Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.

Slides:



Advertisements
Similar presentations
Energy Efficiency Assumptions in the WIRAB Low Carbon Case Thomas Carr Western Interstate Energy Board July 30, 2008 Studies Work Group Meeting Portland,
Advertisements

Study Results PC8-PC16 System Stress Tests This slide deck contains results from the 2012 TEPPC Study Program related to the various stress tests performed.
Study Results High Hydro Study Low Hydro Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impacts of low.
Study Results Common Case Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of the 2022 Common Case.
Study Results Southwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Southwest Firmed Resource.
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource.
Preliminary Review of July 24 th Extreme Temperature Event & Implications for Pilot Capacity Standard Mary Johannis & Wally Gibson PNW Resource Adequacy.
Ad Hoc West-wide Resource Assessment Team (WRAT) : Assessment of Western System Adequacy in the Short-term Jeff King Northwest Power Planning Council Presentation.
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
WGG Coal Retirement Case Transmission Repurposed for Renewables.
Keegan Moyer Manager, Transmission Expansion Planning WECC Response to DOE Quadrennial Energy Review June 19, 2014 San Francisco, CA.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
Climate Change and The NW Power Supply Climate Impacts on the Pacific Northwest University of Washington April 21, 2009.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
ELECTRICITY SOURCES Twenty five percent of the state’s electricity comes from out-of-state generation.
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Balancing Drought and Flood in the Pacific Northwest: Doug McChesney Water Resources Program Washington Department of Ecology June 12, 2003 The Challenge.
Sixth Northwest Conservation & Electric Power Plan Proposed Wind Plant Capital Cost Assumption Jeff King Northwest Power and Conservation Council Portland,
Study Results High EE/DG/DR Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of an increase of EE/DG/DR.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
“DRAFT” RMATS 2008 Base Case (To be presented at the RMATS Stakeholders Meeting) March 17, 2004.
Historical Year for 2026 Common Case Load/Hydro/Wind/Solar Shapes TAS November 2015 Meeting Tom Miller- TAS Vice Chair W ESTERN E LECTRICITY C OORDINATING.
TAS – Review Load and Hydro Shapes for use in TEPPC 2026 Common Case Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair.
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
Temperature Assumptions for Dynamic Ratings in ERCOT CRR Auctions Proposal to differentiate between Day (PeakWD & PeakWE) and Night (Off-peak) October.
DWG – Dependable Capacity Kevin Harris, ColumbiaGrid TEPPC\Hydro Modeling Task Force - Chair.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
NW Loss of Load Probability James Gall Power Supply Analyst
WECC Reliability Study Requests Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
1 Upper Basin Snowpack as of 3/26/2014
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Using the Trapezoidal Model to Derate NW Hydro Capacity Resource Adequacy Technical Committee July 25, 2007 Portland, Oregon.
1 R Workshop on 2016 RA proposals Energy Division Staff Procurement Oversight and Resource Adequacy California Public Utilities Commission Thursday,
Thomas Carr Western Interstate Energy Board ColumbiaGrid Planning Meeting August 1, 2013 Grid Tracker: A web-based tool to analyze historic transmission.
Defining LOLP Resource Adequacy Forum Technical Subcommittee Meeting November 14, 2008.
Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting April 18, 2016 Sacramento, CA Thomas Carr Western Interstate Energy Board TEPPC’s Resource.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
PC05 Low Hydro Study Results
PC04 High Hydro Study Results
Jan 2016 Solar Lunar Data.
Fundamental Supply Factors Driving Current Market Prices
Outline Background Study Assumptions Study Results To Do
Recommended Hydro Improvement April 11, 2017
Background on the 2016 Study Program Process
Study Results Common Case Study
Keegan Moyer Interim Manager, Transmission Expansion Planning
Average Monthly Temperature and Rainfall
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Western Electricity Coordinating Council
Calendar Year 2009 Insure Oklahoma Total & Projected Enrollment
Study Results Common Case Study
Study Results PC8-PC16 System Stress Tests
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
Recommended Hydro Improvement April 11, 2017
Technical Committee Meeting January 27, 2012
WECC 2019 Scenarios – Scoping
Study Results Drought Scenario Study
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
MEDITERRANEAN CLIMATE
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Planning Reserve Margin
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Presentation transcript:

Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection of increased thermal plant forced outages and decreased hydro caused by drought conditions.

