Lecture Network Analysis
Advertisements

WBS: Lowest level OBS: Lowest level
Project Management CHAPTER SIXTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
TK3333 Software Management Topic 7: Schedule Control.
ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 LF=16 ES=4+6=10 EF=10 LS=4
Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 1 LECTURE.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Network Diagramming Network Analysis  The common term for network analysis is PERT  PERT stands for Program Evaluation and Review Technique  The word.
Developing a Project Plan
1 Project Planning BA Project Planning and Control Definition of Project Management Work Breakdown Structure Critical Path Scheduling Ideal Completion.
Advanced Project Management - CPH
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Chapter 4: Schedule, cost, and situation analysis (pt. 1) ISE 443 / ETM 543 Fall 2013.
Creating the Project Plan
Stochastic Modeling & Simulation Lecture 6: Intro to Project Management – CPM.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM.
5/4/20151 NETWORK SCHEDULING TECHNIQUES. 5/4/20152 Network Diagrams  PMI defines the scheduling process as: “the identification of the project objectives.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
1 Operations Management Lesson 5 Project Management.
Precedence Network Calculations the basic information that should be calculated in the precedence network are: 1) Early activity start (ES) 2) Early activity.
Importance of Project Schedules
Class 28: Chapter 16: Project Management Class 28 Agenda –Collect Player Diary 2 and Conduct Player Audit No ed diaries – 5 PM Deadline –Discuss Grade.
Roberta Russell & Bernard W. Taylor, III
Project Time Management
Project Management Session 7
Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 1 Engaging.
Part II Project Planning © 2012 John Wiley & Sons Inc.
Project Management Chapter 3 BUSI 2106 – Operations Management.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
Advanced Project Management PM Processes and Framework
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Software Project Management Task Estimating and Scheduling
The World of Project Management. WHAT IS A PROJECT?
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
ENGM91 ACTIVITY PLANNING Unit 2
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
Geog 469 GIS Workshop Project Management.
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Applied Software Project Management PROJECT SCHEDULES Applied Software Project Management 2:16:07 AM 1.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Project Management Project Planning. PLANNING IN PROJECT ENVIRONMENT Establishing a predetermined course of action within a forecasted environment WHY.
Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 1 Communication.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects…
Advanced Project Management Tools and Techniques of Project Planning Ms. Ghazala Amin Slides Courtesy: Dr. A Z. Khan.
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
Project Management Fundamentals - Planning Tools 1.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Creating a Work Breakdown Structure with Microsoft Project.
Project Management and Information Security
Chapter 6: Project Time Management
IS Project Management Mini review
Project Time Management
Project Time Management
Project Time Management
Project Time Management
Exercise – A small building.
Project Time Management
Presentation transcript:

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 1 PART III: THE PROJECT LIFE-CYCLE

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 2 Project Planning Project Planning lays the foun- dation for organizing, implemen- ting, closing as well as monitoring, evaluating and controlling a project with a view to realizing the project goal and objectives within the constraints of time, budget, given require- ments and stakeholder expectations.

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 3 Project Planning Project Planning reduces uncertainty and increases understanding of the project as well as boosting efficiency in the way it is being carried out. Many project failures are attributed to mistakes and shortcomings wich occurred in the project’s planning phase.

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 4 Project Planning: A Sentence to Remember

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 5 Project Planning On simple projects, planning may be undertaken by a few individuals within a short period of time at little cost. On complex projects, project planning may require weeks and months of costly work input by the project team and involved stakeholders.

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 6 Project Planning The quality of the project plan is determined primarily by the quality of the information used, the knowledge and experience of the stakeholders who are assigned the responsibility of developing the plan and the resources and time frame made available for it.

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 7 Project Planning Project plans are not static en- tities. They must be periodically updated as and when new infor- mation which warrants a modifi- cation or revision of the project scope, requirements and speci- fications, cost, schedule, risks, stakeholder informational needs and so forth comes to light. Ideally, anything that may have an impact on the project should be considered in developing the project plan.

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 8 Project Planning The Project Management Plan is the key deliverable output of the project planning phase. The Plan will include, inter alia, specific information on the individual project activities and tasks that need to be performed, why they need to be done, when they will be done and who will do them, what resources are needed and what criteria must be met in order for the project to be considered successful.

