WP 6 Dorota Pawlucka Progress Meeting Amersfoort, 08.07.2013.

Slides:



Advertisements
Similar presentations
Science and Policy Integration for COastal Systems Assessment
Advertisements

Institut für Meteorologie und Klimatologie Dipl.-Met. Tahera ALI October 2003 FINAL REPORT.
WP6: Dissemination and exploitation Vladimir Meglič.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
AIDA Governing Board meeting 11 Dec 2014 Final Project Reporting 1 AIDA Governing Board meeting, 11 Dec 2014.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
YMIR is a Support Action funded by the European Union under the 7th Framework Programme YMIR IMPROVE.
SINPHONIE project WP8 Communication and dissemination SINPHONIE Project kick-off meeting November, REC Conference Center, Szentendre Hungary Eva.
KM3NeT, , Pylos © FIM-NewLearning 2007 KM3NeT Management & Reporting Dr. Roland Klein Project Office KM3NeT
UPP - Understanding Privatization Policy Management and organizational issues Luca Farinola 24/02/2006.
Research Programme Design and Management – Experiences from CRUE – Partner Countries Reiner Enders PTJ (Project Management Organisation Juelich) Brussels,
GRAGE PROJECT Overview of WP7 DISSEMINATION
Headquaters Kick-Off Meeting Brussels 17 January 2013 Aware and Resilient Project overview – Austrian Red Cross.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 Plan 1 st period Inova+
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
WP 7 Dissemination Liuska Sanna, Programme Manager European Patients’ Forum.
The Programme is funded by Erasmus+ under
Marina Signore e- Frame Project Coordinator Division "Metadata, Quality and R&D Projects", Chief Istat e-Frame “European Framework for Measuring Progress.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
Evitherm MTR 07 Sept 04 Phill Giles Thermal Technology Consulting (TTC) Evitherm project mid-term review Work Package 2 Phill Giles Thermal Technology.
1 WP1 Coordination Sylvie Joussaume (CNRS-IPSL) IS-ENES 2 nd General Assembly Lecce, Italy December 12 th -14 th 2011 The IS-ENES website IS-ENES Partners:
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP8. Dissemination & Exploitation.
JCN, Justice Cooperation Network European Treatment and Transition Management of High Risk Offenders Tallin, 13 March 2013 Second Steering Committee Meeting.
Training for Newcomers, 9 February 2012 Delhi Session, Jan Valerie Bahr Steinbeis-Europa-Zentrum, Germany The Network as a Brand.
NANOSTRUCTURED AND FUNCTIONAL POLYMER- BASED MATERIALS AND NANOCOMPOSITES NANOFUN-POLY, NETWORK OF EXCELLENCE WP14 : Spreading of Excellence - Communication.
OPERATIONAL GUIDELINES Ensuring Ownership of PARSEL by Partners.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
EPOCA – 11. June EPOCAConsortiumOrganisation.
Welcome. Project aim – a reminder To build the skills of women entrepreneurs involved in rural tourism and crafts To improve the quality of training provided.
WP 9: Dissemination of results and exploitation RENESENG kick off, Athens, Nov 2013.
WP1 Consortium management OBJECTIVES To ensure compliance with the Grant Agreement and Consortium agreement Specific objectives: 1: To secure day-to-day.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
Initial plans for WP 4 KickOff Meeting ICT-AGRI 2.
1 WE-Mentor preparatory meeting Stuttgart 12/2006 WE-Mentor Enterprising women in European Research mentoring India/Israel/Romania/Turkey WP5 - Dissemination.
CODE 2 Cogeneration Observatory and Dissemination Europe Kick-off meeting July 2012 WP1 Management 10-11/07/2012COGEN Europe.
Progress Meeting WP4 status review Teleconference with GMV, GSA Konstandinos Diamandouros 16/12/2010 GNSS for INnovative road Applications.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 – Dissemination, Exploitation Strategy and Standardization Inova+ Co-Living.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
11 June WP4 Forum and dissemination By Kim Haugbølle, WP4 leader Forum meeting 6, DG ENTR, Brussels.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
EPOCA – 11. June EPOCA Project Management (WP1): Deliverables and reporting 11. June 2008.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems WP10: Dissemination, Transfer and Exploitation Review.
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the BSR Project Lead Partner: Fire and Rescue Department under the Ministry.
Administrative matters Katherine Loens. The periodic activity report: Section 1 – Project objectives and major achievements during the reporting period:
JCN, Justice Cooperation Network European treatment and Transition management of High Risk Offenders.
WP7 - workshop. Project newsletter – Electronic format Partners’ mailing lists – Inform about partners’ participation in InterQuality – Ongoing information.
EATWELL WP6 Dissemination Work package leader: EUFIC.
SOLARNET DISSEMINATION AND COMMUNICATION PLAN SOLARNET DISSEMINATION AND COMMUNICATION PLAN (Outreach Plan) SOLARNET PROJECT OFFICCE.
INFSO-RI Enabling Grids for E-sciencE NA2 Dissemination and Outreach Joanne Barnett, EGEE External Relations Officer, TERENA Secretariat.
Presentation of Work Package 6 (WP6) “Design and implementation of Dissemination Activities” MATcHES Kick-off meeting Feb 2014 Ruse, Bulgaria TEMPUS BG-TEMPUS-JPHES.
ASTERICS Kick-off meeting 26 May Collaboration Coordination Celebration Rob van der Meer, ASTRON, ASTERICS Project manager.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
Kick Off Meeting Largs, Scotland
WP9: Dissemination and Exploitation
ARIES WP2 Task 2.2 kick-off Coordination, support and enhancement of communication/outreach activities for accelerators in Europe Jennifer Toes (CERN),
AMICI WP1 – Management, coordination and dissemination
UNISEC Universal Influenza Vaccines Secured
Venue: WIIW, Vienna Loredana Marmora and Margaret Pesuit, ISIS
Reports Activities since last meeting in Lund #1
Annual Report Instructions
ERASMUS+ KA2 PROJECT: Enhancement of study programs in Public Health Law, Health Management, Health Economics and Health Informatics in Montenegro “DISSEMINATION.
2° Project Meeting Modena – 23/01/2018
BioMedBridges – Work Packages 2 & 12
AMICI WP1 – Management, coordination and dissemination
MARDS DISSEMINATION & EXPOILTATION
University “Mediterranean” Podgorica & University of Montenegro
Presentation transcript:

WP 6 Dorota Pawlucka Progress Meeting Amersfoort,

Overall objectives Protection of knowledge Exploitation of project results (exploitation plan due in month 36) and Dissemination of project results to attain a clear visibility of the project and a dialog with relevant scientific and industrial groups Notice of 45 days => upload to the forum

Exploitation Marketing strategy => WP leaders + Exploitation Panel + Advisory Board Exploitation plan due in M 36 but already there in DoW Advisory Board meeting in Month 18

Dissemination Publications in scientific journals (all partners) Presentations and posters during relevant conferences (all partners) Networking (all partners) Public website area (general information and public deliverables) (TUDO) A plan for knowledge dissemination and update (TUDO) => to maintain the website => organise common project presentations => control the release of publications in the consortium.

From DoW Journals Chemical Engineering and Processing Chemical Engineering Journal Journal of Process Control Chemical Engineering Science Computers and Chemical Engineering Conferences EPIC, IMRET, IFAC, DYCOPS, ESCAPE, ESCAPE/PSE, and ECCE.

Dissemination Plan Communication strategy => What do we want to communicate, to whom and how? Tools: => Website (available since Jan 13 – update – links partners, news => inputs required) => Template ppt, logo (available) => Poster => Newsletter (when?) => Brochure (when?) => Standard project presentation (?)

WP 7 Dorota Pawlucka Progress Meeting Amersfoort,

Overall objectives Supervision of progress and risk management On-going support for the consortium partners Controlling and reporting to the EC

Reporting D7.1) First biannual report: [month 6] D7.2) Second biannual report: [month 12] D7.3) First progress report: [month 18] D7.4) Third biannual report: [month 24] D7.5) Second progress report: [month 30] D7.6) Fourth biannual report: [month 36] D7.7) Final report: [month 42]

Structure of reports Publishable summary Objectives for the period Progress and achievements for the period (WP by WP) Deviations and corrective actions Project management Financial statements Explanations of use of the resources Financial certificates (if applicable)

Communication

Next meeting? Sairem/Lyon December 2013 / January 2014

Questions? Suggestions?