IAIA 2007, Seoul, South Korea Detroit River International Crossing Project Navigating the Multi-Jurisdictional Maze for a Large-Scale Transportation Project.

Slides:



Advertisements
Similar presentations
A Multimodal Goods Movement Strategy for Ontario Canada-United States Transportation Border Working Group Fall Plenary November 7 – 8, 2012 James Perttula.
Advertisements

Identify Problems, Planning Objectives and Constraints.
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
BI-NATIONAL PARTNERSHIP STUDY Canada-U.S.-Ontario-Michigan Partnership Border Study.
Scoping the Business Case for SDI Development A Study Commissioned by the GSDI Steering Committee.
Presentation by Cambodian Participants Phuket, Thailand February 2012 Health Impact Assessment Royal Government of Cambodia.
1 An EU Strategy for the Danube Region : Transport Working Group meeting Transport priorities Brussels, 16 September 2010 Johann Sollgruber, DG REGIO,
Environmental Impact Assessment Myriam Raiche November 8, 2007.
Lecture(2) Instructor : Dr. Abed Al-Majed Nassar
MTF Rail Development Forum
Adapting to Climate Change: Canada’s Experience and Approach Elizabeth Atkinson Climate Change Impacts and Adaptation Directorate Natural Resources Canada.
Okanagan Basin Conservation Programs (SOSCP and OCCP) 80+ organizations (government and non-government) working together to achieve shared conservation.
Environmental Management Services
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Created by Steven WevodauSteven Wevodau Detroit River International Crossing Study June 29, 2009 Mohammed Alghurabi Senior Project Manager IRWA’s 55th.
Detroit River International Crossing (DRIC) Study 2007 Ohio Conference on Freight Toledo, Ohio September 18, 2007.
1 Transportation Border Working Group Calgary, Alberta October 21, 2004 Presented by: Kris Wisniewski Canada-U.S.-Ontario-Michigan Border Transportation.
1 Presentation for Border Transportation Partnership Detroit River International Crossing May 31, 2005.
A Common Immigration Policy for Europe Principles, actions and tools June 2008.
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
1 Brace Centre for Water Resources Management McGill University, Sept. 25 François Boulanger, Regional Director The New Canadian Environmental Assessment.
Environmental Impact Assessment (EIA): Overview
SNH PERSPECTIVE ON PLANNING AND THE ENVIRONMENT Derek Manson Planning Adviser.
Overview of Activities of Twining Partnership VIETNAM - KOREA N.M. HANG, Office 33.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
EIA: A framework for ESDM. EIA: A Framework for ESDM. Visit Defining EIA Environmentally Impact Assessment is A formal process for.
Meeting Agenda Stakeholder Participation Panel July 14, 2003 Welcome/Introductions Study Overview Tasks/Products/Schedule Traffic Patterns Break Key Project.
Federal Government’s Role in Promoting Innovative Financing Northern Border Finance Workshop - May 16, 2007.
Rome Energy Meeting 2008 Rome, November 2008 Investments Opportunities and Project Finance in the Energy Market Luigi Marsullo President Finpublic.
Contribution of the Territorial Cooperation Programmes to the EU Strategy for the Danube Region Kiril Geratliev, Director General “Territorial Cooperation.
MUS pilot project in Honduras Testing guidelines for planning and implementation of multiple use services.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
Commissioning Self Analysis and Planning Exercise activity sheets.
International Comparisons - CANADA "Are there emergency management principles promoted in Canada and what influence do they have on the practice and teaching.
Strategic Priorities of the NWE INTERREG IVB Programme Harry Knottley, UK representative in the International Working Party Lille, 5th March 2007.
Secondary & Cumulative Effects Analysis Training Program Maryland State Highway Administration’s Secondary and Cumulative Effects Analysis Guidelines For.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
Canada’s Federal Environmental Assessment Regime Presentation to the Forum of Federations Environmental Assessment Conference Ottawa, Canada September.
Linking Planning & NEPA Overview Mitch Batuzich FHWA Texas Division FHWA Texas Division April 17, 2007.
The SSMP Process 1. The Servicing and Settlement Master Plan A plan to encompass the community’s visions and ideas, while approaching planning and servicing.
Neighbourhood Planning. What is neighbourhood planning? Neighbourhood planning gives communities direct power to develop a shared vision for their neighbourhood.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
Greening the Trade Corridors in North America: Why Corridors and Why Green? Benjamin Teitelbaum CEC, April 22 nd.
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Evaluation and Review of Experience from UNEP Projects.
SEA in the Czech Republic Prague, 24 September 2008.
Environmental Assessment in British Columbia Forum of Federations Conference September 14, 2009.
USA Parkway Project Welcome Public Information Meeting to the
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
1 PRIVACY SUB-COMMITTEE UPDATE PSCIOC Meeting February 9, 2004 Chris Norman Executive Director, Ministry of Management Services, Government of B.C.
Global Geospatial Information Management (GGIM) A UN-DESA Initiative in collaboration with Cartographic Section, DFS Stefan Schweinfest UNSD.
Commission Guidance on inland waterway development in the context of the EU Birds and Habitats Directives Kerstin Sundseth, Ecosystems LTD.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
Experience of SEA in Scotland IAIA 07 Seoul 5 June 2007 Amanda Chisholm.
The TBWG/Bi-National Planning: A TC Perspective Jacques Rochon, Director, Highway Policy Transport Canada, December 4, 2002.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
Detroit River International Crossing Project March 31, 2010.
planning aid for scotland unique national charity helping people engage with planning impartial & independent not part of Scottish Government or any Local.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
9 th International HIA Conference A framework for public health officials to integrate HIA considerations in municipal project undertakings for the City.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
Oregon State Rail Plan Update
Municipal Class Environmental Assessment
Local Government Engagement and Communication Strategy
Cross-Border-Cooperation in
Loddon Campaspe Integrated Transport Strategy
National Environmental Policy Act (NEPA)
Loddon Campaspe Integrated Transport Strategy
Strategic Environmental Assessment (SEA)
Improving information exchange:
Presentation transcript:

IAIA 2007, Seoul, South Korea Detroit River International Crossing Project Navigating the Multi-Jurisdictional Maze for a Large-Scale Transportation Project Kaarina Stiff, Transport Canada

IAIA 2007, Seoul, South Korea  The maze

IAIA 2007, Seoul, South Korea The Border Transportation Partnership

IAIA 2007, Seoul, South Korea Background An international transportation project to add new border crossing capacity at the busiest land crossing between Canada and the United States A practical example of how to coordinate the legal requirements of multiple jurisdictions for a major transportation project

IAIA 2007, Seoul, South Korea Location

IAIA 2007, Seoul, South Korea Why a new crossing? Windsor-Detroit Gateway is the single busiest border crossing between Canada and the U.S Over next 30 years, cross-border truck traffic is expected to increase by 128%; passenger traffic is expected to increase by 58%

IAIA 2007, Seoul, South Korea Highlights Multi-jurisdictional coordination –Two countries, four levels of government, three EA regimes Significant technical challenges –Densely populated urban areas with different development patterns –Historical salt mining activities; high water table; shallow depth to bedrock –Protected natural area within Windsor city limits Sophisticated stakeholders on both sides of the border, often with competing interests –Citizens and communities –Private sector interests –Local municipalities –Border users – commuters, manufacturers

IAIA 2007, Seoul, South Korea Meet all of our legal requirements –Ontario Environmental Assessment Act –Canadian Environmental Assessment Act –United States National Environmental Policy Act Demonstrate this to stakeholders Manage legal risk Coordination objectives

IAIA 2007, Seoul, South Korea Background Discussion today will look at three elements of coordination: –Coordinating the planning processes under OEAA and NEPA –Coordinating Canadian requirements under OEAA and CEAA –(Using this information to satisfy SEA requirements in Canada)

IAIA 2007, Seoul, South Korea OEAA and NEPA Focus of OEAA and NEPA is generally the same: –Begin with ‘purpose’ and ‘need’ for the project –Identify and analyze alternatives –Select a preferred alternative based on a clear and traceable analysis Purpose of DRIC is to provide additional border crossing capacity between Windsor, Ontario and Detroit, Michigan –“… to promote the safe, secure and efficient movement of people and goods between Canada and the U.S. …” –“…end-to-end solution that includes a new river crossing, and freeway connections and customs inspection plazas in both countries

IAIA 2007, Seoul, South Korea Evaluation Process Select Technically and Environmentally Preferred Alternative; Refine & Complete Preliminary Design Refine and Assess Practical Alternatives Assess Illustrative Alternatives & Identify Practical Alternatives Purpose of the Undertaking Assess Planning Alternatives and Develop Illustrative Alternatives Purpose of the Undertaking Assess Planning Alternatives and Develop Illustrative Alternatives Steps in Evaluation Process TIME Aug ‘05 Jan ‘06 Jan ‘07 Dec ‘07 NUMBER OF ALTERNATIVES AMOUNT OF ANALYSIS

IAIA 2007, Seoul, South Korea Evaluation Factors 1.Changes to Air Quality 2.Protection of Community & Neighbourhood Characteristics 3.Consistency with Existing & Planned Land Use 4.Protection of Cultural Resources 5.Protection of Natural Environment 6.Improve Regional Mobility 7.Minimize Cost

