Houston Transtar Center Renovation / Expansion Presentation of Qualifications Interview of February 3, 2009.

Slides:



Advertisements
Similar presentations
SCOTT ELEVATOR CONSULTANTS
Advertisements

1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Bond Program Planning Imperatives Study Session October 12, 2004.
Measure C Board of Trustees Update January 18, 2005.
1 NYP BEST PRACTICES EXISTING CONDITIONS SURVEYS Presentation to Approved A/E Vendors to NYP June 17, 2013.
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR April 25, 2014.
Measure G Overview March 9, Measure G School Facility Improvement East Side Union High School District To provide greater security and safety, relieve.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
TULLIO ARENA EXPANSION & RENOVATION Project Information Meeting Thursday, August 26, :00 – 3:30 pm Please sign in on the attendance sheet.
Ector County Courthouse Needs Assessment Study Status Report Brinkley Sargent Architects Greg Read Gina Irwin January 12, 2015.
SCHEMATIC DESIGN PRESENTATION
Kenmore -Town of Tonawanda Union Free School District PHASE 2 CAPITAL PROJECT DEVELOPMENT PRESENTATION We educate, prepare, and inspire all students to.
FBCLS Facilities Master Plan September 14, Future Planning Team Dave Esely Sheryl Franke Bud Hertzog Blake McKinney Wendell Shaffer Sara Taylor.
© Baltimore County Public Schools Schematic Design Presentation Catonsville Elementary School at Bloomsbury 1104 Kenilworth Dr. Suite 500 Towson,
Houston Independent School District John F. Kennedy Elementary School PROJECT PROFILE PROJECT HIGHLIGHTS The John F. Kennedy Elementary School is a replacement.
Architectural & Engineering Designer Symposium Tuesday, February 14, 2012 Student Activity Center, Salons C - E.
NORTH HARRIS MONTGOMERY COMMUNITY COLLEGE DISTRICT.
Brazosport College Architectural and Engineering Services Renovation and Expansion of the Main Campus Building March 1, 2010.
PBSD - Transportation and Maintenance Facility Project Status Report – 1460 Greensburg Road Plum Borough School District Richard Zucco & Michael Brewer.
ARCH – 4601 Architecture Firm Presentation Popham Walter Architects Jason B. Ashe.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e U.S. Air Force Civil Engineer Center Society of American Military Engineers San Antonio Post SMALL.
Howard County Consultant Services for Interior Space Evaluation, Planning, and Design Services Expression of Interest # September 9, 2008.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. April 28, 2008 Prepared by:
Best Practices in Overall Sustainable Design Cal State University, Long Beach - Liberal Arts 2, 3 and 4 Renovation Presented By:Mark Zakhour,, CASp, LEED.
$18 million bond Construction of new Junior High campus Construction of safety improvements at Elementary School campus  Storm Shelter  Fire Safety.
FACILITIES ADVISORY COMMITTEE Facilities Advisory Committee Annual Report.
Architectural, Engineering, and Professional Construction Services Consultants Request for Qualifications February 11, 2005.
Silverleaf Resorts, Inc. Ocean Club - Galveston October 29, 2012.
Schematic design presentation School of Business South Hall Renovation.
Site Plan Review 8 May 2013 Jeff Shaw, AIA Principal-in-charge Newton Fire Station #10.
INFORMATION TECHNOLOGY SERVICES University Data Center Project Overview January 11, 2010.
Comprehensive Work Solutions and Services Project Teams Team 1 Interior Designer Samantha Evans Skrab Matrix Settles, PC Staff Designer/Technician Analyst/Programmer.
Community Meeting September 9, 2015 COMMUNITY CENTER IMPROVEMENT PROJECT BENNING PARK COMMUNITY CENTER.
Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.
1 FY2009 Recommended Capital Budget & FY Capital Improvement Plan May 20, 2008 Board of County Commissioners.
2014 construction bond planning Needs assessment- what are we missing Site visits- in and out of district Safety concerns Life cycle evaluations- where.
Houston TranStar Building Expansion 2009 Status. Aerial of Existing Building.
Disaster Planning Workshop Hosted By: Pleasantview Fire Protection District.
Missoula County Space Needs Plan Planning Logistics Phasing Plan Schematic Designs Questions.
Interview For Professional Architectural Services Florida Department of Health Office of Design and Construction 4052 Bald Cypress Way Tallahassee, Florida.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
South Greenville Recreation Center and Park Master Plan.
May 18, 2004 City Bond Election. MAY 2004 BOND ELECTION General Election May 18, 2004 Elections City Mayoral Election City Council Election City Bond.
The importance of process in high performance building design.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design II.
GEOTHERMAL ALTERNATIVES, OPTIONS & SOLUTIONS Engineers. Consultants. Commissioning. MEP ASSOCIATES, LLC Presenter: Jeff Urlaub, PE.
White Pigeon Community Schools
Parks & Recreation 2016 Bond Referendum Project Information.
BLAKELY  Welcome.
Overview of MSBA Building Process and Project Timeline
Overview of MSBA Building Process and Project Timeline
2011 Annual Report.
Addition of Fire Alarm system. None existing.
Proximity to Opportunity IAH New Terminal C North
Redevelopment Projects & Contracting Opportunities
PROFESSIONAL GENERAL ENGINEERING SERVICES FOR TOWN OF SURFSIDE
Johnson & Pace Incorporated TAMU Facility Management Working Group
4 November 2013 LEHIGHTON AREA SCHOOL DISTRICT.
21st Century School Buildings Plan
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
CAPITAL PROGRAM OVERVIEW
The Bond Street Wharf Baltimore, Maryland
Capital Outlay Workshop
City of West Palm Beach Quarterly Procurement Event Engineering Services Department February 15th 2019.
Presentation transcript:

