ERL Differential Current System Status Peter Cameron with contributions from Michelle Wilinski and Christophe DeFrance (Bergoz) 17 Sep 07.

Slides:



Advertisements
Similar presentations
Page 1 M.Ungaro Deep Processes Working Group Meeting Feb Genova Italia E1-DVCS2 Run Status e1-dvcs2 Run Status Maurizio Ungaro University of Connecticut.
Advertisements

Mark Heron Diamond Light Source Oct 2007 EPICS EPICS Interface to the Libera Electron Beam Position Monitor.
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Microtron,TL1 and Booster Diagnostics Status Hussein AL-MOHAMMAD RF & DI Group SESAME 12 th TAC.
HPS MPS OVERVIEW Dan Sexton & the Safety Systems Group JLAB 1.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
Polar Loop Transmitter T. Sowlati, D. Rozenblit, R. Pullela, M. Damgaard, E. McCarthy, D. Koh, D. Ripley, F. Balteanu, I. Gheorghe.
PEDM Review 12/7/091 Beam Position Monitors William Morse.
EE 198 B Senior Design Project. Spectrum Analyzer.
Use of FOS for Airborne Radar Target Detection of other Aircraft Example PDS Presentation for EEE 455 / 457 Preliminary Design Specification Presentation.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
Spectrum Analyzer Basics Copyright 2000 Agenda Overview: What is spectrum analysis? What measurements do we make? Theory of Operation: Spectrum analyzer.
ORNL-SNS Diagnostic Group SNS Beam Loss Monitors and HARPs Machine Protection System FDR September 11,2001 Presented by Saeed Assadi.
FLASH Toroid Review Progress since last meeting in April Next steps Summary Johnny Ng FLASH Coll. Mtg. 7/25/03.
September 22, 2005 ESF Workshop-Perugia 1 Virgo Control Electronic upgrade Annecy/Pisa/EGO B.Mours.
Beam Instrumentation for Orbit Stability I. Pinayev.
Characterization of Fast Orbit Feedback System Om Singh, APS, ANL NSLS-2 Beam Stability Workshop BNL, April 18-20, 2007.
CRIO as a hardware platform for Machine Protection. W. Blokland S. Zhukov.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Experience with DCCTs at DESY Klaus Knaack. All DC current measurements at DESY are done by PCTs (DCCTs) from Bergoz. They are installed in all circular.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
Digital Signal Processing and Generation for a DC Current Transformer for Particle Accelerators Silvia Zorzetti.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
BPM System Status P. Cameron 13 Aug 07. Outline 1.Notes from NSLS-II Design Review (last Thursday) 2.System Block Diagram 3.Process Variables 4.DAQ status.
LLRF-05 Oct.10,20051 Digital LLRF feedback control system for the J-PARC linac Shin MICHIZONO KEK, High Energy Accelerator Research Organization (JAPAN)
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
An RF & High-Speed Acquisition Systems for High-Gradient Tests at CLIC Test Facility Raquel Fandos.
BBQ system Tatiana and Benoit, thanks to a lot of help from Christian Boccard, Marek Gasior and Ralph Steinhagen (BE/BI-QP)
Stability of the electron energy Recycler department meeting April 5 th, 2006 A. Shemyakin, M. Sutherland.
G5 Beam Instrumentation D. Gassner, E. Pozdeyev 4-09.
1 CC & MP - CC10 - CERN Crab LHC J. Wenninger CERN Beams Department for the LHC Machine Protection Panel.
Collimator BPM electronics – Results from the lab, SPS and LHC
G. BrunoOffline week - February Comparison between test- beam data and the SPD simulations in Aliroot G. Bruno, R. Santoro Outline:  strategy of.
Present Uses of the Fermilab Digital Signal Receiver VXI Module Brian Chase,Paul Joireman, Philip Varghese RF Embedded Systems (LLRF) Group.
October, 2009 Internal Review Beam Instrumentation David Gassner.
FIELDS iCDR – RFS Analog Dennis Seitz 1 Solar Probe Plus FIELDS Instrument CDR RFS Analog Dennis N. Seitz UC Berkeley SSL
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
BCT’s for beam protection L. Søby On behalf of D. Belohrad, L. Jensen and P. Odier 6/12/15Internal workshop ON MPP readiness for MJ beams 1.
Beam losses in the CLIC drive beam: specification of acceptable level and how to handle them ACE Michael Jonker.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
Radiation 4-5 December 2005 AB/BDI/BL.
ERHIC Orbit Correction Studies (Minor Update) Using Oct’14 lattice and dispersion diagnostic January 5, 2015Stephen Brooks, eRHIC FFAG meeting1.
Electron beams in order to sense nm-size mechanical vibrations? CERN: Marek Gasior: BBQ electronics (Andrea Boccardi: VME electronics) Juergen Pfingstner:
NUMI Primary Beam Review August 14, 2001 NUMI PRIMARY BEAM INSTRUMENTATION Multiwires, Loss Monitors, Toroids Gianni Tassotto.
APEX 2 Nov 06 the 60Hz Harmonics Problem Peter Cameron.
4. Operations and Performance M. Lonza, D. Bulfone, V. Forchi’, G. Gaio, L. Pivetta, Sincrotrone Trieste, Trieste, Italy A Fast Orbit Feedback for the.
Improvements to the LHC DCCT system P. Odier, C. Barschel, J.-J. Gras, L. Jensen, J. Longo, M. Ludwig, S. Thoulet P.Odier BI day /18.
Notes from Tom’s visit 1. Controls is under-staffed 2. Common Diagnostics platforms (BPM, FCT, DCCT, BLM,…) 3. Where possible, ‘Smart’ Diagnostics, running.
Estimates of required MPS reaction time In the merger (at the centers of respective 20deg dipoles and in between 2 lenses) rms R=250 um In the
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
LCLS MPS Upgrade Gasper Jansa, Luciano Piccoli, Jeff Olsen, Garth Brown, Sonya Hoobler, Stephen Norum, Stephanie Allison, Kim Kukhee Adding BSA.
FLASH RF gun developments. Sven Pfeiffer for the LLRF team FEL Seminar Hamburg,
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
HB2008 – WG F: 27 Aug. S. Childress – Diagnostics_2MW 1 NuMI Beam Diagnostics and Control Steps to 2 MW S. Childress Fermilab.
PXIE Beam Instrumentation Status Update Vic Scarpine Weekly PIP-II Meeting June 7, 2016.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
ICS interfaces Timo Korhonen ICS Apr 22, 2015.
SuperB-DCH S ervizio E lettronico L aboratori F rascati 1LNF-SuperB Workshop – September 2010G. Felici DCH FEE STATUS Some ideas for Level 1 Triggered.
Beam diagnostics from GSI
Status of the ASTRID2 facility
LHC BLM system: system overview
Low Level RF Status Outline LLRF controls system overview
BESIII EMC electronics
New PSB beam control rf clock distribution
Low Level RF Status Outline LLRF controls system overview
Presentation transcript:

