Doc.: IEEE 802.11-99/252 Submission November M. Hoeben - No Wires Needed Load Balancing PAR Criteria Maarten Hoeben.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /661r1 Submission November 2002 Ziv Belsky, WavionSlide 1 Proposal for the 5 criteria for the HT SG.
Advertisements

Doc.: IEEE /661r0 Submission November 2002 Ziv Belsky, WavionSlide 1 Proposal for the 5 criteria for the HT SG.
Doc.: IEEE /078 Submission May 2000 Matthew Shoemake, AlantroSlide 1 Information Regarding and Status of HRbSG Matthew B. Shoemake HRbSG Chairperson.
ECMP for 802.1Qxx Proposal for PAR and 5 Criteria Version 2 16 people from ECMP ad-hoc committee.
Doc.: IEEE /0085r2 Submission July 2011 Gerald Chouinard, CRCSlide Response to Comments received on the proposed a PAR and 5C Date:
Submission doc.: IEEE Comment #1 from WG Comment: In Section 5.2.b two examples of spectrum resource measurements are given: PER and.
Doc.: IEEE /1521r2 Submission January 2012 Marc Emmelmann, FOKUSSlide 1 AP and Network Discovery Enhancements Date: Authors:
1 Force10 Networks, Inc. - Confidential and Proprietary, For Internal Use Only 1 Higher Speed Ethernet Update Greg Hankins APNIC IX SIG APRICOT /02/28.
CSD for P802.1AS-REV WG Wednesday, 05 November 2014.
Doc.: IEEE /1510r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 Summary of PAR and CSD Discussion Date: Authors:
Doc.: IEEE /82a Submission Proposal for High Data Rate 2.4 GHz PHY Variable Rate Binary Convolutional Coding on QPSK Chris Heegard & Matthew B.
PAR and CSD for P802.1Qxx WG January PAR (1) 1.1 Project Number: P802.1Qxx 1.2 Type of Document: Standard 1.3 Life Cycle: Full Use 2.1 Title:
Doc.: IEEE /0130r0 Submission January 2008 Gal Basson (Wilocity)Slide 1 VHT PAR Direction Date: Authors:
Standardization of Mobile Wireless Small Cell Backhaul (SCB) Document Number: IEEE r Date Submitted: Source: Junhyeong.
Doc.: IEEE /0498r0 Submission April 2008 Eldad Perahia, Intel CorporationSlide 1 Modifications to the 60GHz PAR & 5 C’s Proposal Date:
Page 1 IEEE Ethernet Working Group - CSD Version 2.3 Items required by the IEEE 802 CSD are shown in Black text, supplementary items required by.
CSD for P802.1Qcj WG January Project process requirements Managed objects – Describe the plan for developing a definition of managed objects.
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
1 Recommendations Now that 40 GbE has been adopted as part of the 802.3ba Task Force, there is a need to consider inter-switch links applications at 40.
Submission doc.: IEEE 11-12/0553r4 May 2012 Jarkko Kneckt, NokiaSlide 1 Response Criteria of Probe Request Date: Authors:
1 6/3/2003 IEEE Link Security Study Group, June 2003, Ottawa, Canada Secure Frame Format PAR: 5 Criteria.
Doc.: IEEE /1220r0 Submission November 2009 Jon Rosdahl, CSRSlide 1 WG11 Comments on PARs submitted Nov 2009 Date: Authors:
Doc.: IEEE /0542r0 SubmissionSimone Merlin, QualcommSlide 1 HEW Scenarios and Goals Date: Authors: May 2013.
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
Doc.: IEEE /0616r2 Submission May 2013 Phillip Barber (Huawei Technologies)Slide 1 HEW Project Plan Discussion Date: Authors:
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: Security Problems related to Transition Date Submitted: January.
Doc.: IEEE xxxx-00-0psc Submission Slide1 PicoCast Forum Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
Doc.: IEEE /084r0 Submission March 2000 David Skellern, RadiataSlide 1 Comments by P WLAN WG on P WPAN High Rate Study Group PAR 7.
1 IEEE interim, Orlando, Florida, March, 2008new-nfinn-fast-chains-rings-par5c-0308-v1 Fast Recovery for Chains and Rings Proposal for PAR and 5.
Doc.: IEEE /126 Submission May 2000 Amar Ghori et.al., ShareWaveSlide 1 Answer to QoS Questions Amar Ghori Steven Gray Evan Green Raju Gubbi Maarten.
Doc.: IEEE sru Submission 11 November 2013 M Ariyoshi, S Kitazawa (ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /1436r0 Submission November 2004 Mike Moreton, STMicroelectronicsSlide 1 L2 Domain Indication Mike Moreton, STMicroelectronics 15 th.
SubmissionJoe Kwak, InterDigital1 Retrieving MIB contents from STA’s Joe Kwak, Marian Rudolf InterDigital doc: IEEE /554r0July 2003.
Doc.: IEEE /0356r0 Submission March 2009 Jon Rosdahl, CSRSlide 1 New WG PARs that WG11 must consider in March 2009 Date: Authors:
Doc.: IEEE /0860r0 Submission July 2010 Jon Rosdahl, CSRSlide 1 Comments for p New PAR – July 2010 Date: Authors:
Doc.: IEEE ulp Submission Slide 1 May 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
SubmissionJoe Kwak, InterDigital1 PHY measurements for interference reduction from 11h Joe Kwak, Marian Rudolf InterDigital doc: IEEE /537r0July.
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
IEEE Std Proposed Revision Purpose, Scope & 5 Criteria.
Doc.: IEEE /0616r0 Submission May 2013 Phillip Barber (Huawei Technologies)Slide 1 HEW Project Plan Discussion Date: Authors:
November 99 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Proposal for WPAN High Rate Study Group]
IEEE P criteria responses
Support for Advance Antennas & Techniques in WNM
doc.: IEEE <doc#>
Month 1998July 2000 doc.: IEEE /xxx January 2001
Review of March 2013 Proposed Pars
Stephen McCann, Siemens Roke Manor
“ Radio Measurements in Support of WLAN Management”
Management Frame Protection Study Group Request
VHT PAR Direction Date: Authors: January 2008 July 2007
Proposed PAR and 5 Criteria for High Throughput Task Group
WIEN Study Group Proposed Roadmap
Submission Title: [Proposal on PAR and 5C draft for BAN]
<month year> Denver, March 2006
Privacy Recommendation PAR Proposal
Proposed PAR and 5 Criteria for High Throughput Task Group
Submission Title: [Proposal on PAR and 5C draft for BAN]
Management Frame Protection Study Group Request
Proposed text for HTSG draft PAR and 5 Criteria
Below 6GHz 11vht PAR&5C's proposal
900 MHz ISM Band Date: Authors: January 2010 Month Year
Comments for p New PAR – July 2010
PCF Enhancements and Contention Free Bursts
IEEE Comments on aq PAR and 5C
IEEE Comments on aq PAR and 5C
CCK / OFDM Closing Summary
Load Balancing & Beacon Customization
Interest for HDR extension to a
July 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Merger Proposal #2 Affirmation of Commitment.
Presentation transcript:

doc.: IEEE /252 Submission November M. Hoeben - No Wires Needed Load Balancing PAR Criteria Maarten Hoeben

doc.: IEEE /252 Submission November M. Hoeben - No Wires Needed 1. Broad Market Potential Currently not part of the MAC, but very often an important evaluation criterion Regarded as essential for application of based systems in densely populated areas Most vendors already incorporate proprietary solutions in their products

doc.: IEEE /252 Submission November M. Hoeben - No Wires Needed 2. Compatibility with IEEE Standard 802 Load balancing is just another parameter in the roaming decision made by the station based on extra information about the load of an access point –It is a pure MAC change (PHY is unaffected) –It does not change the LLC interface Load balancing aware implementations will benefit from new function, current implementations will continue to work as before

doc.: IEEE /252 Submission November M. Hoeben - No Wires Needed 3. Distinct identity Not applicable –We’re simply adding something that improves the performance of based systems in densely populated areas

doc.: IEEE /252 Submission November M. Hoeben - No Wires Needed 4. Technical feasibility Some extra information fields in the Beacon and Probe Response frames is enough Just another parameter in the roaming decision of stations –Note that this is more an implementation issue Only simple modifications to the standard Proven technology –Proprietary systems already implement load balancing schemes

doc.: IEEE /252 Submission November M. Hoeben - No Wires Needed 5. Economical feasibility Straightforward implementation, backward compatibility and proven technology make load balancing economical feasible