Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator.

Slides:



Advertisements
Similar presentations
Design Constraints For Engineering Projects
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Finally! – A Process that Looks at Environmental Risk Early J. S. Irving Environmental Compliance Idaho National Laboratory.
1 BROOKHAVEN SCIENCE ASSOCIATES Environment, Safety and Health Steve Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting March 29, 2012.
April EMS is Environmental Management System. It is the environmental component of the Jefferson Lab ISMS. The System comprises a tiered series.
6/2/2015 VEHS 1 Safety in the Workplace BME/CompE/EE/ME 297 Senior Design Seminar Robert Wheaton, MPH, CIH Vanderbilt University Director, Vanderbilt Environmental.
Safety Oversight for SLAC Accelerator Department Operations
SLAC ES&H Overview Craig Ferguson March Operating Model ES&H Mission Critical Issues Challenges Path forward Topics October 2008.
Developing a Chemical Risk Management Program
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
Permit to Work Procedure Document Number: KOC.SA.004
Saint Charles, IL IASBO Facilities Management Committee Presentation 1 What Don’t I Know About Facility Management ? 60 th Annual Conference.
Sandia is a multi-program laboratory operated by Sandia Corporation, a Lockheed Martin Company, for the United States Department of Energy’s National Nuclear.
Safety & Project Management by NABEEH JUM’AH. Eye on Safety  Proactive  Reactive.
Engineering Standards Working Group Annual Meeting June 24-25, 2002 DOE Nevada Support Facility June 2002 Joe B Stringer, PE Framatome ANP DE&S.
Manitoba Pork Council Loss Prevention Program Strategy A Detailed Explanation of the Loss Prevention Program Miles Beaudin, MBA, BSc.Ag., P.Ag.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
The NuMI ES&H Experience with Application to DUSEL Don Cossairt & Mike Andrews September 22, 2008.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
RISK ASSESSMENT AND MANAGEMENT
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
Competent Person for Construction. What is a “competent person?” v Capable of identifying Existing and predictable hazardsExisting and predictable hazards.
Job Safety Analysis (JSA)
Integrating ISMS Safety Concepts and Tools into the Design of CH2M HILL’s Demonstration Bulk Vitrification System September 12-13, 2006.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Industrial Risk Control
Source Control Phases I-II: Source Control Phases I-II: Main findings  Facility: drinking water and sewage treatment utility in Apatity, Murmansk region,
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Unraveling the Assessment Gordian Knot D. L. Lester, CM Savannah River Remediation, LLC.
Overview of TFTR D&D Hazards Jerry Levine Head, Environment, Safety & Health.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Energy, Environment and National Security Directorate (EENS) Best Management Practices in the Experimental Safety Review Program Robert Doty Experimental.
This Project is funded by the European Union Project implemented by Human Dynamics Consortium This project is funded by the European Union Projekat finansira.
ST/MAforLHC April 2003Sixth ST workshop1 Summary of ST/MA deliverables for LHC Luigi Scibile for the ST/MA group.
September 19-20, 2007 E. Lessard EBIS Safety EBIS Project Safety Ed Lessard September 19-20, 2007 DOE Annual Review.
HSE-LSA HSE procedure foresees a Launch Safety Agreement for all new project –this is since several year made systematically for all new projects. The.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
© Module 4—Hazard Prevention and Control Safety Management Worksite Analysis Management Commitment and Employee Involvement Hazard Prevention and.
EUROn Safety 13/06/2012M. Dracos1. Safety workshop 13/06/2012M. Dracos2 A first two days safety workshop has been organized at CERN last May (
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
California State Lands Commission Mineral Resources Management Division Long Beach Unit Safety & Environmental Audit Proposal June 23, 2011 Mineral Resources.
January 4, 2007 RHIC II Project Internal Cost Review Ed Lessard ESH D R A F T Project Overview.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Demonstrating and Promoting Best Techniques and Practices for Reducing Health Care Waste to Avoid Environmental Releases of Dioxins and Mercury Project.
James C. Liu 1 and Lawrence S. Walker 2 1. SLAC National Accelerator Laboratory, CA, USA 2. Brookhaven National Laboratory, NY, USA 1. Introduction ANSI.
© 2012 Delmar, Cengage Learning Chapter 11 Engineering Controls.
Supervisor services. Project manager Technological group Chief supervisor Supervisors facilities HSE Quality engineer HSE engineer Administrative support.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Mike Scharfenstein LUSI DOE Review August 19, 2008 ES&H Overview p. 1 LCLS Ultrafast Science Instruments (LUSI) M. Scharfenstein.
Mu2e Target Hall Remote Handling - Contamination Control, Schedule, Risk & Conclusions Ryan Schultz Deputy L3 Manager Target Station 11/17/2015.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
Work by contractors And Safety Coordination CONTRACTORS ’ ACTIVITIES What is the role of TSOs when contractors are working in their area? HSE Unit - Olivier.
Task Manager Construction Coordinator Training -- EMS-- Fermilab 95% of Asbestos found is either Amosite or Chryosotile95% of Asbestos found is either.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
1 Interfaces, Engineering and Standards. 2 Interfaces LoKI Interface document description for deliverables Elements: PBS number, Deliverable description,
Author: Eng. Abdel-Razek Rashwan QHSE Senior Consultant CAE-Egypt Safety in Global.
LCLS-II ES&H Requirements: Subcontractors
Environmental, Safety, and Health
ENVIRONMENTAL PROTECTION External EHS Expert Panel Workshop
Preview of Access Processes for Working at SURF
Chemical Safety and Security Plan
Research and Test Reactor Decommissioning Inspections
HAZOP Guidewords Base Set
Installation Binder / IRR – an example
Course Structure.
Design Constraints For Engineering Projects
DOE Review of the LCLS Project October 2006
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

