A.Levin, IHEP, Protvino, RussiaApril 27, 2010 2nd PANDA Russia Workshop Status-report on the barrel mechanical design work. A.Levin Institute for High.

Slides:



Advertisements
Similar presentations
Knock Down Fittings Product Design.
Advertisements

R.Novotny a*, S. F. Burachas d, W. Döring a, V. Dormenev b, Y. M. Goncharenko c, M. S. Ippolitov d, A. Hofstaetter e, M. Korzhik b, V. Manko d, Y. M. Melnick.
J-C Brient LLR Progress report on the ECAL prototype 2 - New informations on the cost of the W-Si ECAL 3 - A proposal for a new design of the.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status.  Assembly Hall. - Removal starts and is in progress. - Main infrastructure.
TEAM 4 Assembly of a Simple Clamping System Under a Virtual Environment.
SPACE FRAME Interface between the LGT and the IST 21/06/2011 Marco Ciapetti.
Protvino in the PANDA barrel Electromagnetic Calorimeter (first look)
Single PET-module Design Update 1 TRIMAGE Meeting Munich, Dec. 12,2014 WP 3 Design and optimization of PET-system Andreas Seebacher, raytest.
G.Barber - Imperial College London - EE Workshop March EE Dee Assembly Contents:- Area Manipulator Future Plans.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
Shashlik type calorimeter for SHIP experiment
Status of the PSD (Jan. 2009) F.Guber, INR, Moscow.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
A.Vasiliev, IHEP-Protvino 2-nd PANDA meeting in Russia, April 26-28, 2010 IHEP activity in barrel Alexander Vasiliev (IHEP-Protvino) PANDA electromagnetic.
R&D Scintillators / IPN Orsay Joël Pouthas R&D Detector Department.
M. Gilchriese Disk Geometry January 18, M. Gilchriese 2 ATLAS Coordinate System.
XML Description of ECAL Geometry  For XML description of ECAL Geometry were used: Det/XmlDDDB/v5, Det/XmlEditor/v4, Det/DetDesk/v6, Vis/GaudiLab/v1r4.
ALICE high p T workshop, LBNL, April 7, 2009 (T. Chujo) J-Cal Construction Plan Tatsuya Chujo University of Tsukuba (for the ALICE J-Cal Project) 1.
1 US Pixel Mechanics Role Global support structureIntermediate support structureLocal support structure Stave SectorDisk Barrel x (9-11) x5 x (22,40,56)
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Cristina Lo Bianco - LLR Cosmics test for the W-Si prototype (CALICE) Why the test in cosmics? The cosmics test-bench DAQ for the cosmics test-bench All.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
EP/ED group meeting1 ALICE PIXELS DETECTOR.
Status & Plans of the CBM-MPD STS CONSORTIUM Yuri Murin for the CBM STS Consortium JINR-SINP-KRI-SPbSU-SESRITIIE-BITP-IHEP –(ITEP)- GSI.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
V. Korbel, DESY1 Progress Report on the TESLA Tile HCAL Option To be filled soon.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
PANDA Collaboration Meeting D. Rodríguez Piñeiro SciTil and Next Steps.
Neutrino 1 Assembly Process. Neutrino 2 Assembly Process Step 1: Basement I beams positionned and fixed on the ground. Flatness checked.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
CALOR 2008 Philippe Rosier – PANDA The Electromagnetic Calorimeter of the future PANDA detector P. Rosier Institut de Physique Nucléaire d’Orsay.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Valérie Chambert and Joël Pouthas
P. Sutcliffe Liverpool University
Baby-MIND Modules & Services
RPC with strip readout Last results from test of timing glass
Construction and Assembly
PANDA Fw Endcap EMC, status prototype
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Development of a low material endplate for LP1 and ILD
PANDA Yoke of the Magnet
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
T2K Upgrade First look at TPC contraints (WAGASCI Constraints)
Status of works on the Collaboration Contract between IHEP and FAIR
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
GRPC activity for EuDHCAL in IHEP-Protvino
IHEP group Shashlyk activity towards TDR
Testing and installation of prototype diode insulation system in MB2950 Florian Meuter, 3rd Meeting on Diode Consolidation during LS2,
Rod adaptors for module tests Module positioning studies
Work packages status in Torino and perspectives
HYCAL Overview We started from the design.
Sections, Assemblies & Exploded
SUPPORT FRAME ASSEMBLIES, 4 REQUIRED
NPS mechanical design 11/13/2018 Jlab meeting
Status of the PANDA Solenoid Magnet Production in BINP
NPS mechanical design 01/31/2019 Jlab meeting
PANDA Collaboration Meeting
Presentation transcript:

A.Levin, IHEP, Protvino, RussiaApril 27, nd PANDA Russia Workshop Status-report on the barrel mechanical design work. A.Levin Institute for High Energy Physics Protvino, Russia

A.Levin, IHEP, Protvino, RussiaApril 27, 2010 Mechanical structure design status. 1. Preliminary design for types 1, 6, 10 and 11 of the crystal module mechanical structure is done for the normal slice. 2. Preliminary design for individual mechanical parts of crystal modules (carbon fibre alveole, aluminium inserts and intermediate plates etc.) is done. 3. Drawings for the tooling (mould) to produce alveole prototype are done. Mould was made at the beginning of 2010.

A.Levin, IHEP, Protvino, RussiaApril 27, 2010 Crystal module design. Individual slice with worked out modules. Support module plate Module type 1 Module type 6 Module type 11 Module type 10

A.Levin, IHEP, Protvino, RussiaApril 27, 2010 Crystal module design. Module type 6. Assembled view. Intermediate plate Alveole insert Crystal with APD Carbon alveole pack Module type 6. Exploded view.

A.Levin, IHEP, Protvino, RussiaApril 27, 2010 Design for individual mechanical parts. Module type 6. Module type 6. Intermediate plates.

A.Levin, IHEP, Protvino, RussiaApril 27, 2010 Design for individual mechanical parts. Module type 6. Alveole insert.

A.Levin, IHEP, Protvino, RussiaApril 27, 2010 Design for individual mechanical parts. Module type 6. Individual carbon alveole. Alveles pack.

A.Levin, IHEP, Protvino, RussiaApril 27, 2010 Crystal module design. Module type 1. Assembled view.Module type 1. Exploded view. Intermediate plate Alveole insert Crystal with APD Carbon alveole pack Finger with screw

A.Levin, IHEP, Protvino, RussiaApril 27, 2010 Urgent necessity. Finger with screw Support module plate Intermediate plate Alveole insert Capsule frame Area of APD and Asic chip ??? Scintillator crystal PWO Carbon fiber alveole Module type 1. Local cross section.

A.Levin, IHEP, Protvino, RussiaApril 27, 2010 Design for individual mechanical parts. Module type 1. Module type 1. Intermediate plates.

A.Levin, IHEP, Protvino, RussiaApril 27, 2010 Design for individual mechanical parts. Module type 1. Alveole inserts.

A.Levin, IHEP, Protvino, RussiaApril 27, 2010 Design for individual mechanical parts. Module type 1. Individual carbon alveole. Alveles pack.

A.Levin, IHEP, Protvino, RussiaApril 27, 2010 Crystal module design. Super module type 10/11. Assembled view. Module type 10 Module type 11

A.Levin, IHEP, Protvino, RussiaApril 27, 2010 Crystal module design. Super module type 10/11. Exploded view. Intermediate plate Alveole insert Finger with screw Crystal with APD Carbon alveole pack. Type 11. Carbon alveole pack. Type 10. Crystal with APD Alveole insert

A.Levin, IHEP, Protvino, RussiaApril 27, 2010 Design for individual mechanical parts. Super module type 10/11. Super module type 10/11. Intermediate plates.

A.Levin, IHEP, Protvino, RussiaApril 27, 2010 Design for individual mechanical parts. Super module type 10/11. Alveole inserts.

A.Levin, IHEP, Protvino, RussiaApril 27, 2010 Design for individual mechanical parts. Module type 10. Individual carbon alveole. Alveles pack.

A.Levin, IHEP, Protvino, RussiaApril 27, 2010 Design for individual mechanical parts. Module type 11. Individual carbon alveole. Alveles pack.

A.Levin, IHEP, Protvino, RussiaApril 27, 2010 Tool design. Mould for alveole prototype production. Assembled view. Side plate Mandrel Tightening screw End plate

A.Levin, IHEP, Protvino, RussiaApril 27, 2010 Nearest plans 1.Final design for types 1, 6, 10 and 11 of crystal modules. 2.Preliminary design for remaining types of crystal modules for the normal slice. 3.Production drawings for moulds to make types 1 and 11 of alveoles.