ERL Differential Current System Status Peter Cameron with contributions from Michelle Wilinski and Christophe DeFrance (Bergoz) 17 Sep 07

Outline 1.Damage threshold estimate 2.Test setup pictures, block diagram,… 3.DSA measurements a)Noise floor and DC drift b)Effect of temperature c)Conclusions from DSA measurements 4.FPGA measurements a)Block diagram b)measurement sensitivity 5.Discussion, conclusions,…

1 uA-sec (6x10 12 electrons, or 1uC) used in the following slides

signal generator BergozElectronics BergozElectronics Agilent FFT box FPGA board Floppy ethernet Excel LabVIEW Test Setup Block Diagram scope

not 1/f !!! Full span (PCT nominal BW is 10KHz) noise spectrum

No averaging Comparison of single toroid and difference spectra single toroid difference of the two toroids

Bergoz – 5 averages (note log scale) Comparison with Bergoz measurement

Include spectral shaping in null? 400Hz BW noise spectra

Bergoz – 5 averages (note log scale)

Effect of temperature stabilization

Out of office What happened here??? B field change? 100uA/gauss gives.02 gauss uA-sec on 1 minute ~0.1 nA-sec drift over 160 minutes Time/temperature dependence of difference current

.0033 uA-sec Zoom on previous slide

Conclusions from DSA Measurements 1.Toroids meet Bergoz spec in uncontrolled conditions (temperature, magnetic field) of office test environment 2.Study and optimize proper thermal shielding 3.Frequent null calibration should not be needed 4.Slow loss limit should be in the range of 1nA-sec or better 5.Should be a useful diagnostic a)Machine protection b)(unprecedented and essential) Halo studies at ~10 -6 need moveable scrapers? 6.Need to understand vector averaging (more on this later)

Outline 1.Damage threshold estimate 2.Test setup pictures, block diagram,… 3.DSA measurements a)Noise floor and DC drift b)Effect of temperature c)Conclusions from DSA measurements 4.FPGA measurements a)Block diagram b)measurement sensitivity 5.Discussion, conclusions,…

BPM (also FCT, DCCT, BLM,…) Block Diagram

signal generator BergozElectronics BergozElectronics ML403 ethernet Lab VIEW Test Setup Block Diagram A to D FPGA wrapper Simulink Signal processing, feedback loop, MPS interface,… DIO DAC MPS null MPS function runs independent of Control System - robustness

BPM Module Embedded processor running vXworks/EPICS 9.38MHz RF reference x4 or x8 Laser pre- trigger Beam permit Process Variables (beam position,…) Process Variables (machine mode, beam mode,…) FPGA 1 sec event A/D PUE signals

FPGA board control panel

spectral content of simulated beam loss

Next slide is zoom on this

Time [minutes] 1 uA-sec loss signal FPGA-based beam loss measurement (S/N ~same for DSA and FPGA) no loss signal

Comments, conclusions Consider toroid upgrades for RHIC –Present DCCTs are 5uA/rtHz? –Going to 0.1uA/rtHz would give much more sensitive diagnostic for machine tuning - this is important! Implementation of DI measurement on FPGA board was straightforward ~2 man-weeks of Joe Mead, 1 man-week of Pete Cameron Paradox? need to understand vector averaging,… see simulation Where from here? –Basic system functionality and spec demonstrated –I’m on travel for most of the coming month, then Run 8 –Priority shift to BPM electronics BPM system –Libera demo box due in any day now (after 3 months of trying to get it) –I’m at ITech (Slovenia) next week to work out details of Libera in ERL –Commercial vendor (the major supplier of demo boards) exploring design and fab of COTS FPGA board to our spec (~$1K vs ~$10K or more for Libera box, and much simpler) –Joe Mead is fabbing 4ch fast digitizer mezzanine for ML403 Hold off on further DI development until next spring?

Suggestions for upcoming meeting agendas Sep 17 th – presentation and discussion of DCCT and differential current status Sep 24 th – presentation and discussion of Profile status Oct 1 st – presentation and discussion of BPM status Oct 8 th – Scrapers and collimators