Exploration Flight and Project Development Office Launch and Crewed Systems Office (MXS) Space Launch Systems WBS 585777.08.50 Payload Fairing Monthly.

Slides:



Advertisements
Similar presentations
National Aeronautics Space Administration SDOHM Meeting Collaboration Cafe Update- Top Six Ideas Gerry Schumann March, 2013.
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Larry Phillips MAY 13th-17th, 2002 Micro Arcsecond Xray Imaging Mission: Pathfinder (MAXIM-PF) Launch Vehicle Information Final Version.
NASA’s Goddard Space Flight Center LRO SRR Project Management.
Aug.19, 1999 George T. Roach Integration Mission Design Center NASA- GSFC Code 543 Greenbelt, MD FAX
Copyright © 2013 United Launch Alliance, LLC. Unpublished Work. All Rights Reserved. Civil Space 2013 Critical Challenges: Safety, Mission Assurance, and.
National Aeronautics and Space Administration 1 GRC All-Hands Meeting 1 May 2006.
National Aeronautics and Space Administration DEVELOP National Program 2.
National Aeronautics and Space Administration Commercial Crew Initiative Overview and Status to the COMSTAC Philip McAlister NASA Exploration Systems Mission.
Introduction to ARA’s Proposal Resources Don Cole
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
@ Industrial Engineering by Bopaya Bidanda David I. Cleland.
AMP – SAMS/MAMS/PIMS 1 GRC Project Manager: MSI/Kevin McPherson Chief Engineer: Alan Linne Safety Mission Assurance Lead: Bipin Patel NASA Customer: SOMD/Brad.
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
Effective Methods for Software and Systems Integration
National Aeronautics and Space Administration Commercial Crew Initiative Overview and Status with a Focus on Insight / Oversight Approach to the COMSTAC.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
National Energy Technology Laboratory U. S. Department of Energy Project Kickoff Presentation December 16, 2003 Ken H. Green Principal Investigator Development.
OSF/ISD Project Portfolio Management Framework January 17, 2011.
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
1 Community-Based Care Readiness Assessment and Peer Review Team Procedures Overview Guide Department of Children and Families And Florida Mental Health.
Mars 2020 Project Matt Wallace Deputy Project Manager August 3, 2015.
NASA TECHNICAL STANDARDS PROGRAM NASA TECHNICAL STANDARDS PROGRAM 1 Dryden Flight Research Center Presentation to NASA Technical.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Office of Acquisition and Property Management Proposed Changes to Attachment G FY 2011 – FY 2015 Five Year Plan.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
Presented to: COMSTAC RLV Working Group By: Ken Wong, Licensing and Safety Division Manager Date: May 15, 2008 Federal Aviation Administration Federal.
Exploration Flight and Project Development Office Launch and Crewed Systems Office (MXS) Space Launch Systems WBS Payload Fairing Monthly.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
1 Commonwealth Project Management Division Bob Haugh Project Management Division November 15, 2010 Revision of.
Advance Planning Briefing for Industry 10 October 2008 Mr. Chuck Comaty.
U.S. Muon Accelerator Program: MICE Milestones & Resource-Loaded Schedule M. A. Palmer, Director October 31, 2012.
PU-PPPL Earned Value Management System Overview Thomas Egebo October 4-6, 2011 Princeton University Plasma Physics Laboratory EVMS Certification Review.
National Aeronautics and Space Administration Transitioning Toward the Future of Commercial Human Spaceflight COMMERCIAL CREW PROGRAM AIAA Spring Dinner.
NASA Update NDIA PMSC Quarterly Meeting February 4, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis Team)
NASA/Air Force Cost Model presented by Keith Smith Science Applications International Corporation 2002 SCEA National Conference June
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
Constellation Space Transportation Planning Office July 30, 2009.
The Goal: To Climb Above The Competition Copyright 2005: I Lead Projects, L.L.C. Course Description Project Process Workplates Project Process Workplates.
SPACE SHUTTLE PROGRAM Space Shuttle Business Office NASA Johnson Space Center, Houston, Texas Presenter Date Page 1 Space Shuttle Program Flight and Ground.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
National Aeronautics and Space Administration February 27, 2013 Defining Potential HEOMD Instruments for Mars 2020 A Work in Progress... NOTE ADDED BY.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
Approved For Public Release © The Aerospace Corporation 2009 June 17, 2009 Initial Summary of Human Rated Delta IV Heavy Study Briefing to the Review of.
ISS Commercial Resupply Services Michael Suffredini ISS Program Manager June 17 th, 2009 Augustine Committee UPDATED: Corrected page 10 (replaced “first.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
Alpha Magnetic Spectrometer NASA / DOE National Aeronautics and Space Administration AMS-02 ROAD TO COFR Mike Fohey July 15, 2004.
Shell Buckling Knockdown Factor Project Overview and Status
Office of Critical Decision-1 Approve Alternative Selection & Cost Range or Brief Presented by:
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
Know how NASA plans and implements space missions Comprehend the essential components of a space mission Comprehend the selection and training of astronauts.
JTAMS PRE-CDR IT/SIS ANALYSIS
CAD/PAD Development Process
SPF MAG Quarterly Report – Feb 2015
Milestone A to Milestone B Requirements Management Activities
JTAMS PRE-CDR IT/SIS ANALYSIS
NASA Hypersonic Research
Defining the Activities
TEMPO’s Commercially Hosted Payload Concept
GLAST Large Area Telescope:
Lockheed Martin Canada’s SMB Mentoring Program
Ares Project Overview – Quality in Design
Project Management Process Groups
March ’05 Face to Face Meeting Introduction
Jeff Dutton/NASA COR August 26, 2019
Presentation transcript:

