L. Greiner 1HFT PXL BNL FTF– September 27, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,

Slides:



Advertisements
Similar presentations
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
Advertisements

STAR Pixel Detector Phase-1 testing. 22 Testing interrupted LBNL-IPHC 06/ LG Lena Weronika Szelezniak born on May 30, 2009 at 10:04 am weighing.
STAR Pixel Detector Latch-up in Phase-1, SUZE and Mimosa22 Tests and analysis by Michal Szelezniak.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR PXL Sensors Overview.
PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
L. Greiner1HFT Hardware 09/23/2010 STAR Vertex-6 based PXL RDO board Design concept and items for discussion.
M.J. LeVine1STAR HFT meeting, Sept 27-28, 2011 STAR SSD readout upgrade M. LeVine, R. Scheetz -- BNL Ch. Renard, S. Bouvier -- Subatech J. Thomas -- LBNL.
Endcap Muon meeting: UC Davis, Feb , 2005 J. Hauser UCLA 1 TMB and RAT Status Report Outline: Current status of TMB and RAT boards Noise measurements.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT Plans for the next year A short report on review results and plans for TPC – Time Projection.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Project Status.
L. Greiner1SLAC Test Beam 03/17/2011 STAR LBNL Leo Greiner, Eric Anderssen, Howard Matis, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
LBNL Michal Szelezniak, Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
Research and Development for the HFT at STAR Leo Greiner BNL DAC 03/15/2006.
L. Greiner 1PXL BNL Safety Review– September 26, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR Heavy Flavor Tracker Overview With parameters pertinent to the PXL Sensor and RDO design.
MS, LG, XS PXL ladder tests at IPHC, May 1-7, Preliminary Ladder Testing Results At IPHC MS, XS, LG.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
Leo Greiner schedule Evolution of Tasks and Schedule.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR Hardware Prototyping Status.
H. Wieman1STAR HFT CD1 Review, BNL, November 2009 STAR HFT PIXEL Detector WBS 1.2 Howard Wieman LBNL.
PXL Electronics Status update for HFT TC meeting on October 14, 2010 at BNL 1HFT TC 05/11/ LG.
L. Greiner 1IPHC meeting – September 5-6, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak,
L. Greiner 1PXL Detector Progress – July 2013 STAR HFT LBNL Leo Greiner, Eric Anderssen, Giacomo Contin, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
1 Jim Thomas - LBL 4.2 Meters ~ 1 Meter The SSD: March Face to Face Meeting Jim Thomas Lawrence Berkeley Laboratory March 14 th, 2012 The SSD.
L. Greiner1IPHC-LBNL Phone Conference 05/2011 STAR IPHC-LBNL Phone Conference News and PXL sensor (Ultimate) testing at LBNL.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
1 DAQ for FVTX detector Implementation Mark Prokop Los Alamos National Laboratory.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
1 PIXEL H. Wieman HFT CDO LBNL Feb topics  Pixel specifications and parameters  Pixel silicon  Pixel Readout uSTAR telescope tests 
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
MAPS based vertex detector at STAR Michal Szelezniak 1 on behalf of: E. Anderssen 1, X. Dong 1, L. Greiner 1, J. Kapitan 2,S. Margetis 3, H. Matis 1, H.G.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
HFT PIXEL Detector Director’s review May-2009 Wieman 1.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
L. Greiner1PXL Sensor and RDO review – 06/23/2010 STAR PXL Detector Sensor and RDO Review Introduction.
Michal Szelezniak – LBL-IPHC meeting – May 2007 Prototype HFT readout system Telescope prototype based on three Mimostar2 chips.
Leo Greiner PIXEL Hardware meeting HFT PIXEL detector LVDS Data Path Testing.
MS IPHC-LBL phone meeting, July 10, Ladder Testing at IPHC and LBL.
J. Prast, G. Vouters, Arlington, March 2010 DHCAL DIF Status Julie Prast, Guillaume Vouters 1. Future CCC Use in DHCAL Setup 2. Calice DAQ Firmware Implementation.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
HFT DOE Review July 17-18, 2012 The Silicon Strip Detector WBS 1.4 Jim Thomas Lawrence Berkeley National Laboratory SSD.
1 The STAR Pixel Upgrade H. Wieman Heavy Quark Workshop LBNL 1-Nov-2007.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
L. Greiner 1FEE 2014 – STAR PXL Vertex Detector STAR HFT LBNL Leo Greiner, Eric Anderssen, Giacomo Contin, Thorsten Stezelberger, Joe Silber, Xiangming.
L. Greiner 1St. Odile CMOS Workshop – September 6-9, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
LU and SEU testing at STAR and LBNL 88” cyclotron LU tests at STAR LU and SEU tests at the 88” cyclotron Test integration with IPHC Test plans IPHC – LBL.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
.1PXL READOUT STAR PXL READOUT requirement and one solution Xiangming Sun.
Investigating latchup in the PXL detector Outline: What is latchup? – the consequences and sources of latchup – techniques to reduce latchup sensitivity.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
LBNL Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
L. Greiner 1Project X Physics Study, Fermilab, June 18, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
1 PIXEL H. Wieman HFT CDO LBNL Feb topics  Pixel specifications and parameters  Pixel silicon  Pixel Readout uSTAR telescope tests 
The STAR Heavy Flavor Tracker PXL detector readout electronics
Leo Greiner, Eric Anderssen, Howard Matis,
Presentation transcript:

