1 El Cerrito Active Transportation Plan
Community Meeting #3 Meeting to Review Draft Plan Wednesday, July 1, 2015

2 Agenda Welcome/Sign-in 6:30-6:35 Presentation 6:35-6:50
Welcome from City Plan Process to Date Public Outreach Key Plan Updates Schedule/Next Steps Questions & Answers 6:50-7:00 Open House 7:00-8:00 Review Networks and Focus Area Projects

3 City to Insert Fairmount Bike Lanes Photo
Update to the 2007 Plan City to Insert Fairmount Bike Lanes Photo Update to 2007 Plan, constructed projects to date Intended to reflect new and innovative design standards and traffic control methods Take into account neighboring jurisdication plans

4 Why now? El Cerrito Strategic Plan Climate Action Plan San Pablo Ave
Specific Plan Ohlone Greenway Plan El Cerrito Strategic Plan Active Transportation Plan Urban Greening Plan Coordination with other planning efforts

5 Plan Process to Date Review Policies & Existing Conditions
Workshop #1, Bike & Walk Audits Refresh Project List Develop Focus Study Area Concepts Workshop #2 Draft Plan Workshop #3 Adopt Plan -Ongoing coordination with the El Cerrito Urban Greening Plan and the San Pablo Avenue Specific Plan

6 Public Outreach Workshop #1 July 2013 Bike Audit August 2013
Issues & Opportunities Existing Conditions Reviewing Networks Coordinated with Urban Greening Plan & San Pablo Avenue Specific Plan Bike Audit August 2013 Ohlone Greenway, Kearney, Cerrito Creek Walk Audit August 2013 Northern El Cerrito Workshop #2 October 2013 Confirming network Review of “Focus Study Area” projects and concepts Workshop #3 June 2015 Review Draft Plan Review Focus Area Projects Public Outreach Community Meeting

7 Major Updates to the ATP: Project List “Refresh”
“Refresh” project list A lot of has changed since the 2007 plan in the world of biking and walking. There are new state requirements for what must be included in Active Transportation Plans, and a lot of a great best practices documents on how to create comfortable and safe improvements for people who walk and bikes As such, we revisited the project list to make sure that the improvements reflected that latest and greatest design solutions

8 Major Updates to the ATP: Development of “Focus Study Area” Projects
The main emphasis of this update is on the creation of “focus study area” project for key locations in the City Concepts, cost estimates, and project info for each of nine projects Emphasis on transit access, trail access, and low traffic stress bikeways and walkways “Fact Sheets” to make the project competitive for grant funding

9 Major Updates to the ATP: Coordination with Urban Greening & San Pablo Avenue Specific Plans
Coordinated with the major planning efforts that occurred in the past two years in El Cerrito: The Urban Greening Plan, which is currently in draft form The San Pablo Avenue Specific Plan, for which improvements for biking and walking improvements were developed on the length of San Pablo Avenue, adopted

10 Bikeways Network Low traffic stress and BART/Bay Trail access focus
Addition of Bicycle Boulevard segments Special study of San Pablo Avenue through Specific Plan Cycle Track in Midtown Trade offs Noise, Botts Dots can be slippery for cyclists

11 Pedestrian Network Improved Crossings, Particularly at Uncontrolled Locations Close Sidewalk Gaps Special study of San Pablo Avenue through Specific Plan Crossing enhancements Trade offs Noise, Botts Dots can be slippery for cyclists

12 Focus Study Area Projects
BART to Bay Access Ohlone Greenway Crossings Citywide Wayfinding Arlington Boulevard Walkway Improvements East Side Bicycle Boulevard East Side Wayfinding Key Boulevard Bikeway & Walkway Improvements Fairmount Avenue Bikeway Enhancements Potrero Avenue Bikeway & Walkway Improvements San Pablo Avenue Biking & Walking Improvements Why is San Pablo Avenue Biking & Walking Improvements listed here?? Is this because of ATP grant??

13 Open House Ask questions, leave comments on the maps and concept drawings. There are 11 sets of drawings for your review: Pedestrian & Bicycle Network Maps BART to Bay Access Ohlone Greenway Crossings Citywide Wayfinding Arlington Boulevard Walkway Improvements East Side Bicycle Boulevard East Side Wayfinding Key Boulevard Bikeway & Walkway Improvements Fairmount Avenue Bikeway Enhancements Potrero Avenue Bikeway & Walkway Improvements San Pablo Avenue Biking & Walking Improvements

14 Next Steps Public Review Period June-July 2015
Environmental Review July-August 2015 Planning Commission August 2015 City Council Adoption September 2015

15 Questions & Additional Comments
Opportunities to Comment: Markup drawings with your comments tonight Submit a comment card tonight any additional comments through July 17, 2015 to the City: Speak at the Planning Commission on August 19, 2015 Speak at the Council Meeting on September 15, 2015


Download ppt "El Cerrito Active Transportation Plan"