Exploration Flight and Project Development Office Launch and Crewed Systems Office (MXS) Space Launch Systems WBS Payload Fairing Monthly Status Joe Roche March (February) 2013

2 Project Mission Statement: Develop and produce cargo payload fairings for the initial and block 1 SLS launch vehicles GRC Scope: Project leadership of a multi center team SE&I Lead Structures Lead Payload Environmental Control Lead Mechanical Systems Lead Ground Systems Lead System Integration & Test Lead (includes major qualification testing) Project Life Cycle Schedule Launch and Crewed Systems Office (MXS) WBS Spacecraft and Payload Office (SPIO) Payload Fairing GRC Project Manager: MXS / Gerry Sadler GRC Chief Engineer: Damian Ludwiczak GRC Safety Mission Assurance Lead: QE/Scott Numbers NASA Customer: MSFC/SLS/SPIO Key Contractor(s): n/a MilestonesMCRSRR CkptSRRSDRPDRCDRDCR EM-1 Launch EM-2 Launch EM-3 Launch EM-4 Launch Program - Actual/Baseline3/1111/113/29 3/153/1610/1512/158/15 SPIO – Actual/Baseline12/114/2August1/131/158/16

National Aeronautics and Space Administration Launch and Crewed Systems Office (MXS) WBS SPIO Payload Fairing 3 CostScheduleTechnicalManagement Current MonthGG G G Prior MonthGGGG Summary Status Issues & Help Needed:

National Aeronautics and Space Administration Launch and Crewed Systems Office (MXS) WBS SPIO Payload Fairing 4 Key Accomplishments: –Continuing independent sizing of the Boeing Delta IV 5.1 meter diameter composite fairing. The Finite Element Model (FEM) was completed on January 22 nd. Aerodynamic loads are being mapped to the model and structural sizing will be performed using the actual material system as soon as properties are obtained. This analysis will be used to compare and validate the current sizing methodology and analytical processes with the received Boeing Request for Information (RFI) submitted values for the 5.1 meter fairing. –A meeting was held between the Boeing Company and the Payload Fairing team at GRC on January 24 th. Boeing representatives included Mr. Mark Cleveland, Mr. Bob Dalee, Mr. David Frost, Mr. Thomas Fung, Mr. Mike Shaw and Mr. Bryan Willhoite. The meeting focused on addressing questions identified from the Boeing RFI response and gaining additional insight into the design, qualification, assembly, and operations aspects of the Boeing Delta II, IV and Sea Launch fairings. –The Payload Fairing team completed evaluating the Payload Fairing and Adapter RFI Section 5.0, “Development of an 8.4m Meter Fairing” (new 8.4m diameter fairing design) on January 25 th. Results of the evaluation are being consolidated and summary charts are being assembled. –Mr. Thomas Fung, Program Manager, Delta IV Payload Fairing, presented the Delta IV 5.1 meter metallic payload fairing overview and design to the GRC Fairing team on January 25 th. The Delta IV metallic payload fairing was designed and developed by Boeing under the Titan IV program and has flown successfully on 33 flights. Mr. David Frost, Director, Sea Launch Payload Accommodations Hardware, presented the Sea Launch 4 meter composite payload fairing and lessons from the fabrication of an Out-of-Autoclave 4 meter fairing. The Sea Launch 4 meter composite payload fairing was designed and developed by Boeing using the latest composite technology and has flown successfully on 33 flights.

National Aeronautics and Space Administration Launch and Crewed Systems Office (MXS) WBS SPIO Payload Fairing 5 Key Accomplishments:  A briefing was presented on the “Payload Fairing 5m Class Separation Assessment Process” to Mr. Rene Ortega and the SPIO Engineering Review Board (ERB) on February 5th. The purpose of the briefing was to inform the board of the methodology and tools used to produce a fairing separation simulation. This analysis will be used to determine if the existing 5m class fairings can clear the 8.4m SLS vehicle while using qualified heritage separation systems. It will also determine what the limitations for separation are as far as vehicle axial acceleration, and additional acoustic treatment (mass) limits. A secondary objective was to validate the Fairing team’s structural modeling methodology and tools by demonstrating sizing, design criteria, mass factors and Mass Growth Assumptions (MGA) are in line with existing fairing designs flown.  The Fairing team completed assembling a summary presentation of evaluation data from the Payload Fairing and Adapter Request for Information (RFI) responses on February 6th. The summary includes results for Section 3.0, “Adaption of Existing Available Payload Fairings” (potential existing 5m class fairings) and Section 5.0, “Development of an 8.4m Meter Fairing” (new 8.4m diameter fairing design). Data on the MSFC evaluation of Section 4.0, “Adaption of Existing Available Payload Adapters” is due on February 8th to complete the package. A GRC management review is scheduled for February 15th.  A meeting was held with Lockheed Martin representatives Mr. Gary Howard, Program Manager, and Mr. Mike Gnau, Business Development Manager at GRC on February 8th. A list of questions from the Payload Fairing team on the Lockheed Martin-Ruag Space RFI response was reviewed and programmatic questions were answered. Lockheed Martin will be meeting with Ruag on February 11th to address many of the technical questions and another meeting between the Fairing team and Lockheed will be schedule to discuss all of the questions.