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 9 Project Planning Project Scope Plan Project Communication Plan Project Cost Plan Project Time Plan Project Quality Plan Project Risk Plan Project Human Resource Plan Project ProcurementPlan Project Integration Plan PMI Standard

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 10 Selected Tools in Project Planning

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 11 Assistant Professor Dr. Aurangzeb Z. Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 11 Project Goal Work Element Level 1 Work Element Work Packages Level 2 Level N The WBS divides the whole project into work elements that represent singular work units, assigned either to the organization or to an out- side agency, such as, a contractor or project partner The underlying philosophy of the WBS is to divide the project into assignable “work packages” for which accountability can be expected Projects are planned, organized and controlled around the lowest level of the WBS, i.e., the work packages Work Breakdown Structure Visualization

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 12 Assistant Professor Dr. Aurangzeb Z. Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 12 Work Breakdown Structure: Example 1

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 13 Assistant Professor Dr. Aurangzeb Z. Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 13 Work Breakdown Structure: Example 2

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 14 Assistant Professor Dr. Aurangzeb Z. Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 14 Work Breakdown Structure: Example 3

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 15 Assistant Professor Dr. Aurangzeb Z. Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 15 Work Breakdown Structure: Example 4

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 16 Assistant Professor Dr. Aurangzeb Z. Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 16 Work Breakdown Structure: Example 5

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 17 Assistant Professor Dr. Aurangzeb Z. Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 17 Work Breakdown Structure: Example 6

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 18 Assistant Professor Dr. Aurangzeb Z. Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 18 Project Manager Project Team Member Deliverable 1 WPM 1WPM 2 Project Team Member Deliverable 2 Project Team Member Subdeliverable 2A WPM 2AA WPM 2AB Project Team Member Subdeliverable 2B WPM 2BA WPM 2BB WPM 2BC Project Team Member Deliverable 3 Example of a Project Organization Chart

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 19 RACI Chart Project Team Members ActivityAliyahSarfrazQaisarFarhanAmjad DefineARIII DesignIARCC DevelopIARCC TestAIIRI RACI (R = Responsible; A = Accountable; C = Consult; I = Inform) Responsibility Assignment Matrix (RACI)

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 20 1=Actual Responsibility; 2=General Supervision; 3=Must be Consulted; 4=May be Consulted; 5=Must be Notified; 6=Approval Authority Project Linear Responsibility Chart

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 21 Gantt Charts: Example 1

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 22 Gantt Charts: Example 2

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 23 Gantt Charts: Example 3

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 24 ACTIVITY DESCRIPTION ACTIVITY IDENTIFIER ACTIVITY DURATION ES EF LS LF SLACKSLACK The CRITICAL PATH of a project is the sequence of activities that determine the project completion date – any delay in an activity or activities comprising the critical path will delay the project by a corresponding amount of time EARLY START: When can the activity start at the earliest? EARLY FINISH: When can the activity finish at the earliest? LATE FINISH: When can the activity finish at the latest? LATE START: When can the activity start at the latest? SLACK: The time for which the project activity can be delayed (also called float) SLACK: The time for which the project activity can be delayed (also called float) Project Network Diagrams: The Node

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 25 Koll Business Information Center Activity DescriptionPreceding Activity ActivityDuration AApproval of Application None 5 BConstruction Plans A 15 CTraffic Study A 10 DService Availability Check A 5 EStaff Report B, C 15 FCommission Approval B, C, D 10 GWait for Construction F 170 HOccupancy E, G 35 Activity DescriptionPreceding Activity ActivityDuration AApproval of Application None 5 BConstruction Plans A 15 CTraffic Study A 10 DService Availability Check A 5 EStaff Report B, C 15 FCommission Approval B, C, D 10 GWait for Construction F 170 HOccupancy E, G 35 Project Network Diagram Example (Network Components and Details)

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 26 The Basic Network Structure The Basic Network Structure Merge Activities Merge Activities Burst Activities Burst Activities A Approval of Application A Approval of Application C Traffic Study C Traffic Study D Service Avail- ability Check D Service Avail- ability Check E Staff Report E Staff Report F Commission Approval F Commission Approval B Construction Plans B Construction Plans H Occupancy H Occupancy G Wait for Construction G Wait for Construction Project Network Diagram Example (Graphical Depiction of the Network Components)

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 27 Application Approval Construction Plans Traffic Study Service Check Commission Approval Staff Report Wait for Construction Occupancy A B C D F E G H Forward Pass ES + Duration = EF Forward Pass ES + Duration = EF Project Network Diagram Example (Determining the Forward Pass)

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 28 Application Approval A 5 Construction Plans B 15 Traffic Study C 10 Service Check D 5 Commission Approval F 10 Staff Report E 15 Wait for Construction G 170 Occupancy H Backward Pass LS + Duration = LF Backward Pass LS + Duration = LF Project Network Diagram Example (Determining the Bckward Pass)

Assistant Professor Dr. Aurangzeb Zulfiqar Khan Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 29 Application Approval A 5 Construction Plans B 15 Traffic Study C 10 Service Check D 5 Commission Approval F 10 Staff Report E 15 Wait for Construction G 170 Occupancy H Slack = LS – ES Slack = LF - EF Slack = LS – ES Slack = LF - EF Project Network Diagram Example (Determining Slack and the Critical Path)