Jeff Sestokas November 10, 2009 ARA Project Manager Course Introduction Project Management for ARA Engineers and Scientists.

Slides:



Advertisements
Similar presentations
Successful Project Management Justice, E-Government, & the Internet June 28, 2000 – Dallas, Texas Lawrence P. Webster.
Advertisements

Proposal / Request For Proposal Proposal / Request For Proposal Initiation Control Planning Close-down Execution.
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
International Campus – Kish Sharif University of Technology Session#6.
Blues Chapter CSEP 1 Earned Value Management System (EVMS) Ron Fradenburg Blues Chapter President 19 March 2013 For more information visit:
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Dr. L. K. Gaafar The American University in Cairo
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
Successful Project Management Justice, E-Government, & the Internet June 28, 2000 – Dallas, Texas Lawrence P. Webster.
Introduction to ARA’s Proposal Resources Don Cole
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
EPLC Deliverables Sherry Brown-Scoggins & Wanda Hall
Other Planning Processes: Final Planning Touches
Don Cole Risk Assessment and Mitigation Project Management for ARA Engineers and Scientists.
Project Management Lecture 5+6 MS Saba Sahar.
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
Project Management Process Overview
PMP® Exam Preparation Course
© VESP International Pty Limited To Contents Slide CLICK to advance slides/ bullet points within slides Integrated Master Planner An Overview.
Bellevue Planning Exhibits1 Welcome to Project Planning Instructor Phyllis Sweeney Project Planning Class.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 15 Project Management McGraw-Hill/Irwin.
Project ManagementDay 1 in the pm Project Management (PM) Structures.
From Research Prototype to Production
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Felix Sanchez Designing the Program Structure and Organization Project Management for ARA Engineers and Scientists.
What’s a Project? AD642. Why the Emphasis on Project Management? Copyright 2011 John Wiley & Sons, Inc. 1-2  Many tasks do not fit neatly into business-as-usual.
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
What’s a Project? AD642. Copyright 2011 John Wiley & Sons, Inc. Why the Emphasis on Project Management? 2 ❑ Many tasks do not fit neatly into business-as-usual.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Task: Copyright © 2003 PM tec, Inc; D. Sankey; D. Padelford. All rights reserved. 1 Fast Start For Projects  Electric Dipole Moment Project Facilitator:
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Project Management Course WebEx Introduction Don Cole & Felix Sanchez Project Management for ARA Engineers and Scientists.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Project Life Cycle.
Managing CMMI® as a Project
LBNE Working Group Meeting December 20, :00– 5:00 PM Snake Pit.
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Manager Core Competencies The core competency.
Peg Johnson, Owner EVMS-Solutions 1 Peg Johnson
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
Felix Sanchez Estimating the Budget and Cost (Part 1) Project Management for ARA Engineers and Scientists Developing a Bottoms Up Estimate.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Copyright © 2008 Industrial Committee on Program Management. All rights reserved. Predictive Measures of Program Performance March 19, 2009 Industrial.
Felix Sanchez Student Simulation Exercise Project 2 Project Management for ARA Engineers and Scientists.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
Felix Sanchez Integrated Master Plan (IMP) and Integrated Master Schedule (IMS) Project Management for ARA Engineers and Scientists.
Jeff Sestokas Estimating the Budget and Cost (Part 2) Project Management for ARA Engineers and Scientists Developing an Estimate from the Top Down.
APPLICATION GUIDE January 27, 2006 Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed Martin Telephone ;
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Process Workplates Project Process Workplates.
What is project management?
The Project Plan Plan Your Work, then Work Your Plan
Felix Sanchez and Don Cole
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Week 2 – Risk Planning & Identification. Risk & Risk Management.
NDIA PMSC Baseline Stability Working Group February 2010 Neil Albert Pete Wynne.
Copyright All Rights Reserved by
ISA 201 Intermediate Information Systems Acquisition
TechStambha PMP Certification Training
Lockheed Martin Canada’s SMB Mentoring Program
Project Management Process Groups
Project Integration Management
Project Integration Management
Presentation transcript:

Jeff Sestokas November 10, 2009 ARA Project Manager Course Introduction Project Management for ARA Engineers and Scientists

Copyright All rights reserved. Applied Research Associates, Inc. 2 Overview  Administrative Information  Desired Learning Objectives (DLOs) for the PM Course  Why do we Need a Program Manger’s Course?  PM Course Overview  “Cradle to Grave” Roadmap of a Successful Program  Introduction of Instructors

Copyright All rights reserved. Applied Research Associates, Inc. 3 Administrative Info  Meals (breakfast and lunch) and Thursday “Graduation” Dinner  Logistics and locations  How to access wireless, supplies, etc.  Other details wrt to logistics and activities outside of class  Workbooks/Handouts, CD of course materials, other resources provided

Copyright All rights reserved. Applied Research Associates, Inc. 4 PM Course Desired Learning Objectives  Train qualified Project Managers and Principal Investigators  Instill the ARA culture for excellence in Project Management, Technical Performance and Marketing  Learn applicable tools/processes and best practices that can be adapted for any project, regardless of size, duration and complexity  Provide team building opportunities and interactions Have Fun!