National Aeronautics and Space Administration Launch and Crewed Systems Office (MXS) WBS SPIO Payload Fairing 6 Key Accomplishments: –The bottoms up 119’ Composite Payload Fairing cost estimate was presented to Mr. David Beaman, SPIO Project Manager, Ms. Lori Mullins, SPIO Technical Assistant, Mr. Rene Ortega, SPIO Chief Engineer, and Mr. Jim Lomas, Spacecraft and Payload Accommodations Systems lead, on February 13th. The cost estimate showed a significant cost savings over the current baseline. The estimate was also corroborated with recently received Payload Fairing Request for Information (RFI) responses from industry. –Equivalent material properties for the Ruag Atlas V fairing were derived on February 13th. Requested actual properties were not available due to proprietary issues. The estimated properties were produced from the basic T300 fiber and MTM45 matrix properties using the pcGina micro-mechanics program with adjustments for the fiber volume to simulate the resin rich fabric manufacturing process. Fairing resizing is in process and updated weights and stiffness will be provided for the separation simulation. Adjustments are also being incorporated into the separation model to account for the proposed stretched ICPS Hydrogen tank that will provide additional clearance for the fairing due to the added 5m diameter tank length. –The Payload Fairing team presented a summary of the evaluation data from the Payload Fairing and Adapter RFI responses results to GRC Management on February 15th. The summary includes results for Section 3.0, “Adaption of Existing Available Payload Fairings” (potential existing 5m class fairings) and Section 5.0, “Development of an 8.4m Meter Fairing” (new 8.4m diameter fairing design). Data on the MSFC evaluation of Section 4.0, “Adaption of Existing Available Payload Adapters” was not reviewed. Concurrence was received from GRC Management with a few minor suggested modifications. Revisions will be incorporated and the summary is scheduled to be presented, with the 4.0 Payload Adapter information included, to the SPIO management on February 20th.

National Aeronautics and Space Administration Launch and Crewed Systems Office (MXS) WBS SPIO Payload Fairing 7 Key Accomplishments: - Completed the preliminary sizing for the metallic Delta IV-43M fairing on February 19 th. The model includes the HyperSizer default isogrid construction rotated by 90 degrees for the barrel and the two nose pieces, with the nose tip modeled as a solid plate. The fairing sizing with updated weights for the non-structural mass, and stiffness will be provided for the separation simulation to assess the feasibility of the tri-sector fairing for a SLS mission. - The Payload Fairing team presented a summary of the evaluation data from the Payload Fairing and Adapter Request for Information (RFI) responses to Mr. David Beaman, SPIO Project Manager, Mr. Rene Ortega, SPIO Chief Engineer, and Mr. Jim Lomas, Spacecraft and Payload Accommodations Systems lead, on February 20 th at MSFC. The summary included results for Section 3.0, “Adaption of Existing Available Payload Fairings” (potential existing 5m class fairings), the MSFC evaluation of Section 4.0, “Adaption of Existing Available Payload Adapters”, and Section 5.0, “Development of an 8.4m Meter Fairing” (new 8.4m diameter fairing design). The review was well received with concurrence on the results with a few minor suggested modifications to be incorporated before the package is to be presented to Mr. Dan Dumbacher, Deputy Associate Administrator for Exploration Systems and Development.

National Aeronautics and Space Administration Launch and Crewed Systems Office (MXS) WBS SPIO Payload Fairing 8 Reporting Monthly Priorities Lockheed Martin meeting with Fairing team (responses to RFI questions), TBD. Proposed Fairing FY’14 tasks to SPIO, March 7 th. 30/60/90 day look ahead: Baseline Fairing configuration briefing at PDR Kick-off, May 15 th.

National Aeronautics and Space Administration Accomplishments February 9 Launch and Crewed Systems Office (MXS) WBS SPIO Payload Fairing Next 2 Months Travel (Location/Dates/Purpose/)- Funded and Unfunded Location FromToFundedPurpose JPL yExplore sls mission possibility

National Aeronautics and Space Administration Launch and Crewed Systems Office (MXS) WBS SPIO Payload Fairing 10 Project is less than 1 month behind planProject is less than 2 months behind planProject is greater than 2 months behind plan Schedule Color Key Milestone Summary Milestones (FY13)BaselineProjectedActualSchedule Variance Program – SRR CheckpointNov 11Nov 12 SPIO – SRR/SDR CheckpointDec 13Dec 9 Program – SRR / SDRMar 12Mar 29 SPIO – SRR (kick off)April 2 SPIO – SDR (kick off)AugustAugust 29 SPIO – SDR (board)OctoberOctober 17