November 7, 20011 Transition Planning 1.Purpose & Scope 2.Phase List 3.Key Assumptions 4.Transition – Phase by Phase.

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software.
Flight Readiness Review New Mexico Space Grant Consortium University/Institution Team Members Date.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Design Team Report: AO Operational Tools (aka Acquisition and Diagnostics) Christopher Neyman W. M. Keck Observatory (for the Operational tools team) Keck.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
January, Please join us in the Tech Tower Auditorium on Tuesday, January 30th for a WFC3 Post-CDR Celebration 4:30 to 7:30 pm Dinner and adult beverages.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
From Research Prototype to Production
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
1 Configuration Management “The Cookbook Approach”
FCS - AAO - DM COMPE/SE/ISE 492 Senior Project 2 System/Software Test Documentation (STD) System/Software Test Documentation (STD)
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
September 10, TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit.
1 STScI Pipeline Thermal-vacuum data handling I. Neill Reid for WFC3 Instrument CALibration team ICAL.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
Final Version Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Mission Operations Tim Rykowski Jeffrey Hosler May 13-17, 2002.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
ASPERA-3 Jan. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 1_25/ Page 1 Monthly Status Report Report due 1/25/01 Schedule statused.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Instrument Status GLM Science Team Meeting 9 September 2016 Marc Rafal/GSFC GLM Instrument Manager.
October 1, TaskLeadDue Dates COS FSW Build 3.1 (Preparation for MEB Functional) HW needs: fully functional Mechanism Simulator 1.Complete unit level.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Solar Probe Plus A NASA Mission to Touch the Sun Mission Operations Review News Elena Adams 7/16/2015.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
MODIS SDST, STTG and SDDT MODIS Science Team Meeting (Land Discipline Breakout Session) July 13, 2004 Robert Wolfe Raytheon NASA GSFC Code 922.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
1 COS SI Testing and Delivery SI formally delivered to HSTP in May  N 2 purge alignment and NUV throughput testing pre- and post-ship  No effective alignment.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 27 June 2002.
I&T&C Organization Chart
THEMIS Mission Assurance
WFC3 STUC 18 November 2004 Optical Stimulus.
0.0 Instrument Suite Name Presenter’s name
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Thermal Vacuum Test: Plans and Procedures
Integration and Test Organization Chart
Instrument Preliminary Design Review (I-PDR) June 27th, 2005
HART Technologies Process Overview
Integration and Test Organization Chart
STScI Ground System Development Status:
Integration & Test Instrument Operations Coordination
Presentation transcript:

November 7, Transition Planning 1.Purpose & Scope 2.Phase List 3.Key Assumptions 4.Transition – Phase by Phase

November 7, Purpose & Scope Purpose: Define the activities, roles and responsibilities associated with transitioning the software and operations responsibilities from Ball to other program organizations for the COS and WFC3 programs. Scope: Transition plan covers the time period from instrument testing at Ball through on-orbit verification in sufficient detail to permit planning and acquisition of the resources necessary to be successful at each phase.

November 7, Gradual transition over multiple phases provides effective transfer of knowledge Phase List: 1.Instrument integration and functional testing for end-to-end system level verification 2.Environmental Testing & Calibration 3.VEST Testing 4.Servicing Mission & On-orbit Verification

November 7, Key Assumptions COS: Environmental test activities will be split between Ball and GSFC Thermal Vacuum testing at Ball, Acoustics & EMI at Goddard Funding will be available for approximately 3 Ball SW/Ops staff for a year after instrument delivery SI delivery date: November 2002 Flight software maintenance & operations transition: after VEST WFC3: Instrument integration and functional testing phase will start in Colorado and finish in Maryland Ball funded SW/Ops staff terminates support at delivery of flight detectors to Goddard (December 2002) SI delivery date: August 2002 Flight software maintenance & operations transition: during Phase 1

November 7, Instrument Integration & Functional Test Phase Phase Description: Instrument assembly completed with all flight components installed. In some cases surrogate assemblies may substitute for the flight parts. The phase is complete when system level functional testing and initial calibration prove compliance with CEI specification requirements. Agency with Primary Responsibility & Location: COS: Ball will be responsible for these activities to be performed in Boulder CO. WFC3: Component electrical, mechanical and optical integration will be performed at Ball. Integration of flight detectors & optical bench with enclosure will be accomplished at Goddard.

November 7, COS Instrument Integration & Functional Test Phase Teams List & Personnel: Colorado Flight Software : Chris Dorato (Lead), Robert Gillett, Linda Krauze Non-Flight Software: Dina Demara, Stephane Beland Software Test & Certification: Denise Miller (Lead), Steve Pitts, Gary Wilberger, Ken Brownsberger, Tina Fredo Instrument Operations: Sue Ross (Lead), Linda Remstad, Hugh Murphy, Ken Brownsberger Instrument Database: Chris Blue SITS: TBD Ron Barasch will plan this group On-Site Program Support: Randy Stevens, Michelle Troeltzsch Software Quality Assurance & Configuration Management: Soraya Fowler, Justin Ahrens STScI Command Development & Engineering Support: Wayne Baggett, Marsha Allan, Tom Wheeler

November 7, WFC3 Instrument Integration & Functional Test Phase Teams List & Personnel: CO Flight Software : Chris Dorato (Lead), Gavin Payne, Dominic Florin, Jason Held, JP MD Flight Software : Brian Rehm, TBD CO Timing Pattern Development & Maintenance: Ron Shrein MD Timing Pattern Development & Maintenance: TBD CO Non-Flight Software: Dina Demara, Jeff Pugliano MD Non-Flight Software: TBD Software Testing & Certification: Denise Miller (Lead), Steve Pitts, Gary Wilberger, Brian McLaughlin, Lockheed Martin Instrument Operations: Tim Schoeneweis (Lead), Todd Barto, Jeff Pugliano Instrument Database: Adam Thodey SITS: TBD Ron Barasch will plan this group On-Site Program Support: Randy Stevens, Michelle Troeltzsch CO Software QA & Configuration Management: Soraya Fawler, Justin Aherns MD Software QA & Configuration Management: TBD STScI Command Development & Engineering Support: Olivia Lupie, TBD, Tom Wheeler