2 Central Question: What impact do changes in thermal plant operation and hydro generation availability have on transmission utilization, production cost, and the ability of the Western Interconnection to continue serving its load obligation? Change to starting input assumptions: o Loads – Peak demand increased to reflect higher temperatures in drought year (inputs provided by NREL) o Transmission System – None o Generation – Low hydro (2001) data used; increased thermal plant forced outages modeled (inputs provided by Argonne National Laboratory) Results follow… 2022 PC7 WGA Drought Study

western drought Selected due to severity and coincidence within multiple basins Defined by USGS HUC-2 Basin flows Drought Condition Selected for Study Presented by Chris Harto (ANL) on Nov 15 DWG callNov 15

4 Modeling of Hydro Generation Presented by Chris Harto on Nov 15 DWG callNov 15 Hydroelectric Generation : Same as TEPPC low flow hydro case (2001) Differences: Slight overestimation of impact to Pacific NW and CA Slight underestimation for Great Basin and Lower CO

5 “At-risk” thermal plants identified based on their dependence upon surface water for cooling Impacted plants identified in sub-basins where flow under drought was less than 50% of normal flow o List of impacted plants in WECC will not be reported since no plant-specific analysis of drought mitigation plans was conducted Impact to “at-risk” plants modeled as increased forced outage rates Impact of Drought on Thermal Plants

6 Based on estimate of lost generation Calculated using EIA data for impacted plants Lost generation proportional to the loss of flow relative to the minimum of the average basin flow or 2010 water demand Lost generation was allocated monthly based on deviation from normal flow in that month relative to other months Determining Increased Forced Outage Rates (Down Days)

7 Overview of Lost Thermoelectric Generation BasinLower ColoradoCalifornia Lost Generation (MWh)6,470,0004,670,000 at risk capacity under 50% historical flow (MW)1,9081,791 at risk with WECC equivalent found (MW)1, * Fraction of at risk capacity found in WECC database average down days day/month *Includes 407 MW of CA geothermal at risk

8 Monthly Variability in Lost Generation Lower ColoradoCalifornia Flow Ratio Lost Generation MWhDown DaysFlow Ratio Lost Generation MWhDown Days JAN ,097, , FEB ,220, , MAR , , APR , , MAY , , JUN , , JUL , AUG , , SEP , , OCT , , NOV , DEC0.6691,

9 Forced outage rates modified to reflect increased “down days” for all impacted plants within a basin  All impacted plants assumed to be down the same number of days in a given month Overlap allowed with scheduled maintenance Modifying Forced Outage Rates

10 Developed by NREL Basis for demand changes: ‘99 California Energy Commission Study titled High Temperatures & Electricity Demand: An Assessment of Supply Adequacy in California, Trends & OutlookHigh Temperatures & Electricity Demand: An Assessment of Supply Adequacy in California, Trends & Outlook o Study provided an estimate for the change in peak demand for 17 areas in the WSCC for two high temperature scenarios (1-in-5 and 1-in-40 probability) Impact of Drought on Demand

11 1.Match 17 WSCC areas to 2022 TEPPC load bubbles 2.Identify hottest month for each load area in 1977 (Drought year) 3.Increase peak demand for this month only by the 1-in-40 % change value reported for the WSCC area in the CEC study o Monthly energy was increased by ½ of the peak demand change to preserve the demand shape Peak Load Adjustment Method

12 Peak Load Adjustments Summary 2022 PC1 WECC-Wide Coincident Peak Demand: 172,082 MW 2022 PC7 Adjusted Coincident Peak Demand: 176,080 MW (2.3% inc.)

WGA Drought – Changes in Total Annual Generation vs. Common Case GWh Low Hydro Results Only an increase in areas with emergency in the Common Case (CFE, AESO)

WGA Drought – Changes in Total Annual Generation vs. Low Hydro GWh

WGA Drought – Changes in Generation by State vs. Common Case Low Hydro Results

WGA Drought – Changes in Generation by State vs. Low Hydro Result of increased forced outages applied to plants in the Lower Colorado water basin Result of increased forced outages applied to plants in the California water basin

WGA Drought – Changes in Region to Region Transfers

WGA Drought – Changes in Transmission Utilization P45 SDG&E-CFE P29 Intermountain-Gonder P26 Northern- Southern California P03 Northwest-British Columbia P47 – Southern New Mexico Most Heavily Utilized Paths Increases in U90 Relative to Common >5% Case Indicated in Red P08 Montana to Northwest P60 Inyo-Control P27 IPP DC Line P11 West of Crossover P10 West of Colstrip P01 Alberta-British Columbia

Questions or thoughts on this study?