The First Steps To A Knowledge Management Database
PLCS - Delivering the Promise
Status DEX Publication Project
Making Sense of the Alphabet Soup of Standards
Julian Pickering, Domain Lead Drilling & Completions
Data Exchange.
2. An overview of SDMX (What is SDMX? Part I)
Albania 2021 Population and Housing Census - Plans
Methods to overcome low coverage of Statistical business register
Proposed PLCS TC Organization
Enterprise Content Management (ECM) Project
SDMX Implementation The National Accounts use case
Presentation transcript:

Norwegian pilots Update 3rd February 2004 OASIS PLCS TC Cdr Tor Arne Irgens,

New materialRequirements IT systems Legacy New FIF Fighter aircraft Frigates Fast patrol boats Helicopters Surface-surface missiles … Def std interim SFK info model some 1288 req (1999) Systems can’t hold the information Don’t meet legal requirements Batch integration GOLF program (Initial) data deliveries from Prime Contractors Legacy data conversion SAP + (many) other appls NPDM PLCS +ISO data Repository Std data model Background

IZAR PDB Quality Check Pilot 1(NDLO/MI): Mapping of IZAR data to PLCS Ongoing Pilots

Pilot 1 Analyze the relation between the data model that IZAR use in the Project Database (PDB) for the frigates and the requirements model of the NDLO/Navy for the through-life support of the frigates Complete the mappings from the NDLO/Navy data model to the PLCS data model that were conducted in the phase-A project Agree and test with IZAR an export format for the PDB population

IZAR PDB Quality Check Pilot 1(NDLO/MI): Mapping of IZAR data to PLCS development of PLCS DEXs Ongoing Pilots PDTF PLCS Mapping Translator DEX Staging area Pilot 2 (NDLO/SEA): Receipt and testing of data from IZAR

Pilot 2 Contribute to an evaluation of the standard ISO10303–239: Establish a translator in order to automate, test and quality check of the information deliveries from IZAR Establish a temporary staging area, based on the PLCS data model, for receipt of data from IZAR Establish DEX’es (Data Exchange Sets) in order to standardise the exchange of data from the temporary staging area Quality check of data transferred

IZAR PDB Quality Check Pilot 1(NDLO/MI): Mapping of IZAR data to PLCS SAP ver. 4.6 Additional applications GOLF Logistics pilot – receipt of Life Cycle info. Pilot 3 (GOLF): Analysis of storing of frigate data in SAP based on the PLCS standard Translator Functional difference Information content difference development of PLCS DEXs Ongoing Pilots PDTF PLCS Mapping Translator DEX Staging area Pilot 2 (NDLO/SEA): Receipt and testing of data from IZAR

Pilot 3 To reveal, by means of the functional mapping, the difference between the functional requirements PLCS is requesting and the functions SAP is covering To assess, by means of the data mapping, the capability of SAP to store PLCS data Make recommendations for exchange of information with SAP according to the PLCS standard, and to identify PLCS driven requirements for a translator to SAP

4Q 2004 Mapped P21 Test data JUNE 2004 ?

Milestones Pilot 1 Mapping from IZAR to PLCS –Complete by end March Pilot 2 PLCS repository –Official data deliveries starts June 2004 (LSAR F310) Pilot 3 mapping from PLCS to SAP 4.6 –High level design of FIF starts 1Q –Detailed design due to start 2Q 19 months to F310 is commissioned

Need DEX 1, 3, 5 and 8 NOW Or NDLO will have to move forward by other means