November 7, Activities Performed, Products Developed & Personnel Resources: SW/Ops Test Benches: COS – both benches & SITS strings stay in Colorado for this phase WFC3 – ship one bench & one SITS with instrument Software maintenance: COS – CO flight and non-flight software groups w/ CM build support WFC3 – transition period between optical bench & detector shipments. Colorado retains overall responsibility through end of phase. Software component & qualification testing: COS & WFC3 – completed before SI shipment w/ Colorado test teams Software configuration control board (CCB): Called for changes to SW requirements & for SCRs after SW FQT COS & WFC3 – CO & MD software, CM & QA groups as needed Additional support provided by Colorado University & STScI Instrument Integration & Functional Test Phase

November 7, Instrument Integration & Functional Test Phase Activities Performed, Products Developed & Personnel Resources: Instrument operations & database maintenance including: Database deliveries to the PRD office w/ certification status System Functional Test procedure w/ servicing msn AT/FT System FT post test data analysis and data archive procedure Instrument operations support for I&T COS – Colorado operations and database team at Ball WFC3 – Colorado operations and database teams support activities at Ball and GSFC Training: WFC3 – Colorado will provide flight software training to the Maryland group

November 7, Instrument Integration & Functional Test Phase Activities Performed, Products Developed & Personnel Resources: Software Test Anomaly Review Board for CTAR & WTAR: Problem tracking for issues found during SW development & test using the SW/Ops test benches Software issues result in Software Change Requests Database issues result in Database Change Request Electronics and other hardware issues result in TBD COS & WFC3 – All Colorado teams as required System Test Anomaly Review Board for TAWS & HAR: Problem tracking for issues found during system level testing on FHW Software issues result in Software Change Requests and are approved by the Software CCB (and it’s associated members) Database issues result in Database Change Request Electronics and other hardware issues result in TBD COS & WFC3 – All Colorado teams as required

November 7, Instrument Integration & Functional Test Phase Activities Performed, Products Developed & Personnel Resources: STScI Timing Test & SMS Integration: Provides time-to-complete information for all stored commands Supports test & verification of Institute stored command processing COS & WFC3 – Tom Wheeler & Institute commando team with Colorado operations support as required. Science Data Image Generation : Simulated and detector image data for Institute Back End system testing COS: details defined in STScI Memo of Understanding – Nov 30, 2000 WFC3: details define in STScI Memo of Understanding – TBD COS – Colorado operations team WFC3 – Colorado operations team transition to MD operations team

November 7, Instrument Integration & Functional Test Phase Activities Performed, Products Developed & Personnel Resources: Software & Operations Documentation: Overall responsibility transitions when the instrument is delivered Responsible individuals for specific documents may stay the same COS – Transition responsibility to Maryland at the end of this phase WFC3 – will transition overall responsibility during this phase as defined in the next two pages.

November 7, Instrument Integration & Functional Test Phase Activities Performed, Products Developed & Personnel Resources: WFC3 SW/Ops Document ListColorado RITransition Needed Maryland RI DM-01 SI Commands ListAdam ThodeyYesTBD DM-02 Engineering Data ListAdam ThodeyYesTBD DM-03 FSW Documentation - Unit Development Folders - Users Manual: * Initial – August 2002 * Final – December 2002 Chris Dorato - Yes TBD DM-04 GSE SoftwareChris DoratoNo

November 7, Instrument Integration & Functional Test Phase Activities Performed, Products Developed & Personnel Resources: WFC3 SW/Ops Document ListColorado RITransition Needed Maryland RI DM-05 Command DefinitionMike DraugelisYesTBD DM-06 Science Data FormatAdam ThodeyYesTBD DM-07 FSW Test PlanDenise MillerNo DM-08 FSW Test ProcedureDenise MillerNo DM-14 Telemetry Calibration ListAdam ThodeyYesTBD OP-04 Constraints And RestrictionsTodd BartoNoTodd Barto OP-04 Operations LimitationsTodd BartoNoTodd Barto

November 7, Environmental Testing & Calibration Phase Phase Description: Instrument testing for material and workmanship verification. This phase also provides for instrument & data processing calibration within the limits of ground system environment. The phase is complete when the three tests listed below have been completed. Agency with Primary Responsibility & Location: COS: Ball will be responsible for instrument level Thermal Vacuum. Acoustics & EMI testing will be conducted by Goddard personnel in Maryland. WFC3: GSFC is wholly responsible for this phase.

November 7, Environmental Testing & Calibration Phase Activities Performed, Products Developed & Personnel Resources : SW/Ops Test Benches: COS: Ship one SW/Ops test bench & one SITS with the SI. WFC3: One bench remains at Ball to support operations (TV SMS dry runs) Software Maintenance: COS: Colorado will retain responsibility for flight software throughout this phase. WFC3: flight software maintenance will be controlled by GSFC. Colorado can provide additional support if needed. Operations: COS: Colorado operations team through TV and delivery to GSFC. Will need additional support on SI delivery to GSFC. WFC3: Need to create an operations team at Goddard. Tim Schoeneweis is short term travel, Jeff Pugliano is long term travel, Todd Barto is TBD.

November 7, VEST Testing Phase To Be Supplied Later

November 7, Servicing Mission & On-Orbit Verification Phase To Be Supplied Later