1 Matadero Creek Trail Midtown Resident Association April 16, 2013.

Slides:



Advertisements
Similar presentations
Adobe 5 Collaborative Proposed Project Plan February 23, 2004.
Advertisements

ODOT Pedestrian and Bicycle Program Sheila Lyons, PE Local Area Government Conference 2011.
TIGER PROGRAM LESSONS LEARNED Great PA/NJ Regional Trail Projects Presentation to the Circuit Coalition May 15, 2014 Chris Stanford, P.E., PTOE, PMP Michael.
Neighborhood Meeting No.2 Golden Gate Bridge, Highway and Transportation Districts San Francisco Mid-Day Bus Parking Facility Contract No BT-1 March.
Town of Dryden, NY :: Hamlet of Varna – Community Development Plan Public Workshop Project Scoping/Issues Identification December 1, 2010.
Missoula Planning Summit Milestone 14 August, 2008 Missoula, Montana.
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
COMPLETE STREETS ROCHESTER, MINNESOTA September 28, 2011 Mitzi A. Baker, AICP Active Living Rochester Rochester-Olmsted Planning Department.
FY Budget May 15, 2013 Capital and Operations and Maintenance Expenditures.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
Building Innovative Facilities for a Multimodal Future 2014 BICYCLE MASTER PLAN UPDATE FINAL PUBLIC REVIEW Baltimore City Department of Transportation.
Slide 1. Slide 2 Introduction How did you get to school as a child?
6 th Street (Junipero to Bellflower) Bike Boulevard Design Concepts March 2012.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
U R B A N G R E E N I N G P L A N Green Vision 2035.
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
1 City of Rapid City and Rapid City Community Planning RAPID CITY BICYCLE AND PEDESTRIAN MASTER PLAN in collaboration with: Kadrmas, Lee and Jackson RDG.
2015 FLAP GRANT APPLICATION
Bike Routes and Pedestrian Routes. Bike Route Goals Create a safe route through the city Connecting parks, schools, and subdivisions Raise awareness of.
2030 Long-Range Transportation Plan Ithaca-Tompkins County Transportation Council Public MeetingFernando de Aragón TCPL October 15, 2008Staff Director.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Montgomery County Transit Task Force Meeting August 17, 2011.
1 UNION STREET Easthampton | Complete Street Conceptual Design { { Streetscape for Union Street Community Workshop October 28, 2013 Planning Department.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
Land Use Study for the Community of Winchester July 9, 2012.
City of Fitchburg, WISAA Design Group + Teska +Montgomery NORTH STONER PRAIRIE NEIGHBORHOOD PLAN Steering Committee Workshop: Plan Vision, Principles,
Alternative Transportation in Parks and Public Lands Sanibel City Council Update (November 17, 2009)
9 TH STREET IMPROVEMENT PLAN Corvallis Area Metropolitan Planning Organization (CAMPO) Ali Bonakdar.
Comprehensive Plan Update Kevin O’Neill Seattle Bicycle Advisory Board September 2, 2015.
Lower Taylor Creek Restoration Project Property Acquisition Seattle City Council - Seattle Public Utilities and Neighborhoods Committee June 9, 2015.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
Where is it going? Brighton Greenway Friends of Brighton Greenway.
A local Nature Path will  Health Benefits  Increase Property Values  Social Benefits for the surrounding community.
LITTLE BOHEMIA NEIGHBORHOOD ASSOCIATION 35E Bike Path Enhancement CIB Proposal.
What is a TSP? Provides City with guidance for operating and improving a multimodal transportation system Focuses on priority projects, policies, and programs.
JOHNSON STREET BRIDGE PROJECT COUNCIL WORKSHOP MAY 21, 2009.
APA, Planning, and Health Anna Ricklin, AICP Manager, Planning and Community Health Center.
Shoreline Drive/Greene Lane Park/McAllister Point Aquidneck Island Reuse Planning Authority Surplus Properties at NAVSTA Newport, Rhode Island March 6,
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
A PRESENTATION BY THE DISTRICT 1 COMMUITY COUNCIL SIDEWALK TO BATTLE CREEK REC.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Active Transportation Program California Transportation Commission Mitch Weiss 01/14/141.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
City of Redmond: Northwest Redmond & U.S. Highway 97 Plan - October 11, 2006 What Makes a Great Neighborhood.
Introductions Army Corps of Engineers Metro Parks Mayor’s Office HDR Engineering, Inc.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
ITEM 9B Authorize a Commercial Developer Agreement with Keller Watermere, L.P., for South Village at Watermere, located south of West Southlake Boulevard.
1 27 University Traffic Impact Analysis Pre-bidders Conference RFP No January 29, 2013.
C ENTRAL E STUARY P LAN A V ISION F OR O AKLAND’S W ATERFRONT Central Estuary Plan A VISION FOR OAKLAND’S WATERFRONT Specific Plan and Environmental Assessment.
Approve Humboldt Avenue Pedestrian and Bicycle Improvement Project Plans.
Ball Field Land Acquisition Due Diligence Report.
Public Input Meeting April 16, Meeting Schedule Housekeeping Meeting Schedule – Open House – 6:00-6:30 pm – Presentation – 6:30-7:00 pm – Q&A –
Capital Metro Downtown Station Improvements CMTA Board Briefing – October 2016 Interlocal Agreement (ILA) with City of Austin.
CONTRACT AWARD TO ALTA PLANNING AND DESIGN FOR CONSULTANT SERVICES TO CONDUCT SAFETY OUTREACH AND UPDATE THE SUGGESTED ROUTES TO SCHOOL MAPS FOR THE SAFER.
Finance Committee & City Council October 10, 2016
The Central Avenue Connector Trail
City Council Meeting November 7, 2016
Capital Metro Downtown Station Improvements
Center City Connector 101.
Stanford Avenue/El Camino Real Intersection Improvements Project
Finance Committee & City Council August 8, 2016
STREETS & STORMWATER DEPARTMENT
El Cerrito Active Transportation Plan
City of Wilmington Bike Plan Update
Meadow Lake Boulevard Street Extension Project
I-85 Corridor Light Rail Transit Feasibility Study
NORTH SAN JOSE ADP May 18th, 2019 BIA RPC Meeting.
Presentation transcript:

1 Matadero Creek Trail Midtown Resident Association April 16, 2013

2 Background Bicycle & Pedestrian Transportation Plan Across Barrier Connections ABC 1: Adobe Creek Highway 101 Overcrossing ABC 2: Caltrain/Alma Barrier at Matadero Creek 2. Trails and Shared Use Pathways TR3: Matadero Creek to Bryant St Bike Boulevard 3. Bicycle Boulevard BB4: Ross Road/Louis Rd Bicycle Boulevard 4.Bike Lanes/Sharrows/Enhanced Bikeways 5.Intersection Spot Improvements 6.Programs (Infrastructure) PR1: Safe Routes to School (El Carmelo - JLS Middle School – Hoover) PR7: Safe Routes to Parks (Hoover – Seale – Greer – Bay Lands) 7. System Rehabilitation/Maintenance 8. Design, Feasibility, and Planning F1: Matadero Creek Trail & Crossing Feasibility Study

3 Background Bicycle & Pedestrian Transportation Plan 2012 Bay to Ridge Trail Program

4 Stanford/Palo Alto Trail Program: Connecting the Bay to Ridge

5 Matadero Creek Trail

6 Matadero Creek Trail – Concept Renderings (Bryant St to Greer Rd) BeforeAfter SCVWD Preliminary Requirements: -No Lighting -Trail Curfew

7 Matadero Creek Trail Feasibility Study 1. Stanford-Palo Alto Trail Program Grant Feasibility Study a Requirement of Grant 2. Feasibility Study Elements Trail Alignment Options (Alma Street to Highway 101) Utility Considerations Intersection Crossings Trail Accessibility (No Nighttime Access – Curfew required by SCVWD) Flood Protection Connections to Public Facilities Maintenance Obligations (from SCVWD to City) 2. Feasibility Study Goals Preferred Trail Alignments for Environmental Assessments Cost Estimates Concept Drawings for ABC Connections (Alma Street and Highway 101) Feasibility Study Report for Council and SCVWD Consideration

8 Matadero Creek Trail Schedule 1. Request for Proposals – Consultant MRA Community Meeting - TODAY Release RFP Spring 2013 Select Consultant by Summer 2013 Award Contract in August Community Outreach/Feasibility Study Immediately upon Consultant is on Board 9-month Feasibility Study, complete by Summer 2014 Successful Feasibility Study Required to Continue Project 3. Environmental Assessment Neighborhood Quality of Life/Preservation Graffiti, Monitoring, Noise Flood Protection Intersection Controls

9 Questions/ Comments Project Manager: (650)