Houston Transtar Center Renovation / Expansion Presentation of Qualifications Interview of February 3, 2009

ORGANIZATIONAL CHART Harris County Houston Transtar Center Harris County Houston Transtar Center LEAD FIRM MATRIX SPENCER ARCHITECTS J. Gordon Spencer, AIA, RIBA Steven L. Biegel, AIA, LEED AP LEAD FIRM MATRIX SPENCER ARCHITECTS J. Gordon Spencer, AIA, RIBA Steven L. Biegel, AIA, LEED AP MEP Engineer Holste & Associates, Inc. Project Manager Ken Cvejanovich, LEED AP Matrix Spencer Civil Engineer Brooks & Sparks, Inc. IT/AV/Security 4b Technology Group Food Service Millunzi & Associates Landscape Architects Clark Condon Associates Acoustical WJHW Geotechnical/Testing HVJ Associates Land Surveying American-Lupher Environmental/Survey PSI Cost Estimating MLB & Associates Elevator Consultant Persohn / Hahn Assoc. Structural Engineer Haynes Whaley Associates

Key Professional Staff Key ProfessionalFirmRoleYears of Experience J. Gordon Spencer, AIA, RIBAMatrix Spencer ArchitectsArchitectural44 years Steven L. Biegel, AIA, LEED APMatrix Spencer ArchitectsArchitectural32 years Kenneth L. Cvejanovich, LEED APMatrix Spencer ArchitectsArchitectural30 years Raymond Ferrari, AIA, LEED APMatrix Spencer ArchitectsArchitectural30 years Randall Holste, PEHolste & Associates, Inc.MEP28 years Mark Thompson, PE, LEED APHaynes Whaley AssociatesStructural29 years Frank Brooks, PEBrooks & Sparks, Inc.Civil32 years Terryann Basford, RCDD4b Technology GroupIT / AV / Security16 years Robert MillunziMillunzi & AssociatesFood Service18 years Scott SlagleClark Condon AssociatesLandscape Architects23 years Mike Buster, AIAMLB & AssociatesCost Estimating30 years John GilbertPersohn/Hahn AssociatesElevator Consultant36 years