Copyright All rights reserved. Applied Research Associates, Inc. 5 Why Do We Need an ARA Project Manager’s Course?  The Current Environment – the competition is tough! ARA is now a large business competing with SAIC, Northrop Grumman, Lockheed Martin, etc. ARA is seeking larger prime contracts  ARA’s PM is the Key to our Success ARA continues to lean on the PM as we grow Share tools and success experience with new PMs Formal PM training provides mechanism to share proven approaches The 30 Years of ARA’s Reputation is in YOUR Hands!

Copyright All rights reserved. Applied Research Associates, Inc. 6 Why Do We Need an ARA Project Manager’s Course?  Our Customers are Requiring Best Practice Management Approaches Integrated Master Plans, integrated Master Schedules, tailored Earned Value Management, etc. for middle and large programs Proven Best Practices influence award decisions Past Performance Evaluations: significant influence on new award decisions

Copyright All rights reserved. Applied Research Associates, Inc. 7 Industry Best Practices Expected for S/W Development -- CMMI  ARA has developed a standard Project Life-Cycle – CMMI Level 3 Phases have standardized set of work products Milestones ensure phases are complete Flexible to match up with customer needs Scoping & Planning Design Analysis Implementation & Integration Acceptance & Release Testing Project Award Software Requirements Review Prelim. Design Review Critical Design Review Test Readiness Review Acceptance Test Release Phases Milestones

Copyright All rights reserved. Applied Research Associates, Inc. 8 Project Planning Management Process Required for CMMI  Project Objectives/Goals  Requirements  Project Organization  Task Definition  Schedule  Cost  Resource Requirements  For Projects with a Significant Software Element: Software Processes Software Standards Software Development/Test Environment Software Licenses  For Projects with a Significant Hardware Element: Laboratory Processes Safety Procedures Hardware Test Development/Environment Production/Inspection Processes  Documentation  Risk Analysis and Reduction  Training  Project Constraints  Product QA and Process QA  Configuration Management  Security This PM course will show how to link the Master Plan, the Master Schedule and the Program Control

Copyright All rights reserved. Applied Research Associates, Inc. 9 Five Elements for Program Management 1.Organization: Define contractual effort and assign responsibility for work. 2.Planning and Budgeting : Plan, schedule, budget and authorize work. 3.Cost Reporting: Accumulate cost of work and material. 4.Analysis: Compare planned and actual costs to performance and analyze variances. Develop estimates of final cost. 5.Close Out: Ensure within cost and schedule and market follow-on efforts. Work Breakdown Structure (WBS) Program Organization Task Definition Schedules Budget (Resource Loaded Network) Cost Reporting Performance Measurement Variance Analysis Reports (VAR) Estimate at Completion (EAC) Close Out Performance Measurement Close Out

Copyright All rights reserved. Applied Research Associates, Inc. 10 PM Course Overview  PM Responsibilities  Define the Program Structure Review SOW Scope Design the Work Breakdown Structure (WBS) – Driven by SOW  Design the Team Organization Driven by WBS or by Customer (Integrated Product Team [IPT], Contract Requirements, etc.) Driven by Size of Project or Cost  Design the Plan and Schedule Integrated Master Plan Integrated Master Schedule

Copyright All rights reserved. Applied Research Associates, Inc. 11 PM Course Overview  Estimate the Budget and Cost Identify the Staff and Resources Estimating Methods to Develop Costs Use WBS and Staffing to Budget and do a Pre-Cost Proposal – ROM – Within Customer’s Bogey  Develop the “Real” Program Plan after Winning the Proposal  Manage and Lead with Excellence Program Control and Performance Measurement Cost and Schedule Variance Analysis  Simulation-Based Exercises for 35% and 65% Quality Reviews  Closing Out the Project

Copyright All rights reserved. Applied Research Associates, Inc. 12 Detailed Agenda in Workbooks K – Knowledge C – Comprehension Ap – Application An – Analysis S – Synthesis E - Evaluation

Copyright All rights reserved. Applied Research Associates, Inc. 13 Roadmap: “Cradle to Grave” of a Program RFP Received Proposal Submitted Contract Award Draft IMP/IMS IMP/IMS Review SOW, Tech Reqmnts, CDRL Reqmnts, etc. Define WBS and Identify Team Structure Define Program Baseline (Draft IMP and IMS) Determine Staffing and Develop Responsibility Assignment Matrix Tailor/Document Program Processes (i.e., Program Control, EVMS, etc.) Identify Schedule/Cost/ Technical Risks Develop Program Schedules Establish Program/Metrics IMP/IMS Cost Proposal Program Plan with Program Structure, Schedule, Cost Estimates (update as required) Blue Team Review Project Plan Approval Q&A’s

Copyright All rights reserved. Applied Research Associates, Inc. 14 Roadmap: “Cradle to Grave” of a Program Project Plan Approved Regular Staff Mtg. 35 and 65% Reviews Customer Reviews Final Report Close out of Project Customer Feedback Celebrate! Leadership of Management and Technical Effort Execute Program Control, EVMS, Cost Reporting, etc. Manage Schedule/Cost/ Technical Risks Update Program Schedules Performance Measurements Customer Feedback

Copyright All rights reserved. Applied Research Associates, Inc. 15 Intro and Bios of Instructors  Don Cole – 30+ years of project management experience with 15 years specifically in the test and evaluation field with task order projects of $45 million over five year increments.  Felix Sanchez – 30+ years of project management and acquisition experience, with large program execution and large proposal experience. Certified Defense Acquisition PM Level III.  Kathy Daniels – 20+ years experience in the government contract field. Seasoned Instructors Roman Engineering Time tested experience