Construction of Wendelstein 7-X Max-Planck-Institut für Plasmaphysik

Slides:



Advertisements
Similar presentations
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Advertisements

Heinz Grote1 Presentation to NSCX WENDELSTEIN 7-X Assembly Max-Planck- Institut für Plasmaphysik KKS-Nr.: 1-AD Dok-Kennz.: -Txxxx.0 Heinz Grote October.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
LARP LQX and MQX Cold Mass Testing at Fermilab Overview and Required Test Stand Upgrades Cosmore D. Sylvester.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
Physics of fusion power Lecture 14: Anomalous transport / ITER.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
IPP Stellarator Reactor perspective T. Andreeva, C.D. Beidler, E. Harmeyer, F. Herrnegger, Yu. Igitkhanov J. Kisslinger, H. Wobig O U T L I N E Helias.
1 Superconducting Magnets for the MICE Channel Michael A. Green Oxford University Physics Department Oxford OX1-3RH, UK.
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Progress on the MuCool and MICE Coupling Coils * L. Wang a, X. K Liu a, F. Y. Xu a, A. B. Chen a, H. Pan a, H. Wu a, X. L. Guo a, S. X Zheng a, D. Summers.
ASIPP EAST Overview Of The EAST In Vessel Components Upgraded Presented by Damao Yao.
CD meeting R.Yamada1 Thoughts on 4CD (4 th Concept Detector) Solenoid System based on Alex Mikhailchenko’s Basic Design Ryuji Yamada October 20,
Status of CEPC Detector magnet
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
The optimized stellarator as a candidate for a fusion power plant Thomas Klinger C. Beidler, J. Boscary, H.S. Bosch, A. Dinklage, P. Helander, H. Maaßberg.
Overview of the KSTAR commissioning M. Kwon 3 June, 2008.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
February 13, 2012 Mu2e Production Solenoid Design V.V. Kashikhin Workshop on Radiation Effects in Superconducting Magnet Materials (RESMM'12)
Review-LHC Interaction Regions - Upgrade Phase I Amalia Ballarino, 31 st July 2008 Cold Powering Options Conceptual Design Review of the LHC Interaction.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Max-Planck- Institut für Plasmaphysik Karsten Liesenberg / AS-T Visit NCSX engineers 11/12 October 2007 Final assembly of Stellarator W7-X in the torus-assembly.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Max-Planck-Institut für Plasmaphysik 21 st IAEA Fusion Energy Conference, Chengdu, 16 – 21 October Experience Gained during Fabrication and Construction.
1 Association Euratom-CEA P. Libeyre Pioneering superconductivity 23rd SOFT, Venice 21 September 2004 PIONEERING SUPERCONDUCTING MAGNETS IN LARGE TOKAMAKS.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Installation of the T600 at Fermilab CSN2, September 22,
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
Stellarator Core Machine Configuration NCSX Project Meeting Dec 19-20, 2000 B. Nelson, M. Cole, P. Fogarty P. Goranson, G. Jones, D. Williamson O AK R.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Meeting 04/09/2015.
MICE Coupling Coil Update Allan DeMello Lawrence Berkeley National Laboratory Illinois Institute of Technology June 17, 2013 June 17, 2013.
Magnet R&D for Large Volume Magnetization A.V. Zlobin Fermilab Fifth IDS-NF Plenary Meeting 8-10 April 2010 at Fermilab.
Max-Planck- Institut für Plasmaphysik Wendelstein 7-X An optimized stellarator Hans-Stephan Bosch Max-Planck Institute for Plasma Physics on behalf of.
MICE Spectrometer Solenoid Recovery Review - December 3-4, Steve Virostek MICE Spectrometer Solenoid Design and Assembly.
MICE CC Magnet Cryostat Design Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE CC Cryostat Design Review LBNL, February.
GSI Helmholtzzentrum für Schwerionenforschung GmbH The Optimized Superconducting Dipole of SIS100 for Series Production ICEC26 March 9th, 2016 GSI Helmholtzzentrum.
Thermal screen of the cryostat Presented by Evgeny Koshurnikov, GSI, Darmstadt September 8, 2015 Joint Institute for Nuclear Research (Dubna)
Internal Guide : Batch No : 4 Mrs.Punyavathi Madam
MICE Coupling Coil Vacuum Vessel Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
1 Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion Research Institute Young-Ju Lee Vacuum & Cryogenic Engineering Team National Fusion.
Max-Planck-Institut für Plasmaphysik 1 ICEC 26- ICMC 2016 March 7-11, 2016, New Delhi, India Michael Nagel Cryogenic commissioning, cool down and first.
Prototyping of Superconducting Magnets for RAON ECR IS S. J. Choi Institute for Basic Science S. J. Choi Institute for Basic Science.
First Wall Panel - Overview
Cryostats for superconducting magnets
Instrumentation for status monitoring of SST-1 superconducting magnets
MANUFACTURING OF MAGNETS FOR SST-1 TOKAMAK
11 T Dipole Integration & Plans M. Karppinen
HFM Test Station Main Cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
The CMS magnet superconducting coil
Leak Detection Tutorial Work
Introduction to W7-X Coil Testing at CEA – Saclay, France
CRYOGENICS OPERATIONS 2008 Organized by CERN
Max-Planck-Institut für Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, D Greifswald, Germany Main-Components of the Wendelstein 7-X.
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
BESIII Collaboration Meeting, June 5~6, 2002, Zian Zhu
Torsten Bräuer and the Metrologyteam
Welds in the magnet system
On the accuracy of port assembly at Wendelstein 7-X
Budker Institute of Nuclear Physics,
Presentation transcript:

Construction of Wendelstein 7-X Max-Planck-Institut für Plasmaphysik Hans-Stephan Bosch Max-Planck-Institut für Plasmaphysik Greifswald Institute of Plasma Physics, CAS, Hefei, October 18, 2010

Stellarator Wendelstein 7-X Optimisation criteria small neo-classical transport good confinement of fast particles minimised bootstrap current good MHD stability good finite b-equilibria feasible modular coils Modular stellarator, Superconducting coils Fully optimized numerically

Wendelstein 7-X, basic device ports fabrication completed non-planar coils fabrication + tests completed planar coils plasma vessel fabrication completed cryostat central ring fabrication completed bus bar system cryo-piping fabrication completed thermal insulation fabrication ongoing in-vessel components fabrication ongoing

W7-X, plasma Pentagon-shaped  5 identical modules, each made of 2 flip-symmetric half-modules

W7-X, divertor 10 separate divertor units 2 in each of the 5 modules designed for a maximum heat load of 10 MW/m2

W7-X, in-vessel components Two step approach requires intermediate components: Inertial cooled divertor (TDU) for first operation phase Actively cooled high-heat-flux (HHF) divertor for steady state phase

W7-X, in-vessel components, status Target plates prototypes finished manufacturing started heat shields structure in manufacturing The graphite tiles are also in manufacture wall panels all 320 panels have been delivered by MAN DWE (Germany)

W7-X, plasma vessel volume 110 m3 surface 200 m2 mass 33 t vacuum < 10-8 mbar baking up to 150o C tolerances <  2 mm

W7-X, plasma and plasma vessel Multi-Layer Insulation 20 layers of crinkled Kapton foil glass mats in between Thermal shield glass fibre panels, Al coated Cu braids for connection to water cooling 20 welded rings per half-module

W7-X, magnet system BNN, G / Ansaldo, I / Tesla, GB magnetic field in plasma 2.5 T (< 3T) magnetic field energie 600 MJ NbTi superconductor (>3.4 K) 50 non-planar coils (5 types) 20 planar coils (2 types)

NbTi superconductor for W7-X fibre NbTi with Cu 0,58 m cabling 243 single fibres (3 x 3 x 3 x 3 x 3) Cable-in-Conduit (Coextrusion) In up to17.6 kA HSB, 22.10.09

Wendelstein 7-X, coil fabrication I Coil winding (ABB, Augsburg) Tempering of cast casing /half shell (Österby, Sweden) HSB, 22.10.09

Wendelstein 7-X, coil fabrication II Assembly of winding pack in casing Overview of production hall (BNN, Zeitz)

Wendelstein 7-X, superconducting coils

Wendelstein 7-X, Cryogenic testing of coils CEA Saclay, France: Tests at 5K Thermal properties Cold leak tightness Helium flow rates Electrical insulation Superconductivity HSB, 22.10.09

Wendelstein 7-X, Paschen testing of coils critical scenario: air influx into cryo vacuum causes pressure increase and quench of a coil  High voltage @ high pressure  Paschen discharge possible Therefore all coils are tested under Paschen conditions (between 0.001 and 100 mbar) with 6 kV This has proven to be a valuable measure to verify insulation quality. HSB, 22.10.09

W7-X, support structure Ensa, Spain welded ring in 10 half-modules mass: 71 t Support of all coils, high precision extensive inter-coil support structure to prevent movement of coils

W7-X, support structure

W7-X, outer vessel and ports DWE, Germany Romabau, Switzerland ROMABAU volume 525 m3 surface 480 m2 mass 170 t vacuum < 10-5 mbar number of ports 254

W7-X, outer vessel and ports All 5 modules delivered Installation of Thermal Insulation ongoing

W7-X, pre-assembly Coils are threaded across the plasma vessel Thermal insulation is completed The coil support structure is positioned in front of the 7-coil pack Coils are bolted to the central support ring

W7-X, pre-assembly II The flip-symmetric half-modules are aligned The step-flange is bolted and the vessel half-modules are welded Thermal insulation, Inter-coil structure are completed HSB, 22.10.09

W7-X, assembly Module 5, February 2009

W7-X, torus hall October 13, 2009

W7-X, 1. module inserted in cryostat lower shell, 29.10.09

W7-X, first upper shell of cryostat, 25.11.09

W7-X, 3. module on machine base, 18.08.10

W7-X, Assembly of ports in 1. module, 27.09.10

Assembly schedule Assembly of the five modules is running in parallel All 5 modules are in the works at present Major “new” work packages: module connection diagnostics in-vessel assembly The assembly schedule still contains half a year buffer times Assembly will be finished in summer 2014 periphery installations

Operations planning stepwise approach 1st operation phase with 10s @ 8MW, inertially cooled divertor and only partial cooling of in-vessel components shut-down (15 months) for completion and hardening 2nd operation phase to approach 30min @ 10MW