Grid Interest Group Conclusion Prof. Nataliia Kussul, Space Research Institute NASU-NSAU, Ukraine WGISS-28, September 29, 2009 Pretoria, South Africa.

Slides:



Advertisements
Similar presentations
Future Directions and Initiatives in the Use of Remote Sensing for Water Quality.
Advertisements

1 Guy Duchossois, Work Plan Manager Report on 2006 Work Plan.
DS-01 Disaster Risk Reduction and Early Warning Definition
Group on Earth bservations Discussion Paper on a Framework Dr. Ghassem Asrar August 1, 2003.
Remote Sensing at the service of Natural Disasters Warning: the Contribution of the Supersites Concept Professor Stuart Marsh Co-Chair GEO Institutions.
The GEO Work Plan * 2010 Update (GEO-VI) * New Online Management System Alexia Massacand (Work Plan Coordinator) Rik Baeyens (IT Manager)
GEO South – Eastern Europe and Eastern Mediterranean Symposium on Earth Observation Services for Monitoring the Environment and Protecting the General.
The role of Space Technologies for Sustainable Economic Growth and Development High level conference Space for the African Citizen 16 September 2010, Brussels,
EGIDA PROJECT COORDINATING EARTH AND ENVIRONMENTAL CROSS- DISCIPLINARY PROJECTS TO PROMOTE GEOSS Contact Point: Stefano Nativi
GEO SB-01 Oceans and Society: Blue Planet An Integrating Oceans Task of GEO GEO-IX Plenary November 2012 Foz do Iguaçu, Brazil on behalf of the Blue.
AGENDA ITEM 4: FOLLOW-UP ON THE DECISIONS OF THE WORLD METEOROLOGICAL CONGRESS ON THE INTERGOVERNMENTAL BOARD ON CLIMATE SERVICES AGENDA ITEM 4.1: IMPLEMENTATION.
United Nations Environment Programme. UNEP’s Work to Advance the Preparation and Implementation of National Adaptation Programmes of Action 3 September.
Multidisciplinary interoperability To build Operating Capacity Initial (IOC): extend current GEO IP3/AIP-2 interoperability systems in Forest, Biodiversity,
Makoto Kajii SIT Chair 2010 – th Annual Report on CEOS Implementation of the GEOSS Space Segment Agenda Item accomplishments and lessons.
1 EnviroGrids: Building Capacity for a Black Sea Catchment Observation and Assessment System supporting Sustainable Development Nicolas.
The Multi-disciplinary Interoperability research challenges: EuroGEOSS and EGIDA projects Stefano Nativi National Research Council of Italy (CNR ) GEPW-5.
Integrated Earth Observations - Building the Bridges - IGOL Theme Team Meeting Sept 2004 Jeff Tschirley Chief, SDRN.
Session 9. New activities André Obregón, Rapporteur GEO Work Plan Symposium Geneva, 5-7 May 2015.
Disaster Reduction & Climate Change Adaptation by Fengmin Kan, UN-ISDR Africa Nairobiwww.unisdr.org.
GEO Work Plan Symposium 2012 ID-05 Resource Mobilization for Capacity Building (individual, institutional & infrastructure)
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
Nataliia Kussul Space Research Institute NASU-NSAU
© Fraunhofer IOSB 1 Building on the results of the project EO2HEAVEN: towards a cholera early warning system Kym Watson, Fraunhofer IOSB, Germany EO2HEAVEN.
The Preparatory Phase Proposal a first draft to be discussed.
Task ID-05 IDIB report ID-05 Catalyzing Resources for GEOSS Implementation C1 - Resource Mobilization for Capacity Building C2 - Resource Mobilization.
Prepared for the 3rd SBB telecon 20 Mar 2012 Michele Walters, BI-01 task coordinator.
Space Technology for Emergency Response and Risk Reduction European Conference - GEO Welcomes FP7 Constanta, Romania 15 September 2006 United Nations platform.
Data Democracy Pakorn Apaphant May 11, 2009 WGISS 27 Toulouse, France.
EGIDA PROJECT 1stJoint Workshop of the EGIDA Stakeholder Network and Advisory Board Connecting GEOSS and its Stakeholders in Science.
The GEOSS Portfolio for Science and Technology Produced by ST Featuring: Climate: Capacity Building of Operational Oceanography and Climate Adaptation.
SAFER Services & Applications for Emergency Response Project scope and objectives David HELLO – INFOTERRA France January 2009.
Historical Disaster Data Grid for Natural Disaster Events Prof. Guoqing Li CEODE/CAS March 30, 2009, Newport Beach, USA Presented to 4th China-US Roundtable.