J. Gordon Spencer, AIA, RIBA  Terminal E – ISEP South Concourse  Emerald Condominiums  The Renoir  Harris County Juvenile Justice Center  City of Conroe Service Center for Public Works and Parks & Recreation  Stephen F. Austin High School  Dulles Campus Additions / Renovations  Compaq Computer Corporation  Alcon Laboratories Expansion

Steven L. Biegel, AIA, LEED AP  Pentagon Basement & Mezzanine Renovation  Air Force Command Center  IRS Regional Help Center  5 th District Police Station  Human Services Office Building  Apple Hill Medical Center  Federal Reserve H.Q. Renovation  IDIQ Renovation Tasks  Rappahannock County Jail  Cedar Run Rescue Squad

Ken Cvejanovich, LEED AP  Emerald Condominiums  Diamond Beach Resort  Oak Forest Elem. School  J.R. Reynolds Elem. School  Judson Robinson Elem. School  The Renoir  Harris County Juvenile Justice Center  Continental Airlines (IAH)  LDS Temple

Raymond Ferrari, AIA, LEED AP  U.S. Securities & Exchange Commission Washington, D.C / New York City  Arlington County Police Station  Washington Board of Trade  IRS New Carrollton H.Q.  Kensington Fire Department  Montgomery County Master Plan  Nebel Street Detention Center  Construction Administration  Project Budget  Master Project Schedule

Randall J. Holste, P.E.  AT&T Mission Critical Call Centers  Harris County Juvenile Det. Remodel  BCH Insurance Mission Critical Data Ctr.  Houston Police Department  Tomball Police Department  City of Conroe Service Center  Conroe Fire Station #5

PROJECT APPROACH TO STAFFING Schematic Design Design Development Construction Documents Bidding & Negotiating Construction Services Schematic Design Design Development Construction Documents Bidding & Negotiating Construction Services

 Confirm Program of Requirements  Existing Conditions Assessment  Life Safety & Code Analysis  Establish Phasing Plan  Temporary MEP Plan  Swing Space Needs  Schedule (Establish milestones)  Budget (Reality check) Program Approach

 Interview Staff Directors  Space Allocations  Adjacency needs  Shared space needs  Assure 24/7 operations for critical areas  Review phasing and temporary egress issues Confirm Program of Requirements

The Pentagon Washington, DC

U.S. Securities and Exchange Commission New York Regional Office

U.S. Customs and Border Protection Washington, DC

 Structural Evaluation  MEP Systems (Longevity)  Load Analysis (Heat / Cool)  Envelop Systems (Roof / Windows / Walls)  Code Issues (ADA, Life Safety)  Generators / Fuel Capacity  Security of Operations and Staff  Hazardous Materials Existing Conditions Assessment

 ADA Compliance (Upgrades)  Life Safety (Fire & Egress) Life Safety and Code Issues

Phasing Phase 1 Phase 3 Phase 2 Phase

Aerial of Montgomery County, Maryland Master Plan Phasing

Temporary MEP Pentagon Basement

 Long Lead Items (Equip.)  Outside Air Quality  Safe Harbor Controls  100% Redundancy on Data Center cooling  FM 200 Fire Suppression  Lighting and Controls  Cameras and Security MEP Considerations / Issues

 On site space?  Off site space?  Temporary trailers?  Floor by floor Phasing?  IT and Operational Security during swings? Swing Space Needs

Schedule / Critical Equipment  New Emergency Generator (750 kw)  Switchgear  Specialty A/C  Elevator Cab and Equipment  Chillers

Budget PRIORITY RANKING PROJECT DESCRIPTION COST ESTIMATE 1 Computer Room Expansion$65 - $150 / s.f. 2 Disaster Support Center$80 - $100 / s.f. 3 Second Floor Traffic Office Expansion$55 - $80 / s.f. 4 Second Floor Conference Suite$55 - $80 / s.f. 5 Emergency Coordination Center$80 - $100 / s.f. 6 Generator Access RoomTBD 7 Elevator InstallationTBD 8 Front Entrance Security Project$200 - $300 / s.f. 9 Emergency KitchenTBD 10 Transportation Control Room Support SuiteTBD 11 Public Parking Expansion$4,000 / space

Thank You!