Michael P. Andrews NuMI Shutdown & Facility Coordinator LBNE Project ESH Manager AD ESH Special Projects Coordinator

 Project ESH Staffing  ESH Standards & Codes  Project Design Phase  Project Construction Phase  Project Installation Phase  Beamline/Experimental Operational Phase  Maintenance & Repair Activities

 Project ESH Manager ◦ Radiation Safety ◦ Environmental Protection ◦ ESH Construction Field Support  Matrix ESH Support Functions ◦ Industrial Hygiene Support ◦ Fire Protection Engineer ◦ Life Safety ◦ Cryogenic Safety ◦ Ventilation

 Fermilab ESH Manual ◦ OSHA/NFPA/ASME/ANSI/ASHRAE/EPA  DOE ESH Orders ◦ Integrated Safety Management (ISM) ◦ Worker Safety 440.1B  Environmental 451.1B ◦ NEPA Compliance  Categorical Exclusion  Environmental Assessment (EA)  Environmental Impact Statement (EIS)  Good Management Practice

 Preliminary Safety Assessment Document  Construction Hazards  Natural Phenomena Hazards  Environmental Hazards  Waste Hazards  Fire Hazards  Electrical Hazards  Noise, Vibration, Mechanical Hazards  Cryogenic Hazards  Radiation Hazards  Accelerator/Beamline Hazards  Chemical/Hazardous Material Hazards  Confined Space  Experimental Operations

 Preliminary Life Safety Assessment ◦ Facility Description ◦ Applicable Codes & Standards ◦ Areas of Recommendation  Construction  Compartmentation  Smoke Control  Means of Egress  Automatic Fire Sprinkler & Standpipe Systems  Fire Detection & Alarm Systems  Emergency Power  Emergency Preparedness

 Preliminary Shielding Documentation ◦ Radiation Modeling  Shielding ◦ Ventilation Modeling  Air Decay  Environmental Reviews ◦ NEPA  Internal Design Reviews ◦ ESH, Electrical, Mechanical, Structural  Technical Board Design Reviews ◦ External Reviews ◦ ESH, Mechanical, Electrical, Schedule, Budget, QA

Tunnel Boring MachineConstruction Tunnel

 Finalized Hazard Assessment Document  Finalized Fire Protection & Life Safety Assessment  Project Construction Project Safety & Health Plan  Subcontractor Selection Process ◦ Develop Minimal Bid Criteria  Contractual Flow Down of ESH Requirements to Subcontractors  Daily Work Planning & Hazards Analysis  Waste Water Management & Treatment Plan ◦ Apply for Necessary Permits

Water TreatmentRock Bolting

 Project Installation Plan  Project Integrated Safety Management Plan  Daily Planning Meetings ◦ Both All Hands & Management Level  Detailed Task Oriented Hazard Analysis  Specialized Equipment Installation Carts ◦ Design Reviews Completed ◦ Operational Procedures Developed  Transition from Fixed Price to Time & Materials Construction Activities ◦ Training

Radioactive Cooling Water Systems Operational Components

 Shielding Assessment ◦ Defines Facility & Operational Shielding Requirements  Safety Assessment Documentation ◦ Defines Operational ESH Requirements  Air Management & Monitoring Systems ◦ Monitoring for Air Releases ◦ Dehumidification Systems - Tritium  Water Monitoring & Management ◦ Tritium Sampling ◦ Condensate Evaporators

Radioactive ComponentsHigh Radiation Areas

Component Radiation Safety Mapping Shielded Transport Coffins

 Training ◦ Radiation Worker ◦ Crane Operators ◦ LOTO ◦ Underground Safety ◦ Hoisting & Rigging  Work Planning ◦ Over-All Schedules Disseminated ◦ Daily Pre-Shift Work Planning Meetings  Support Personnel ◦ Scientific, Engineers, ESH personnel working together to develop plans

 Radiation Safety ◦ ALARA Plans ◦ Radiation Safety Professional on-site ◦ Radiation Dosimetry ◦ Protective Clothing  Hot Handling Procedures ◦ Developed & Trained on  Tools & Equipment ◦ Transportation Rail System ◦ Long Handled Tools ◦ Specialized Cutting Tools

Survey & AlignmentExplosives for Blasting

Large Hall Excavations Large Equipment Rigging & Installation

 Clearly Defined of ESH Requirements & Goals  ESH Involvement in Design & Review  Solid Work Planning  Communication  Hazard Assessment  Radiation Safety ALARA Plans  Trained Support Personnel