L. Greiner 1HFT PXL BNL FTF– September 27, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Michal Szelezniak, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach IPHC Strasburg Marc Winter CMOS group The STAR-PXL sensor and electronics Progress report for FTF

2HFT PXL BNL FTF– September 27, 2011 L. Greiner STAR HFT Talk Outline Technical progress Expected progress for the next 6 months Resource overview and needs Slow control considerations, interlocks Lab space needs at BNL

3HFT PXL BNL FTF– September 27, 2011 L. Greiner STAR HFT Technical Progress (Sensor) Fabrication of Ultimate sensor pre-production prototype Meets PXL requirements and will be used for the prototype detector. However: there are some caveats in the function of this pre-production sensor prototype. Delivered March 24, 2011 Tested by IPHC

4HFT PXL BNL FTF– September 27, 2011 L. Greiner STAR HFT Technical Progress (Sensor) Functional anomalies of pre-production prototype High power on current draw on VDDA – up to 500mA for un-configured sensors. Analog marker does not function at 160 MHz High dispersion in analog outputs. VCLP regulator has low yield (possible ESD cause) START has a 1 clock indeterminacy SIZE These issues will be addressed (as changes are prudent) in a redesign and resubmission to be done received by Q1 2012

5HFT PXL BNL FTF– September 27, 2011 L. Greiner STAR HFT Technical Progress (RDO) Pre-production RDO system has been designed Board form factors have been established. Design of RDO motherboard, daughter card, TCD receiver board, Xilinx flashXL PCB complete. PCBs for above boards have been produced and loaded. Power on tests are good. See next 2 slides

6HFT PXL BNL FTF– September 27, 2011 L. Greiner STAR HFT Production System Design SIU JTAG USB Daughter Card SIU JTAG USB Daughter Card SIU JTAG USB Daughter Card SIU JTAG USB Daughter Card SIU JTAG USB Daughter Card SIU JTAG USB Daughter Card SIU JTAG USB Daughter Card SIU JTAG USB Daughter Card SIU JTAG USB Daughter Card SIU JTAG USB Daughter Card STAR TCD We will use the 9U VME physical standard for RDO motherboards. (Not the electrical standard) 1 standard VME crate with P1 backplane for STAR TCD distribution. Data from sectors arrives via cables plugging into the back of the RDO boards in the P2/P3 locations. System consists of: 10 double wide 9U VME RDO boards 1 single wide 6U VME TCD board 356 M pixel readout in a single 9U VME crate Standard 21 slot 9U VME crate