WGISS Disaster Management IG Lorant Czaran, UNOOSA Pakorn Apapanth, Natalia Kussul, Guoqing Li May 14, 2009 WGISS 27 Toulouse, France.
Anticipated Outcomes from CEOS WGs in 2010 Strategic Discussion on what the WGs should seek to achieve 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November.
© GEO Secretariat Global Datasets (GEOSS task DA-09-03) 3rd GEO European Project Workshop 8-9 October 2009 Istanbul Douglas Cripe, GEO Secretariat.
SUSTAINABLE DEVELOPMENT, GLOBAL CHANGE AND ECOSYSTEMS A Edwards – ADC, Seattle, 2006 Slide 1 European Community RTD Framework Programmes ADC.
ENV proposal meeting, Geneva, Sep. 24, Proposal Objectives Joost van Bemmelen, ESA
EPA’s Role in the Global Earth Observation System of Systems (GEOSS)
The Use of the Targets by the Institutions & Development Implementation Board in Monitoring the Work Plan Implementation 2nd GEOSS Science and Technology.
Synthesis of Strategic Issues (Climate, Disasters, Water) and a draft European strategic framework.
What is GEO? launched in response to calls for action by the 2002 World Summit on Sustainable Development, Earth Observation Summits, and by the G8 (Group.
2010 WGISS Expected Outcomes Matha Maiden and Pakorn Apaphant Oct 2, 2009 WGISS 28 Pretoria, South Africa.
Draft GEO Framework, Chapter 6 “Architecture” Architecture Subgroup / Group on Earth Observations Presented by Ivan DeLoatch (US) Subgroup Co-Chair Earth.
WGISS Technology Subgroup Report WGISS-29 Bonn, 2010 Nataliia Kussul WGISS.
Break-out Session: Health, Energy, Ecosystems, Biodiversity General Remarks.
CEOS WGISS Status: Report to Plenary Martha E. Maiden, Chair Pakorn Apaphant, Vice-Chair Phuket, Thailand November 3 - 4, 2009.
Task NumberHarmonise, develop & implement capacity building Performance Indicators CB-07-01c Harmonise efforts by Tasks, in particular those related with.
FP7* support to GEO activities Update for 5 th GEO ADC Meeting A Edwards Washington, D.C., U.S.A September 2007 * FP7 is the European Community’s.
GEO 2014 Work Plan Symposium Opening Remarks Barbara J. Ryan Director, GEO Secretariat Geneva, Switzerland 28 April 2014.
WGISS and GEO Activities Kathy Fontaine NASA March 13, 2007 eGY Boulder, CO.
GEOSS and CEO N. Kussul – SRI- NASU-NSAU Ukraine GEO – Group on Earth Observations –coordinates efforts to build a Global Earth Observation System of Systems,
Grid Interest Group Activities WGISS-28, September 30, 2009 Pretoria, South Africa.
Capacity Building & the European Community Research Framework Programme: (FP7) Alan Edwards European Commission.
The GEOSS Initiative Codata workshop, September 2005 Dhesigen Naidoo DST, South Africa.
Page 1 WGISS Response to GEO/CEOS-SIT WGISS-22 Updates Ken McDonald WGISS/Vice-Chair.
Anver Ghazi Adviser for Earth Observation, Research DG European Commission Brussels EC’s Contribution to the Group on Earth Observation (GEO) Process.
GEO 2016 Work Programme Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Report from GEO Post-2015 WG and GEO Ministerial WG D. Brent Smith, NOAA CEOS Representative CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Coordinating an Observation Network of Networks EnCompassing saTellite and IN-situ to fill the Gaps in European Observations Kick-Off Meeting, February.
A Presentation to the 2017 GEO Work Programme Symposium,
Creation of a System of Systems on a Global Scale: The Evolution of GEOSS Dr. Jay Pearlman The Boeing Company September
Introduction to WGISS For GEO ADC
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
EC FP7 - Cooperation Theme 6: Environment (incl. climate change)
Oceans and Society: Blue Planet
Achieving universal access to, and use of space applications for sustainable development in Asia and the Pacific Keran Wang Chief, Space Applications.
Workshop on Gap Analysis and Prioritization
Building a User Driven GEOSS Masami Onoda, GEO Secretariat Workshop at 34th ISRSE, Sydney, Australia 10 April, 2011.
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.4 Protecting citizens from environmental hazards European.
GEO - Define an Architecture Integrated Solutions
Presentation transcript:

Grid Interest Group Conclusion Prof. Nataliia Kussul, Space Research Institute NASU-NSAU, Ukraine WGISS-28, September 29, 2009 Pretoria, South Africa

WGISS- 28 Pretoria 2 Lessons Learned Positives –Grid – powerful infrastructure for data integration and complex workflow management –Satisfies GEO requirements to the service based architecture –All over the world there are Grid-infrastructures for Disaster Management &Civil Protection –They could be used for End-to-End Systems Development Challenge –Catalogs &Technologies themselves are not very useful for end users –Users require not source (row) data, but products (risk management assessment or loss assessment)

WGISS- 28 Pretoria 3 Lessons Learned: Problems –Main problem: There is a gap between data acquisition and data processing International Charter guarantees only satellite images, not products

WGISS- 28 Pretoria 4 Delays in information on flood event Delays in data delivery Flood Events Information Breakdown

WGISS- 28 Pretoria 5 Solution: –Organizational: CEOS level agreement is necessary for data availability (democracy)& disaster response: »For CEOS countries »For specific disasters (special datasets) –Technical: Data provision & processing (unlike Charter) Should be done in automated mode (workflow is necessary)

WGISS- 28 Pretoria 6 Example: workflow for Malaria project Flood warnings EO products Socio-economic inf Infrastructure Models

WGISS- 28 Pretoria 7 Data Models –GFS, hydro-predictors, … Statistical data –on infectious diseases Remote sensing –land and water related products Socio-economic information –distribution of population, administrative boundaries… Infrastructure –wells, channels, …

WGISS- 28 Pretoria 8 Actuality – contribution to Health SBA Africa –rising flood waters intensifies health risks for millions of people, and exacerbates health threats for conditions including malaria, diarrhoea and other potentially fatal communicable diseases [UN, WHO] Ukraine –major threats to health by water related diseases –contamination of drinking water in wells –leads to infectious diseases like hepatitis, leptospirosis etc with long incubation period [Ministry of Health of Ukraine]

WGISS- 28 Pretoria 9 Actuality – Health SBA (cont.) GEOSS Health SBA –“… Earth observation data can contribute to improving our understanding of how the environment affects human health and well- being ” –“… remote-sensing observations of weather, land and ocean parameters can now be used to predict outbreaks or trends in infectious diseases such as meningitis, malaria and cholera…”

WGISS- 28 Pretoria 10 European response: FP7 Calls ‘Environment’: Activity 6.4 Earth observation and assessment tools for sustainable development –Area Integration of European activities within GEO ENV Supporting the integration of European and international R&D programmes in GEO –Deadline – 05 January 2010 ‘Health’: HIV/AIDS, malaria and tuberculosis –HEALTH : Controlling malaria by hitting the vector: New or improved Vector Control Tools. –Deadline – 14 January 2010

WGISS- 28 Pretoria 11 GEO WP SCIENCE AND TECHNOLOGY –ST-09-01: Catalyzing Research and Development (R&D) Funding for GEOSS Led by EC (DG-RTD, and IIASA –ST-09-02: Promoting Awareness and Benefits of GEO in the Science and Technology Community This Task is led by EC (DG-RTD, COSPAR and IIASA HEALTH –HE-09-03: End to End Projects for Health – b) Towards a Globally Coordinated Malaria Warning System –Led by France (CNES), USA (NOAA) and CEOS

WGISS- 28 Pretoria 12 GIG Proposal WGISS should participate at the consortiums. WGISS possible contribution to the projects: –“Satellite arm” at applied projects; –Networking (we have real working group); –Satellite data availability; –Distribution of GEO principles to disaster warning & response systems & communities (liaison). WGISS benefits: –Framework for WGISS technologies integration & implementation; –Framework for Application Subgroup IG collaboration; –Framework for WGISS deliverables development; –Sustainable services (not prototypes) creation; –Common funding source.

WGISS- 28 Pretoria 13 Thank You!