IAIA 2007, Seoul, South Korea Illustrative Route Alternatives

IAIA 2007, Seoul, South Korea Practical Alternatives: Area of Continued Analyses (ACA)

IAIA 2007, Seoul, South Korea OEAA and CEAA OEAA applies to provincial agencies that propose certain ‘undertakings’ –Identification and analysis of alternatives, to determine which alternative provides the best balance between project need and protecting the environment CEAA applies to federal authorities who take certain actions in relation to a “project”, as defined by the Act –Decision is focused on whether “the project is likely to cause significant adverse environmental effects The OEAA is typically applied earlier, which can create difficulties coordinating with the federal regime; however the processes can be very complimentary (if we work at it)

IAIA 2007, Seoul, South Korea Challenges Different focus / legal framework OEAA is focused on analyzing alternatives; CEAA decision is focused on the significance of the effects of the ‘project’ For screening level assessments under CEAA, consideration of alternatives is discretionary “Environmental effect” under CEAA is more focused on the biophysical environment Lack of project details in early stages makes it difficult for federal agencies to fully articulate information needs Limited resources In the absence of project details, federal agencies need to decide where to focus their resources; lack of early participation can result in information gaps later in the process

IAIA 2007, Seoul, South Korea What this meant for DRIC Provincial process starts with the identification of the undertaking: e.g., developing new border crossing capacity –We didn’t know where it would go, or what it would look like (bridge or tunnel); we started with a “problem” not a “project” Federal process starts with a Project Description which needs to define the project in enough detail for federal authorities to determine if they have an EA responsibility in relation to the project –We didn’t know which watercourses we might cross, whether we would have piers in the water, or how close we would be situated to the tall-grass prairie reserve; lack of info makes it difficult to rally the troops

IAIA 2007, Seoul, South Korea Tools for DRIC Transport Canada participation in the Border Transportation Partnership –Steering Committee and Working Group includes representatives from all four partnership agencies –Joint decision making helps to ensure that we can achieve an end- to-end solution that works for all jurisdictions Canada-Ontario Agreement on Environmental Assessment Cooperation provides a framework to coordinate EA requirements –Canadian Environmental Assessment Agency and Ontario Ministry of Environment provide coordinating function for process issues; helps to encourage early involvement, which is further facilitated by TC’s role as a de facto ‘proponent’

IAIA 2007, Seoul, South Korea DRIC Approach Federal review of provincial Terms of Reference –TOR is a specific provincial requirement, but federal agencies provided comments and identified key areas of interest; familiarity with the early stages helped to streamline later stages of the process Federal review of provincial work plans for each subject area, such as air quality and natural heritage –Early input on study design ensured that federal information needs were identified as early as possible; specific needs can be refined as the study proceeds –Still difficult for federal authorities to provide “project” advice, but they can at least agree (or not disagree) with methodologies, and they’ll be up to speed when we do decide what we’re doing

IAIA 2007, Seoul, South Korea DRIC Approach Federal process formally triggered with the identification of the ‘area of continued analysis’ –“Early” trigger was possible once additional project details were identified during the selection of practical alternatives, even though the specific details have not yet been defined –We still didn’t know where we’re going, but we had a better idea Development of federal EA guidelines undertaken in parallel with the analysis of the practical alternatives, drawing on the work already being done –Analysis of practical alternatives generated additional information that federal authorities can use to determine if they have responsibilities or expertise that is related to the ‘project’; this can be refined when the preferred alternative is selected

IAIA 2007, Seoul, South Korea Are we successfully navigating the maze? Meet legal requirements: –OEAA and NEPA requirements are both being met, with coordinated decisions in Canada and the U.S. –OEAA and CEAA processes are being coordinated under the EA cooperation agreement’ –OEAA and CEAA decisions are being documented for the public Demonstrate to stakeholders –OEAA process involves extensive consultations –TOR explains federal-provincial coordination –Federal EA guidelines reference the provincial work plans, to demonstrate ‘one body of documentation’

IAIA 2007, Seoul, South Korea Are we successfully navigating the maze? Demonstrate to stakeholders –We only received two public comments on the draft federal EA guidelines Manage legal risk: –Process is still in progress … only time will tell

IAIA 2007, Seoul, South Korea  The maze

IAIA 2007, Seoul, South Korea Links to SEA At the federal level in Canada, a strategic environmental assessment is required for policies, plans and programs This initiative straddles the line between a project and a plan, but an SEA of some type will likely be necessary to support government decisions related to the new crossing Information generated from this coordinated federal- provincial assessment, together with the feasibility study that preceded it, will provide the details necessary to support this process