7HFT PXL BNL FTF– September 27, 2011 L. Greiner STAR HFT Production Prototype RDO board SIU Daughter Card USB JTAG VME P1 Ladder Data Connectors Xilinx Virtex-6 FPGA

8HFT PXL BNL FTF– September 27, 2011 L. Greiner STAR HFT Technical Progress (Latch-up) Completed tests of LU and SEU for Ultimate sensor, Mimosa-26 and all components to be used in the ladder and MTB in testing at the 88” cyclotron at LBNL. Completed a test of Mimosa-26 sensors run in STAR for the last running period. ~ 1 week of protons and full run of Au. Estimate of LU events for STAR running of full detector is.3 / hr. (scaling with radiation field) LU and SEU onset LET in sensors is consistent with previous measurements. LU and SEU onset LET for ladder and MTB components is higher than for sensors.

9HFT PXL BNL FTF– September 27, 2011 L. Greiner STAR HFT Technical Progress (Ladder) confId= The performance of Phase-1 sensors is independent of the ITB configuration, especially the number of high-frequency decoupling capacitors on the board. Both, analog and digital readout modes confirm this observation. The performance is not degraded even after removing all small capacitors associated with VDD, VDA and VCLP voltages. Test results obtained from threshold scans suggest that the bus-type power distribution provides, on average, a slightly better noise performance but with an increased FPN. Analog test results for the bus-type power distribution indicate that there is no noticeable degradation of the sensor performance. ITB Testing 10 Phase-1sensors in ladder configuration

10HFT PXL BNL FTF– September 27, 2011 L. Greiner STAR HFT Expected Progress for next 6 months Test and validate new pre-production RDO system. Beam test Phase-1 and Ultimate sensor telescopes at CERN beam test. Design and fabricate Ultimate based ladder cable. Complete probe testing system for Ultimate sensors. Procure and dice/thin 12 wafers of Ultimate sensors. Begin testing of Ultimate based ladder cable. Produce kapton/Cu cable design. Re-design of pre-production MTB boards. Begin production of RDO production boards. Complete cable length tests with new VHDCI based data transmission cables. PXL safety review.

11HFT PXL BNL FTF– September 27, 2011 L. Greiner STAR HFT Resource overview and needs In addition to myself, Xiangming Sun, Michal Szelezniak and Jo Schambach we anticipate needing the following engineering assistance; Engineers have been located and mostly committed at the proper level of effort based on the task needs. (Note – TS and CV will use less hours than what is in the schedule) Other than the sensor procurement (already placed), we do not expect to make any large (>$50k) procurements in the next 6 month period.

12HFT PXL BNL FTF– September 27, 2011 L. Greiner STAR HFT Slow Control Considerations / interlocks Status of RDO system is monitored on event by event status based on headers transferred to control PCs. Information transfer on PC via shared file was agreed with Yuri. This is a longstanding agreement, subject to change under implementation by Jo. If changes are made, they will likely be to make the interface and perhaps underlying structures like the TOF. Agreement with Tonko and Jeff is that we provide a script that configures the detector and puts it into run mode. This script will be called by STAR configuration control. It will return a status word. Interlocks will be based on air flow sensors for the cooling air system for PXL. This should be a conventional STAR system to cut power to the sensors. The interface of typical slow control functions – VME crate power, programmable power supply power, etc. and alarm table definitions are yet to be fully defined.

13HFT PXL BNL FTF– September 27, 2011 L. Greiner STAR HFT Lab Space needs at BNL PXL Lab space needs at BNL are quite moderate. I estimate: 1 desk 1 locker 1 workbench Sufficient floor space to accommodate above. (this assumes that spares are located in the clean room)

14HFT PXL BNL FTF– September 27, 2011 L. Greiner STAR HFT PXL Telescope test pictures