27 Feb 2012 Erwin Siesling 1 TSR Max Planck Institute Heidelberg Hie-Isolde LOI endored Jan 2011 TDR submitted Jan.

Slides:



Advertisements
Similar presentations
Overview of the GlueX Tagger and Photon Beamline..
Advertisements

Status Report on the TSR building (and Infrastructure) Isolde workshop CERN, 27/28 April 2015 Isolde Erwin Siesling.
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
DESIR Progress Report DESIR hall details defined for civil construction: - compressed air, liquid nitrogen, cooling water, etc detailed layout of RFQ-HRS.
The Experimental Hall Layout 2nd HIE-ISOLDE Physics Coordination Group Meeting 6 May, 2011 Hie-Isolde Erwin Siesling.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
ISOL-SRS project.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
BINP for FAIR Yu.Shatunov Moscow May Research and Development Contract between GSI and BINP 1. Kickers for synchrotrons and storage rings.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
EHN1 Extension overhead crane coverage Keith Kershaw CERN EN-HE.
ISOLDE: Status report building th ISCC meeting CERN, 31 March 2014 Erwin Siesling, Magda Kowalska.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Status of renewal of Buildings 115 & 507 Borge & Erwin Siesling.
The status and future prospects Fredrik Wenander, ISOLDE workshop 26/ Outline 1.Motivation and physics reach 2.Machine performance 3.Beam-line layout.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
Report on technical study of Fredrik Wenander, TSR workshop 14/ Outline 1.Beam-line layout 2.Storage time REXTRAP 3.Upgrade of charge.
High Resolution Separator
XFEL X-Ray Free-Electron Laser Bernward Krause MEA WP-12: Warm Magnets WPL: B. Krause.
Hall D Civil and Cryogenic Issues Ravi Anumagalla.
Report from HIE-ISOLDE HEBT WG J.Bauche‎, P.Farantatos‎, M.Fraser‎, B.Goddard, Y.Kadi‎, D.Lanaia‎, D.Nisbet‎, E.Siesling‎, G.Vandoni‎, D.Voulot‎, E.Zografos.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
2 Workshop 2014 Status of the Project Klaus Blaum, MPI for Nuclear Physics, Heidelberg for the Collaboration CERN, Geneva,
Maria J. G. Borge Beam Lines for HIE-ISOLDE. Status of HIE-ISOLDE 2 May 2010: 34 LoI submitted 1 Nov 2012: INTC endorsed the increase of 2 GeV-proton.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
SBS Magnet and Support Status Robin Wines June 2013.
ISOLDE: Status report building th ISCC meeting CERN, 24 June 2014 Erwin Siesling, Magda Kowalska.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
Layout Experimental hall Final status (?) 3rd HIE ISOLDE Physics Coordination Group meeting CERN, 3 September 2012 HIE-ISOLDE Erwin Siesling.
Riccardo Raabe (IKS, KU Leuven) for the Collaboration INTC 01/02/2012 INTC-O-014 Storage ring facility at HIE-ISOLDE: Technical Design Report.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
Villars, 26 September Extra Low Energy Antiproton Ring (ELENA) for antiproton deceleration after the AD Pavel Belochitskii for the AD team On behalf.
Linking TSR to ISOLDE Fredrik Wenander, TSR workshop, CERN, Outline 1. Machine parameters 2. Operational experience 3. Beam-line layout 4.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor.
Plans and schedule for the Long Shutdown LS1 Hie Isolde Physics Coordination Group CERN, 1 March 2012 Hie-Isolde Erwin Siesling.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
ELENA installation progress F. Butin / ELENA collaboration.
Installation at Isolde (and costs) TSR at Isolde workshop CERN, 29/30 October 2012 Isolde Erwin Siesling.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
HIE ISOLDE Linac Short Technical Description W. Venturini Delsolaro Material from: L. Alberty, J. Bauche, Y. Leclerq, R. Mompo, D. Valuch, D. Voulot, P.
The Super-FRS Multiplet, Magnetic and Cryogenic requirements
CBM magnet overview of the BINP work
Oleksiy Dolinskyy December 1st, 2014
CLIC Handling Engineering Update
Schedule CM SPS G.Vandoni.
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
Workshop, 10/2012 “The Project”
ELENA installation and commissioning status
VELO-installation meeting CERN, January 17, 2006
EPFL-SPC, 5232 Villigen PSI, Switzerland
CLEX* Status and Plans CTF3 complex CLEX
Status of Cryogenics Facilities Design
Status of Solenoidal Spectrometer
Main magnets for PERLE Test Facility
Compact and Low Consumption Magnet Design The DESY Experience
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
HIE-LINAC status report
RDR Baseline Layouts for Interaction Region
CERN-ISCC Meeting “Storage Ring Facility at HIE-ISOLDE”
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
Present and Future test facilities for High-intensity Targetry CERN
66th ISOLDE Collaboration Committee meeting
Overview of Day One – 29 Feb 2016
MERIT Beam Collimator Design
CEPC Collider Magnets CHEN, Fusan November 13, 2018.
Presentation transcript:

27 Feb 2012 Erwin Siesling 1 TSR Max Planck Institute Heidelberg Hie-Isolde LOI endored Jan 2011 TDR submitted Jan 2012 (K. Blaum, Y. Litvinov) Hie-Isolde

27 Feb 2012 Erwin Siesling 2 Proposed layout to fit the TSR: Installation above the CERN service-tunnel Tilted beamline coming up from the machine. Cost study: Eliseo Perez-Duenas GS/SE 30m25m Approx 3m higher than Isolde hall floor Hie-Isolde Jura (west) side 10m (7m between floor and crane hook)

27 Feb 2012 Erwin Siesling 3 Hie-Isolde Building cost study: Eliseo Perez-Duenas GS/SE Drawing: courtesy Didier Voulot 30m 25m 12.4m

27 Feb 2012 Erwin Siesling 4 Hie-Isolde 30m 25m 12.4m 2m2m 4.5m 5m5m

27 Feb 2012 Erwin Siesling 5 Possible TSR integration : - TSR building & TSR cooling station Control room TSR Integration TSR building TSR cooling station pit

27 Feb 2012 Erwin Siesling 6 Surface & Weight Total surface TSR floor: 25x30m= 750m2 of which 20x20m (400m2) reserved for the ring (final position of the ring within the building to be defined) 10.4x25m = 260m2 experimental area TSR floor approx. 3m above Hie Linac floor Level of the center of beam at 1.77m above TSR floor Total surface available basement: 12mx30m= 360m2 to house power- supplies and additional racks (total 29m length floor space for the TSR equipment and 7m for the e-target equipment + 10 standard 19’’ racks and ECOOL HV cage 4x4m2) TSR Building surface

27 Feb 2012 Erwin Siesling 7 Surface & Weight Weight in each corner: Dipole: iron 12t + coil 0.8t Quadrupole: iron 1.9t + coil 0.36t Sextupole: 0.65t Concrete bases 3.2t (to be verified, unknown) Each corner: 2x12.8t + 5x2.26t + 3x0.65t + 2x3.2t= ton Electron cooler: ECOOL magnet 6t ECOOL supporting structure 4t (to be verified, unknown), total 10ton Total TSR floor weight: 4x45.25ton=181ton 1 Electron cooler Total: 191 ton (Exclusive experiments, RF resonator and 19 standard 19’’ racks. Example: HELIOS magnet 12ton) TSR floor weight